Notice of Violation from Insp on 900730-0919.Violation Noted:Both Trains of Control Room Emergency Recirculation Sys Inoperable & Not Capable of Fulfilling Intended Safety Functions
ML20058D217
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 10/19/1990
From: Knop R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20058D216 List:
References
50-440-90-18, NUDOCS 9011050410
Download: ML20058D217 (1)


Text

.fr 9-NOTICE OF VI0lATION

'The Cleveland Electric Illuminating License No, NPF-58 '

Company As a result of the inspection conducted on July 30 through September 19, 1990, a violation of NRC requirements was identified, In accordance with the " General Statement of Po'licy and Procedure for NRC Enforcement Actions,"

10 CFR Part 2, Appendix C (1990), the violation is listed below:

10 CFR 50,72(b)(2) required that the licensee notify the NRC as soon as practical and in all cases, within four hourslof the occurrence of any event or condition that alone could have prevented the fulfillment of the safety-function.of needed stru.tures or systems.

Contrary to the above, at 12:10. a.m. (EDT), on September 1,1990, plant personnel identified that both; trains-of the control room emergency recirculation system were inoperable and not capable of fulfilling the intended safety function.

Notification to the NRC was'made at 1:00 p.m. on September 1, 1990, which was beyond the four hour notification limit.

ThisLis a Severity Level IV violation (Supplement 1) (50-440/90018-02(DRP)),

Pursuant to the provisions of 10 CFR 2,201, you are required to submit to this-office within thirty days of the date of this NoMce a written statement or explanation in reply, including for each violation:

(1) corrective action taken-and the results achieved; (2) corrective action to be taken to avoid further violations; and (3) the date when full compliance will be achieved.

. Consideration may be given to extending your response time for good cause

shown, I

gg c g J00T _191990 Dated Richard C. Knop, Chief

(

Reactor Projects Branch 3 i

[

1 r

I 9011050410 901019 PDR ADOCK 050CK1440 G