Forwards Reactive Safeguards Insp Rept 50-263/93-19 on 931026-29.Two Violations Noted & Being Considered for Escalated Enforcement
ML20058B996
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 11/16/1993
From: Axelson W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Antony D
NORTHERN STATES POWER CO.
Shared Package
ML20058B998 List:
References
EA-93-274, NUDOCS 9312020308
Download: ML20058B996 (2)


See also: IR 05000263/1993019

Text

p

.

.

,

NOV 161933

Docket No. 50-263

License No. DPR-22

EA 93-274

Northern States Power Company

ATTN: Mr. D. D. Antony

Vice President, Nuclear

Generation

414 Nicollet Mall

Minneapolis, MN 55401

Dear Mr. Antony:

SUBJECT: REACTIVE SAFEGUARDS INSPECTION AT MONTICELLO NUCLEAR POWER PLANT

This refers to the inspection conducted by J. L. Belanger of this office on

October 26-29, 1993. The inspection included a review of an incident

involving unsecured safeguards information at the Monticello Nuclear Power

Plant during the period of July 1990 to August 26, 1993. At the conclusion of

the inspection, the findings were discussed with those members of your staff

identified in the enclosed report.

Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, and interviews with personnel.

Based on the results of this inspection, two apparent violations were

identified; the first of which is being considered for escalated enforcement

action in accordance with the " General Statement of Policy and Procedure for

NRC Enforcement Actions" (Enforcement Policy), 10 CFR Part 2, Appendix C.

The

apparent violations involve a (1) computer disk containing significant

Safeguards Information being unsecured in the protected area from

approximately July 1990 to December 1991 and in the owner controlled area from

December 1991 to August 26, 1993; and (2) failure to mark this disk and five

others with external safeguards information markings. Accordingly, no Notice

of Violation is presently bein 'ssued for these inspection findings.

In

addition, please be advised thu. .he number and characterization of apparent

violations described in the enclosed inspection report may change as a result

of further NRC review.

An enforcement conference to discus, these apparent violations has been

scheduled for December 2,1993, at the Region III office at 1:00 p.m.

The

'

decision to hold an enforcement conference does not mean that the NRC has

determined that a violation has occurred or that enforcement action will be

taken. The purposes of thi.s conference are to discuss the apparent

violations, their causes and safety significance; to provide you the

opportunity to point out any errors in our inspection report; and to provide

an opportunity for you to present your proposed corrective actions.

In

'

addition, this is an opportunity for you to provide any information concerning

%g oN

OR.1CG

9312020300 931116

PDR

ADOCK 05000263

G

PDR

_

-}

.

.

.

Northern States Power Company

2

NOV 161933

your perspectives on:

(I) the severity of the violations; (2) the application

of the factors that the NRC considers when it determines the amount of.a civil

penalty that may be assessed in accordance with Section VI.B.2 of the

!

Enforcement Policy; and (3) any other application of the Enforcement Policy to

l

this case, including the exercise of discretion in accordance with Section

'

VII. You will be advised by separate correspondence of the results of our

deliberations on this matter.

l

No response regarding the apparent violations is required at this time.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of

this letter and its enclosure will be placed in the NRC Public Document Room.

l

Sincerely,

(original signed by P. Ting)

W. L. Axelson, Director.

Division of Radiation Safety

and Safeguards

Enclosure:

Inspection Report

No. 50-263/93019(DRSS)

cc w/ enclosure:

L. Waldinger, General Manager

W. Hill, Plant Manager

OC/LFDCB

Resident Inspector, RIII Monticello

Resident Inspector, RIII Prairie

Island

John W. Ferman, Ph.D.,

Nuclear Engineer, MPCA

l

State Liaison Officer, State

'

of Minnesota

J. Lieberman, OE

J. Goldberg, OGC

L. Callan, NRR

bec:

PUBLIC

RIII ,

% {U

(Ip

7

'RII

RI

RI I

j

97

r

ips g elso,n

j

Belanger/jp

Qaed

P

erson

'elke

11gv/93

4s\\O

l}

// /r/73

u[ff[y3

l

l