ML20058B346
| ML20058B346 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 10/12/1990 |
| From: | Herdt A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Hairston W GEORGIA POWER CO. |
| Shared Package | |
| ML20058B348 | List: |
| References | |
| NUDOCS 9010300138 | |
| Download: ML20058B346 (3) | |
See also: IR 05000321/1990017
Text
.
et . ' 'J
'
.
g
..
.
.
2W
001 1
Docket Nos. 50-321, 50-366
Georgia Power Company
ATTN: Mr. W. G. Hairston, Ill
Senior Vice President -
Nuclear Operations
P. O. Box 1295
Birmingham, AL 35201
Gentlemen:
SUBJECT:
NRC INSPECTION REPORT N05. 50-321/90-17 AND 50-366/90-17
This refers to the inspection conducted by Ms. L. Trocine of this office and
Mr. B. L. Collins, a consultant from the Idaho National Engineering Laboratory,
on September 11-14, 1990.
The inspection included a review of activities
authorized for your Hatch facility.
At the conclusion of the inspection, the
findings were discussed with those members of your staff identified in the
enclosed Inspection Report.
Areas examined during the inspection are identified in the report.
Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observation of
activities in progress.
Within the scope of the inspection, violations or deviations were not
identified,
in accordance with the 10 CFR 2.790(a) of the NRC'sL" Rules of Practice," a copy.
of this letter and its enclosure will be placed in~ the NRC Public Ducument
Room.
Should you have any questions concerning this letter, please. contact us.
Sincerely,
fe,w (
?Ji'W
v%
Alan R. Herdt, Chief
Reactor Projects Branch 3-
Division of Reactor Projects
Enclosure:
c
l
NRC Inspection Report
cc w/ encl:
(See page 2)
o010300138 901012
ADOCK0500ggi
DR
re o/
.
.
,
, . -
.
.
_,
,.
.
.
,
Georgia Power Company-
2
OCT 12 1990 '
,
cc w/ encl:
~
R. P. Mcdonald, Executive Vice
r
President, Nuclear Operations
. Georgia Power Company-
P. O. Box 1295
-Birmingham, AL 35201
-J. T.-Beckham
Vice President, Plant Hatch
Georgia Power' Company
P;-0.- Box 1295
Birmingham, AL 35201.
H. C. Nix
General Manager, Plant Hatch
Route l', Box.439
.
Baxley, GA . 31513
S. J. Bethay
Manager Licensing - Hatch
.
Georgia Power Company
P. O _ Box-1295
'
-Birmingham, AL 35201,
Ernest L. Blake, Esquire
Shaw, Pittman,-Potts'and
Trowbridge-
.2300 N Street, NW
'
Washington, D.,C.
20037
Charl's H.* Badger.
.
e
Office:of.;P1anning and Budget
Room 610
.
270 Washington Street',--SW:-
. Atlanta, GA' 30334
1
-Lonice Barrett, Commissioner.
- (
.-Department-of Natural Resources _.
205 Butler. Street, SE,. Suite 1252
Atlanta, GA 130334-
,
iThomas Hill', Manager-
'
Radioactive-Materials Program
" Department of' Natural Resources
'
-
878-Peachtree'St., NE.,; Room 600
Atlanta,.GA 30309L
3
(cc w/enci cont'd_ 'see page 3)
'
.
er
- .
- -~-
a
----- -
'
.
l
.
.
a
Georgia Power Company
3
g
cc w/ enc 1:
(Continued)
Chairman
Appling County Commissioners
County Courthouse
Baxley, GA 31513
Brent L. Collins, Engineering Specialist
'
Idaho National Engineering Laboratory
EG&G Idaho, Inc.
8350-F Terminal Road
P.O. Box 578
Newington, VA 22122-8150
State of Georgia
bec w/ encl:
V. Thomas, NRR
K. Jabbour, NRR
A. R. Herdt, RII
K. E Brockman, RII
S. Sparks, RII
Document Control Desk
DRP Section Chief
NRC Resident Inspector
U.S._ Nuclear Regulatory Commission
Route 1, Box-725
Baxley, GA 31513
Hugh S. Jordan Executive Secretary
Georgia Public Service Commission
244 Washington Street, SW
Atlanta, GA 30334-
RII': RP
IN -
RII DRP
LTrocine-
BLCollins
KBrockman
10/A/90
10/
0-
10/ M 90
(P
u*N
J