ML20058C271

From kanterella
Jump to navigation Jump to search
Proposed Tech Specs,Deleting Specific Titles & Replacing W/ Generic Statements
ML20058C271
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 11/19/1993
From:
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
Shared Package
ML20058C268 List:
References
NUDOCS 9312020404
Download: ML20058C271 (3)


Text

. __ _ ___ _

l l

i i

i i

i e

t

.r i

i i

't ATTACHMENT 2 l

PEACH BOTTOM ATOMIC POWER STATION i

UNITS 2 and 3--

l Docket Nos. 50-277

'I 50-278-l License Nos. DPR-44

' l DPR-56 i

r TECHNICAL SPECIFICATIONS CHANGES i

93-14 List of Attached Pages t

Unit 2 Unit 3 246 246 i

l 5

- 1 i

i I

I

.l l

9312O20404 931119

'n PDR ADOCK 05000277 p

PDR

~. - _, _

,,....,.-2._.

Unit 2 PBAPS 6.3 Facility Staff Qualifications 6.3.1 Each mamber of the facility staff shall meet or exceed the minimum qualifications of ANSI N18.1-1971 for comparable positions, except for (1) Senior - Health Physicist (radiation protection manager) who shall i

meet or exceed the qualifications of Regulatory Guide 1.8, September 1975 and (2) the Shift Technical Advisor who shall have a bachelor's degree or equivalent in a scientific or engineering discipline with specific training in plant design, and response and analysis of the plant for transients and accidents.

6.4 Trainina 6.4.1 A retraining and replacement training program for the facility staff shall be maintained under the direction of the Superintendent-Training I

and shall meet the requirements of Section 5.5 of ANSI N18.1-1971 and 10 CFR 55, Appendix A.

6.4.2 A training program for the Fire Brigade shall be conducted such that Fire Brigade members complete an instruction program within a two year period.

Regularly planned meetings will be held every 3 months.

6.5 Review and Audit 6.5.1 Plant Operations Review Committee (PORC) t 6.5.1.1 Function l

The Plant Operations Review Committee shall function to advise the Plant Manager on all matters related to nuclear safety.

6.5.1.2 Composition i

The Plant Operations Review Committee is composed of nine regular members from Peach Bottom Atomic Power Station staff. Members shall collectively have experience in the following areas:

Plant Operations Engineering Maintenance Instrumentation and Controls Planning i

Radiation Safety Chemistry Experience Assessment Members shall meet the requirements of ANSI N18.1-1971, Sections 4.2, 4.4, or 4.6 for applicable required experience and be appointed in 1

writing by the Plant Manager. The Chairman and alternate Chairmen of the PORC shall be drawn from the PORC members and appointed in writing by the Plant Manager.

6.5.1.3 Alternates Alternate members shall be appointed in writing by the PORC Chairman to serve on a temporary basis; however, no more than two alternate members shall be used to satisfy a PORC quorum (See 6.5.1.5).

j

-246-l

\\

i Unit 3 PBAPS 6.3 Facility Staff Qualifications 6.3.1 Each member of the facility staff shall meet or exceed the minimum qualifications of ANSI N18.1-1971 for comparable positions, except for (1) Senior - Health Physicist (radiation protection manager) who shall meet or exceed the qualifications of Regulatory Guide 1.8, September 1975 and (2) the Shift Technical Advisor who shall have a bachelor's degree or equivalent in a scientific or engineering discipline with specific training in plant design, and response and analysis of the plant for l

transients and accidents.

6.4 Trainino 6.4.1 A retraining and replacement training program for the facility staff shall be maintained under the direction of the Superintendent-Training and shall meet the requirements of Section 5.5 of ANSI N18.1-1971 and 10 CTR 55, Appendix A.

6.4.2 A i. raining program for the Fire Brigade shall be conducted such that Fire Brigade members complete an instruction program within a two year period.

Regularly planned meetings will be held every 3 months.

6.5 Review and Audit 6.5.1 Plant Operations Review Committee (PORC) i

6. 5.1.1 Function The Plant Operations Review Committee shall function to advise the Plant Manager on all matters related to nuclear safety.

6.5.1.2 Composition The Plant Operations Review Committee is composed of nine regular members from Peach Bottom Atomic Power Station staff.

Members shall collectively 4

have experience in the following areas:

Plant Operations i

Engineering Maintenance Instrumentation and Controls Planning i

Radiation Safety Chemistry Experience Assessment i

Members shall meet the requirements of ANSI N18.1-1971, Sections 4.2, 4.4, or 4.6 for applicable required experience and be appointed in writing by the Plant Manager. The Chairman and alternate Chairmen of the PORC shall be drawn from the PORC members and appointed in writing by the Plant Manager.

6.5.1.3 Alternates Alternate members shall be appointed in writing by the PORC Chairman to serve on a temporary basis; however, no more than two alternate members shall be used to satisfy a PORC quorum (See 6.5.1.5).

-246-

-