Forwards Insp Repts 50-245/93-24,50-336/93-19 & 50-423/93-20 on 930818-0928 & Notice of Violation.Attention Directed to Fact That self-identified Violations Have Been Cited Because of Recurrent Nature of Procedure Adherence Problems
ML20058D311
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 11/22/1993
From: Blough A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Opeka J
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20058D316 List:
References
NUDOCS 9312030125
Download: ML20058D311 (3)


See also: IR 05000245/1993024

Text

'

t a

y

mfr

'

1

, .

NOV 2 21993

Docket Nos. 50-245

50-336

50-423

Mr. John F. Opeka

Executive Vice President-Nuclear

Northeast Nuclear Energy Company

P.O. Box 270

Hartford, Connecticut 06141-0270

Dear Mr. Opeka:

SUBJECT:

MILLSTONE COMBINED INSPECTION 50-245/93-24: 50-336/93-19;

50-423/93-20

l

This refers to the safety inspection conducted by Mr. P. Swetland and others of this office on

l

August 18,1993 through September 28,1993, at Millstone Station in Waterford,

Connecticut. The preliminary findings were discussed with Mr. S. Scace, the Unit

Directors, and others of your staff at the conclusion of the inspection. Areas examined

during the inspection are described in the enclosed report. Within these areas, the inspection

focused on issues important to public health and safety, and consisted of performance

observations of ongoing activities, independent verification of safety system status and design

configuration, interviews with personnel, and review of quality records.

The inspectors identified that certain requirements of the Unit 2 license were not

implemented during the inspection period. These included failure to follow procedure steps

for the calibration of radiation monitoring instruments, and failure to conduct inservice

inspections of auxiliary feedwater system pipe supports. Two violations of NRC

requirements concerning these problems are cited in the enclosed Notice of Violation. Your

attention is directed to the fact that these self-identified violations have been cited because of

the recurrent nature of procedure adherence problems in the Unit 2 instrumentation

organization, and the prolonged period during which inservice inspection was not performed

on the auxiliary feedv/ater system pipe supports despite several reviews of potential generic

weaknesses on these supports. In your response to the Notice of Violation enclosed with this

letter, please provide your evaluation of the need for remedial action regarding your self-

j

l

assessment and corrective action programs.

You are required to respond to the enclosed Notice of Violation and should follow the

l

instructions in the enclosed Notice when preparing your response. In accordance with

l

10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and the enclosed

i

l

Notice wi!! be placed in the NRC Public Document Room. The responses directed therein

are not subject to the clearance procedures of the Office of Management and Budget as

required by the Paperwork Reduction Act of 1980, Public Law 96.511.

9322030325 931122

\\i

PDR

ADDCK 05000245

OFFICIAL RECORD COPY

O

PDR

I

-

o.

Nov y g gn

.

.

Mr. John F. Opeka

2

During this inspection we also evaluated your self-identification and correction of problems

related to a non-seismically mounted service water branch line at Unit 1 and failure to

!

I

conduct a containment closure evaluation for steam generator manways at Unit 3. We

determined that your corrective actions for these issues were acceptable and the specific

,

'

problems had minimal safety consequences. Therefore, in accordance with Section Vll.B of

the Enforcement Policy, enforcement discretion was exercised and violations were not cited

for these cases.

l

We appreciate your cooperation.

Sincerely,

A. Randolph Blough, Chief

Projects Branch No. 4

Division of Reactor Projects

Enclosures:

1.

Notice of Violation

2.

NRC Combined Inspection Report 50-245/93-24; 50-336/93-19; 50-423/93-20

l

cc w/encls:

S. E. Scace, Vice President, Millstone Station

H. F. Haynes, Nuclear Unit Director, Unit 1

G. H. Bouchard, Nuclear Unit Director, Unit 2

l

F. R. Dacimo. Nuclear Unit Director, Unit 3

l

R. M. Kacich, Director, Nuclear Licensing

'

J. M. Solymossy, Director of Nuclear Quality and Assessment Services

l

Gerald Garfield, Esquire

l

Nicholas Reynolds, Esquire

Ernest C. Hadley, Esquire

P. Blanch

K. Abraham, PAO (2)

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of Connecticut SLO

OFFICIAL RECORD COPY

l

._

i

-

.

NOV 2 21993

.

'

_

Mr. John F. Opeka

3

bec w/encls:

Region I Docket Room (with concurrences)

,

i

R. Blough, DRP

L. Doerflein DRP

W. Raymond, SRI, Haddam Neck

P. Swetland, SRI, Millstone

P. Lmser, NRR (Section 4.5)

,

bec w/encls (VIA E-MAIL)

J. Stolz, NRR/PD I-4

V. McCree, OEDO

D. Jaffe, PM, NRR

J. Andersen, PM, NRR, Unit 1

G. Vissing, PM, NRR, Unit 2

V. Rooney, PM, NRR, Unit 3

R. Barkley, DRP

i

i

1

RI:DRP

I

'

)

ein

j

gSwetland/meo

Doprf]93

11/18/93

1(/4/

ffji, fp

6

OFFICIAL RECORD COPY

G:\\ BRANCH 4\\93241920.123

~.

-

,

y