- Duke har Company Hst 11 %s, 3
.- PO ika 33198 i bice l>esident v,
- Chailotte, N C N20
, Nuclear Production (70 6 173 4511 DUKEPOWEft October 23,_1990 y
-U. S.. Nuclear Regulatory Commission Attention: Document Control Desk Washington', DC 20555-i
Subject:
' Catawba Nuclear Station, Units 1 and 2?
Docket Nosi 50-413 and 50-414-'
Technical Evaluation Report for NUREG-0737.
I Item'II.D.1; J
-The NRC's letter ' dated February 5,'-1990 transmitted"the Technical: Evaluation
{!
Report (TER) for NUREG-0737, Item 11.D.1.- The'TER states.that all'the requirements of. II.D.1 have been met with he(exception of one open-item as 1
indicated in Section 5.2, page 26 of the:TER.'< The vendor supplied analysis necessary to close out this item was received.by. Duke P.ower in a letter from t
-the vendor dated May 21,l1990.:'An analysis of this report is' expected to be a
completed by January 31, 1991...However preliminary analysis suggest that no-j plant modifications will be necessary.
1 i
Very truly yours, I
r.4 k i e Hal B. Tucker
- l
.MHH71/td cc:
W. T. Orders NRC Resident. Inspector Catawba Nuclear Station i
Mr. S. B.-Ebneter Regional Administrator, Region II; j
U. S? Nuclear Regulatory Commission-Region II 101-Marietta Street, NW, Suitr. 2900
-Atlanta, GA ^30323
'Mr..K. N. Jabbour Office of Nuclear Regulation U. ' S. Nuclear Regulatory' Commission One' White Flint ~ North, Mail Stop 9H3 Washington,'DC 20555
')bb
,1,.
[0R011010026 901023 p
ADOCK 05000433 3,TEP PDC fy &
^.,
ly;
+
n,.
s
,