Forwards IE Insp Repts 50-280/82-14 & 50-281/82-14 on 820601-04.No Noncompliance Noted
ML20058C328
Person / Time
Site: Surry  Dominion icon.png
Issue date: 06/29/1982
From: Dance H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Leasburg R
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
Shared Package
ML20058C330 List:
References
NUDOCS 8207260317
Download: ML20058C328 (2)


See also: IR 05000280/1982014

Text

kl./ON

s

%.

JUN 291982

.

Virginia Electric and Power Company

ATTN: Mr. R. H. Leasburg, Vice President

Nuclear Operations

P. O. Box 26666

Richmond, VA 23261

Gentlemen:

Subject: Report Nos. 50-280/82-14, 50-281/82-14

This refers to the routine safety inspection conducted by Mr. C.M. Hosey of this

of fice on June 1-4,

1982, of activities authorized by NRC Operating License

Nos. DPR-32 and DPR-37 for the Surry facility and to the discussion of our

findings held with Mr. R. F.

Saunders, Assistant Station Manager, at the

conclusion of the inspection.

Areas examined during the inspection and our findings are ' discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

We have examined actions you have taken with regard to previously identified

enforcement matters and unresolved items. The status of these items is discussed

in the enclosed report.

One new unresolved item resulted from this inspection and is discussed in the

enclosed report. This item will be examined auring subsequent inspections.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will

be placed in the NRT s Public Document Room unless you notify this office, by

telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days of the

date of this letter. Such application must be consistent with the requirements

of 10 CFR 2.790(b)(1).

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

Original signed by:

R. C. Lewis /for

H. C. Dance, Chief

Reactor Projects Branch 2

Division of Project and

Resident Programs

Enclosure (See Page 2)

8207260317 820629

PDR ADOCK 05000280

f[Q

G

PDR

. .

. . . .

Virginia Electric and Power Company

2

JtJN 2 91982

Enclosure:

Inspection Report Nos. 50-280/82-14,

50-281/82-14

CC W'9"cl:

J. H. Ferguson, Executive

Vice President-Power

J. L. Wilson, Station Manager

P. O Godwin, Director, Nuclear Security

bcc w/ encl:

Document Management Branch

Commonwealth of Virginia

fl

h

RII

RII

RII

RII

RII

dpV

&

De

y

C 6k/:Es

KPBarr

AFGibson

KD ndis

HCDa e

,

6

/82

6/12 82

6/,f/82

6

/82

6Sy/82

/