POWER DISTRX80Tf0N LXMITS.
3/4.2.4 DN8R MARGIN LIMITING CONDITION FOR OPERATION 3.2.4 The ONBR margin shall be maintained by one of the following methods:
a.
Maintaining COLSS calculated core power less than or equal to COLSS --
calculated core power operating limit based on DNBR (when COLSS.is in service, and either one or both CEACs are operable); or b.
Maintaining COLS$ calculated core power less than or equal ts COLSS-calculated core power operating iteit based on DNSR decreased by 13% RATED-THERMAL POWER (when COLS$ is in service and neither CEAC is operable); or c.
Operating within the region of acceptable operation of Figure 3.2-2 using any operable CPC channel (when COLS$ is out of service' and either one or both CEACs are operable); or d.
Operating within the region of acceptable operation of Figure 3.2-3 using any operable CPC channel (when COLS$ is out of service' and neither CEAC is operable).
APPLICA8ILITY: MODE I atieve 205 of RATED THERMAL POWER.
ACTION:
a.
With the DER limit not being maintained as indicated by COLSS calculated core power exceeding the COL 55 calculated core power operating limit based on DNBA, within 15 minutes initiate corrective action to reduce.the DNBR to within the limits and either:
1.
Restore the DE R to within its limits within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, or-2.-
Reduce THEMI4L PO W R te less than er equal to 2 5 of RATED THERMAL POWER within the next 5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />.-
b.
With the DER limit not being maintained as indicated by operation outside the~ region of acceptable operation.in Figure 3.2-2 or 3.2-3 with COLS5 out of service, either:
1.
Restore COLS$ to ser'vice within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, or 2.
Restore the DMR te within its limits within the next 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />,.or 3.
Reduce TMSML POWER te less than or equal to 205 of RATED THERMAL-
' POWER within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
9312010083 931116 1
PDR. ADOCK 05000382 P
PDN WATERFORO'- UNIT'3 3/4 2-6 AMENDMENT NO. 'Z2, 32' e
s
,,-4
lCOLSS OUT OF SERVICE DNBR LIMIT LINE 12.5 ACCEPTABLE 12.4
< OPERATION E
12.3 -
=a g
iMINIMUM 1 CEAC OPERABLE l(0.0,2.20s 12.2 4.22, 2.20) 12.1
- UNACCEPTABLE 3
ONRAN i(.17,2.0M 12.0 l1,3-a e
a a
a 4.3 14.2 W.1 p.0 0.1 10.2-
!0.3 ICORE AVERAGE ASI l.
FIGuitE 3.2-2 05R MARGIN OPERATING LINIT BASED 011 CORE PROTECTI0fl CALCULATORS (COL 55 0UT OF SERVICE, CEACs GPERABLE)-
WATERF0 5 - UNIT 3 3/4 2-8 AleOSIT NO. 12
, j 3
.mA m e.
_m..
- _=a-.,_m...
r u.
_sa..w a
s.
4 4..
'4
- .i 9
b f
. t 3
h r
i I
NPF-38-144 1
h ATTACHMENT B
+
T f
'T e
?
i t
A i
s
)
i E
+
)
T 6
1 J
'.I 7
i h
I s
b I
i l
+
> N
-~a h
POWER DISTRIBUTION LIMITS 3/4.2.4 DNBR MARGIN i
LIMITING CONDITION FOR OPERATION I
3.2.4 The DNBR margin shall be maintained by one of the following methods:
a.
Maintaining COLSS calculated core power less than or equal to COLSS calculated core power operating limit based on DNBR (when COLSS is in service-.
and either one or both CEACs are operable); or 3
b.
Maintaining COLSS calculated core power less than or equal to COLSS calculated core power. operating limit based on DNBR decreased by 16% RATED
-l I
THERMAL POWER (when COLSS is in service and neither CEAC is operable): or-t c.
Operating within the region of acceptable operation of Figure 3.2 2 using any operable CPC channel (when COLSS is out of service and either one or both CEACs are operable): or d.
Operating within the region of acceptable operation of Figure 3.2-3 using any operable CPC channel (when COLSS is out of service and neither CEAC is -
operable).
APPLICABILITY: MODE 1 above 20% of RATED THERMAL POWER.
ACTION:
i a.
With the DNBR limit not being maintained as indicated by COLSS calculated core 5
power exceeding the COLSS calculated core power operating limit based on DNBR. within
-l 15 minutes initiate corrective action to reduce the DNBR to within the limits and
~
either:
- 1.
Restore the ONBR to within its limits within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> or 2.
Reduce THERMAL POWER to less than or equal to 20% or RATED THERMAL POWER within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, b.
With the DNBR limit not being maintained as indicated by operation outside' the-region of acceptable operation in Figure'3.2-2 or 3.2-3 with COLSS out of service.
either:
1.
Restore COLSS to service within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, or
'i j
2.
Restore the DNBR to within its limits within the next 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />. or, 3.
Reduce THERMAL POWER to less than or equal to 20% of RATED THERMAL POWER q
within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
i WATERFORD - UNIT 3 3/4 2-3 AMENDMENT NO. 32 f
r I
~.
t 1
+
COLSS~OUT OF SERVICE DNBR LIMIT LINE l
2.5 ACCEPTABLE OPERATION 2.4 (0.0,2.40)
(.22,2.40)
C
[
P 2.3 l
C MINIMUM 1 CEAC OPERABLE-M I
N 2.2 I
i M
U l
M UNACCEPTABLE l
OPERATION 2.1 D
i N
(.
7,2.07)
B l
R 2.0 l
1.9
-0.3
-0.2
-0.1 0.0 0.1 0.2 0.3 t
t CORE AVERAGE ASI l
FIGURE 3.2-2 i
-f r
DNBR MARGIN OPERATING LIMIT BASED ON' CORE PROTECTION CALCULATORS (COLSS OUT OF SERVICE, CEACs OPERABLE p
.I 1
.