ML20058B757
| ML20058B757 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 11/22/1993 |
| From: | Collins S NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | William Cahill TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| Shared Package | |
| ML20058B762 | List: |
| References | |
| NUDOCS 9312020212 | |
| Download: ML20058B757 (4) | |
See also: IR 05000445/1993035
Text
. . . . .
. . .
. ..
.
I
-
UNITED STATES
i
, / [pA Ocgk
NUCLEAR REGULATORY COMMISSION
l
~
)*I
REGION IV
8
611 RYAN PL A2A DRIVE, SUITE 400
c
- h
-
f
ARLINGTON, TEXAS 76011-8064
p 22 g-
Dockets: 50-445
50-446
Licenses: NPF-87
NPF-89
TU Electric
ATTN:
W. J. Cahill, Jr., Group Vice President
Nuclear Engineering and Operations
Skyway Tower
400 North Olive Street, L.B. 81
Dallas, Texas 75201
SUBJECT:
NRC INSPECTION REPORT 50-445/93-35; 50-446/93-35
This refers to the inspection conducted by an NAC team from Region IV on
October 5-22, 1993. The inspection included a review of activities authorized
for your Comanche Peak Steam Electric Station, Units I and 2, facility. At
the conclusion of the inspection, the findings were discussed with you and
those trembers of your staff identified in the enclosed report.
Areas examined during the inspection are identified in the report. These
areas included reviews of modifications and design change packages, and
reviews of quality assurance audits and assessments of the engineering and
technical support organization. Within these areas, the inspection consisted
of selective examinations of procedures and representative records, interviews
with personnel, and observation of activities in progress. The observations
from this inspection are documented in the Executive Summary on page iii of.
the enclosed report.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of
this letter and its enclosures will be placed in the NRC Public Document Room.
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
Sincerely,
bN
amue
. Collins, Director
Division of Reactor Safety.
Enclosure:
Appendix - NRC Inspection Report
50 445/93-35; 50-446/93-35
9312O20212 931122
ADOCK 05000445
O
,
.
_
_ _ - - - _ - .
_ _ _ _ _ _ _ _ ___
_-
-
t
1
'
-
TV Electric
-2-
cc w/ enclosure:
TU Electric
ATTN: Roger D. Walker, Manager of
Regulatory Affairs for Nuclear
Engineering Organization
Skyway Tower
400 North Olive Street, L.B. 81
Dallas, Texas 75201
Juanita Ellis
President - CASE
1426 South Polk Street
Dallas, Texas 75224
GDS Associates, Inc.
Suite 720
1850 Parkway Place
Marietta, Georgia 30067-8237
TV Electric
Bethesda Licensing
3 Metro Center, Suite 610
Bethesda, Maryland 20814
Jorden, Schulte, and Burchette
ATTN: William A. Burchette, Esq.
Counsel for Tex-La Electric
Cooperative of Texas
1025 Thomas Jefferson St., N.W.
Washington, D.C.
20007
Newman & Holtzinger, P.C.
ATTN: Jack R. Newma.', Esq.
1615 L. Street, N.W.
-aite 1000
Washington, D.C.
20036
Texas Department of Licensing & Regulation
ATTN:
G. R. Bynog, Program Maaager/
Chief Inspector
l
Boiler Division
P.O. Box 12157, Capitol Station
Honorable Dale McPherson
County Judge
P.O. Box 851
Glen Rose, Texas 76043
.
__
.
is
.4
_
TV Electric
-3-
Texas Radiation Control Program Director
1100 West 49th Street
Owen L. Thero, President
Quality Technology Company
P 0. Box 408
201 West 3rd
Lebo, Kansas 66856-0408
.
....-- - =.-=
'
i
.1
.
TV Electric
-4-
bec to DMB (IE01)
bec distrib. by RIV:
J. L. Milhoan
Res.ident Inspector (2)
Section Chief (DRP/B)
Lisa Shea, RM/ALF, MS: MNBB 4503
MIS System
DRSS-FIPS
RIV File
Project Engineer (DRP/B)
Section Chief (DRP/TSS)
Section Chief (DRS/ES)
M. Runyan
P. Goldberg
C. Paulk
R. Vickrey
R. Mullikin
i
RIV:ES:RI
ES:RI
ES:RI
ES:RI
DRP: SRI [/ES:C
PAGoldbekk MR h Y
CPaulkC[
RBViche[ RMullikin
TFWesteSan
l
11/sa/93
si/,o/93
11/ so/93
11/,o/93
/ /rf/93
// //B/93
4
..
ADD:DRP
AD:DRP
f,
D:DRS
!
CThpfiIas
TPGwynnW7 h
SJCollins
[/ /93
6 /A /93
[
/ /93
e
..
__
'
o
.
TU Electric
-4-
-,
.bcc to'DMB (IE01)\\ k
bcc distrib. by RIV:
J. L. Milhoan
Resident Inspector (2)
Section Chief (DRP/B)
Lisa Shea, RM/ALF, MS: MNBB 4503
MIS System
DRSS-FIPS
RIV File
Project Engineer (DRP/B)
Section Chief (DRP/TSS)
Section Chief (DRS/ES)
M. Runyan
P. Goldberg
C. Paulk
R. Vickrey
R. Mullikin
I
l
l
l
l
l
DRP: SRI [/
RIV:ES:RI
ES:RI
ES:RI
ES:RI
ES:C
MR h Y
CPaulkC[
RBViche[ RMullikin
TFWesteSan
PAGoldbe
e /ta/93
- /,o/93
11/so/93
11/,o/93
/ /,f /93
// /g/93
ADD:DRP
AD:DRP
f,
D:DRS
CThMs
TPGwynn 47
3
SJCollins
[/ /93
6 /4 /93
/ /93
-
-. ---
__
_ _ - _ - _