ML20058A203
| ML20058A203 | |
| Person / Time | |
|---|---|
| Site: | Midland |
| Issue date: | 10/10/1978 |
| From: | Heishman R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Howell S CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| Shared Package | |
| ML20058A208 | List: |
| References | |
| NUDOCS 7811140048 | |
| Download: ML20058A203 (2) | |
See also: IR 05000329/1978010
Text
_______
D 2-
.
1.
T
- ""l4
UNITED STATES
' W j, tj
NUCLEAR REGULATORY COMMISSION
.
[4
.
REGloN ill
,
.
g
799 aoostvsLT noAo
8
GLEN E LLYN. ILLINolS 60137
w
.....
~00T 191973'
Docket N . 50-329
Dockr
.,o. 50-330
Consumers Power Company
ATTN:
Mr. Stephen H. Howell
.
Vice President
1945 West Parcall Road
Jackson, MI 49201
g.
~
(
Gentlemen:
-
This refers to the inspection conducted by Mr. I. T. Yin of this office
i,
on September 13-15, 1978, of activities at the Midland Nuclear Plant,
,
_
Units 1 and 2, authorized by NRC Construction Permits No. CPPR-81 and
No. CPPR-82 and to the discussion of our findings with Mr. J. L. Corley
-
'
and others of your staff at the conclusion of the inspection.
.
b
The enclosed copy of our inspection report identifies areas examined
'
during the inspection. Within these areas, the inspection consisted
of a selective examination of procedures and representative records,
'
observations, and interviews with personnel.
No items of noncompliance with NRC requirements were identified during
the course of this inspection.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part
I:
2 Title 10, Code of Federal Regulations, a copy of this letter and the
enclosed inspection report will be placed in the NRC's Public Document
Room, except as follows. If this report contains information that you
or your contractors believe to be proprietary, you must apply in writing
to this office, within twenty days of your receipt of this letter, to
withhold such information from public disclosure. The application must
include a full statement of the reasons for which the information is
considered proprietary, and should be prepared so that proprietary
,,
information f.dentified in the application is contained in an enclosure
1
'
to the application.
78111 400y{ Q
- ___
_
..
l
.
.
Consumers Power Company
-2-
OCT 10197T
i
We will gladly discuss any questions you have concerning this
inspection.
I
Sincerely,
X2Mr"(_m
/
R. F. Heishman, Chief
p ' Reactor Construction and
Engineering Support Branch
Enclosure: IE Inspection
Reports No. 50-329/78-10
and 50-330/78-10
.
cc w/ encl:
,
Central Files
Re, production Unit NRC 20b
s4DR
Local PDR
Ronald Callen, Michigan Public
Service Commission
Dr. Wayne E. North
Myron M. Cherry, Chicago
(
.