Forwards IE Insp Repts 50-245/82-12 & 50-336/82-12 on 820509-0626.No Noncompliance Noted
ML20058C755
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 07/09/1982
From: Starostecki R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Counsil W
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20058C758 List:
References
NUDOCS 8207260439
Download: ML20058C755 (2)


See also: IR 05000245/1982012

Text

'

i

.

.

JUL 0 91982

Docket Nos. 50-245

License Nos. DPR-21

50-336

DPR-65

Northeast Nuclear Energy Company

ATTN: Mr. W. G. Counsil

Senior Vice President - Nuclear

Engineering and Operations Group

P. O. Box 270

Hartford, Connecticut 06101

Gentlemen:

Subject:

Inspection Nos. 50-245/82r12 and 50-336/82-12

This refers to the routine safety inspection conducted by Mr. J. Shediosky and

Mr. D. Lipinski of this office on May 9, through June 26, 1982 at the Millstone

Nuclear Station, Waterford, Connecticut of activities authorized by NRC License

Nos. DPR-21 and DPR-65 and to the discussions of our findings held by Mr. Shedlosky

with Mr. Mroczka and others of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the NRC Region I Inspection

Report which is enclosed with this letter. Within these areas, the inspection

consisted of selective examinations of procedures and representative records,

Interviews with personnel, measurements made by the inspector, and observations

by the inspector.

Within the scope of this inspection, no violations were observed.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will

be placed in the NRC Public Document Room unless you notify this office, by tele-

phone, within ten days of the date of this letter and submit written application

to withhold information contained therein within thirty days of the date of this

letter. Such application must be consistent with the requirements of 2.790(b)(1).

The telephone notification of your intent to request withholding, or any request

for an extension of the 10 day period which you believe necessary, should be made

to the Supervisor, Files, Mail and Records, USNRC Region I, at (215) 337-5?23.

No reply to this letter is required.

Your cooperation with us in this matter

I

is appreciated.

Sincerely,

Original Signed Byt

Richard W. Starostecki, Director,

Division of Project and Resident

Programs

%bh/

Enclosure: Combined NRC Region I Inspection Report Number

50-245/82-12; 50-336/82-12

0FFICIAL RECORD COPY

.

r

8207260439 820709

PDR ADOCK 05000245

G

PDR

u

.

.

Millstone 1, 2

2

JUL 0 91982

cc w/ encl:

J. F. Opeka, Vice President, Nuclear Operations

E. J. Mroczka, Station Superintendent

D. G. Diedrick, Manager of Quality Assurance

R. T. Laudenat, Manager, Generation Facilities Licensing

Pubitc Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Thomas Smith, SRI, Haddam Neck

State of Connecticut

bcc w/ encl:

Region I Docket Room (with concurrences)

Chief, Operational Support Section (w/o encis)

1

RI:$

t'

RI:DPRP

R

E

Shedlosk as

Elsasser

Brypner

l

7/7/82

1h[gv

~//y

y

0FFICIAL RECORD COPY