Clarifies Administrative Control of Seal Injection Flow Rates Once Requirement Removed from Tss,Per 931110 Application for Amends to Licenses NPF-4 & NPF-7
ML20058A060
Person / Time
Site: North Anna  
Issue date: 11/16/1993
From: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
93-732A, NUDOCS 9311300070
Download: ML20058A060 (2)


Text

i U

i VHOINIA EU:CTHIC AND POWiiH COMPANY Riennoxn,Vinoix1r 2026:

November 16, 1993 U.S. Nuclear Regulatory Commission Serial No.

93-732A Attention: Document Control Desk NL&P/JDH R2 Washington, D.C. 20555 Docket Nos.

50-338 50-339 License Nos. NPF-4 NPF-7 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNITS 1 & 2 PROPOSED TECHNICAL SPECIFICATIONS CHANGE HIGH HEAD SAFETY INJECTION FLOW BALANCING -- CLARIFICATION On November 10,1993, a proposed North Anna Technical Specification change was submitted to NRC on an emergency basis. The proposed change eliminated the simulated reactor coolant pump seal injection flow requirement in Technical Specification 4.5.2.h.1.c for the flow balancing of the high head safety injection (HHSI) lines. On November 15,1993, discussions with the NRC reviewer evaluating the proposed change were held. Based on those discussions, the following clarification is provided regarding administrative control of seal injection flow rates once the requirement is removed from the Technical Specifications.

First, appropriate seal injection flow rates will continue to be considered in the periodic surveillance tests that establish the minimum and maximum HHSl flow rates specified in Technical Specification 4.5.2.h.1.a. and b. Second, the seal injection flow rates during normal operation are consistent with the seal injection flow rates assumed during design basis accident conditions.

This clarification has been approved by the Station Nuclear Safety and Operating Committee.

If you have any further questions, please contact us.

Very truly yours,

/? Las e

W. L. Stewart Senior Vice President - Nuclear o

93J1300070 931116 PDR ADOCK 0500o338 P

PDR.~. _

cc:

U.S. Nuclear Regulatory Commission Region ll 101 Marietta Street, N.W.

Suite 2900 Atlanta, Georgia 30323 Mr. R. D. McWhorter NRC Senior Resident inspector North Anna Power Station Commissioner Department of Health Room 400 109 Governor Street Richmond, Virginia 23219 L