ML20058C310
| ML20058C310 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 07/19/1982 |
| From: | Alden W PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | Haynes R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| Shared Package | |
| ML20058C313 | List: |
| References | |
| NUDOCS 8207260312 | |
| Download: ML20058C310 (1) | |
Text
_ _ _.
PHILADELPHIA ELECTRIC COMPANY 23O1 MARKET STREET P.O. BOX 8699 PHILADELPHIA. PA.19101 1215)841-4000 July 19, 1982 Docket Nos. 50-277-50-278 Mr.
R.
C. Haynes, Administrator Region I U.S. Nuclear Regulatory Coinmission 631 Park Avenue King of Prussia, PA 19406
SUBJECT:
Annual Plant Modification Report File:
GOVT l-1
Dear Mr. Haynes:
Enclosed, please find the 1981 Annual Plant Modification Report for Peach Bottom Atomic Power Station, Facility Operating Licenses Nos. DPR-44 and DPR-56.
This report is submitted in fulfillment of the reporting requirements of 10CFR 50.59 describing changes to the facility as the facility is described in the safety analysis report.
Sincerely, W. M. Alden Engineer-In-Charge Nuclear Section Generation Division RCB:Imd cc:
Document Control Desk Washington, D.C.
8207260312 820719 PDR ADOCK 05000277 l
R PDR
-_j
_ _ _ _ _ - - _ _ _