ML20057G113

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-482/93-26 on 930920-24 & Notice of Violation
ML20057G113
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 10/14/1993
From: Chamberlain D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Carns N
WOLF CREEK NUCLEAR OPERATING CORP.
Shared Package
ML20057G114 List:
References
NUDOCS 9310200193
Download: ML20057G113 (5)


See also: IR 05000482/1993026

Text

pR MGo

UNITED STATES

[j

k

NUCLEAR REGULATORY COMMISSION

'

f(

(

REGloN IV

!

$

8

611 RYAN PL AZA DRIVE, SUITE 400

8

AR LINGTON, TEX AS 76011-8064

g

l

ocT 141993

-

l

l

Docket:

STN 50-492

l

License:

NPF-42

l

Wolf Creek Nuclear Operating Corporation

-

ATTN:

Neil S. Carns, President and

Chief Executive Officer

l

'

P.O. Box 411

Burlington, Kansas 66839

SUBJECT:

NRC INSPECTION REPORT 50-482/93-26 (NOTICE OF VIOLATION)

!

This refers to the routine safety inspection conducted by

Dr. D. Blair Spitzberg and Mr. Jf n Pellet during the period September 20-24,

1993.

The inspection included a eview of activities authorized for your Wolf

Creek Generating Station. At the conclusion of the inspection, the findings

were discussed with you and those members of your staff identified in the

enclosed report.

Areas examined during the inspection are identified in the report and include

a review of the operational status of the Emergency Preparedness Program and a

regional inspection initiative in the area of knowledge and performance of

duties. Within these areas, the inspection consisted of selective examination

of procedures and representative records, interviews with personnel, and

observations by the inspectors. The inspection findings are documented in the

enclosed inspection report.

Based on the results of this inspection, certain licensed activities appeared

to be in violation of NRC requirements, as specified in the enclosed Notice of

Violation (Notice). The violation involved your failure to correct an

emergency preparedness weakness identified by the NRC during the previous

inspection of this functional area conduc.ted in July 1992. The weakness

related to the capabilities of your operating :rews to accurately and promptly

classify emergency conditions during emergency scenario walkthroughs.

In addition to the violation discussed above, a weakness is identified in

Section 6.1 of the enclosed inspection report for failure to follow procedures

in making notifications to the NRC Operations Center.

Weaknesses, according

to 10 CFR Part 50, Appendix E.IV.F.5, are inspeuion findings that need to be

corrected by the licensee.

You are required to respond to this letter and should follow the instructions

specified in the enclosed Notice when preparing your response to the violation

and the two weaknesses.

In your response, you should document the specific

actions taken and any additional actions you plan to prevent recurrence.

After reviewing your response, including your proposed corrective actions and

the results of future inspections, the NRC will determine whether further NRC

f

~h

9310200193 931o14

PDR

ADOCK 05000482

G

PDR

__

.

.

Wolf Creek Nuclear

-2-

Generating Corporation

j

enforcement action is necessary to ensure compliance with NRC regulatory

requirements.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of

this letter and its enclosures will be placed in the NRC Public Document Room.

Should you have any questions concerning this inspection, we will be pleased

'

to discuss them with you.

'

i

Sincerely,

'

Q

'

-

,

V,

Dwight D. Chamberlain, Acting Director

Division of Radiation Safety and

Safeguards

Enclosures:

,

1.

Appendix A - Notice of Violation

2.

Appendix B - NRC Inspection Report

50-482/93-26

cc w/ Enclosures:

Wolf Creek Nuclear Operating Corp.

ATTN: Otto Maynard, Vice President

Plant Operations

P.O. Box 411

Burlington, Kansas 66839

Shaw, Pittman, Potts & Trowbridge

ATTN:

Jay Silberg, Esq.

2300 N Street, NW

Washington, D.C.

20037

Public Service Commission

ATTN:

C. John Renken

Policy & federal Department

P.O. Box 360

Jefferson City, Missouri 65102

U.S. Nuclear Regulatory Commission

ATTN:

Regional Administrator, Region III

799 Roosevelt Road

Glen Ellyn, Illinois 60137

<

l

1

I

t

"

.

l

.

Wolf Creek Nuclear

-3-

Generating Corporation

Wolf Creek Nuclear Operating Corp.

,

'

ATTN: Kevin J. Moles

Manager Regulatory Services

P.O. Box 411

Burlington, Kansas 66839

Kansas Corporation Commission

ATTN:

Robert Elliot, Chief Engineer

'

Utilities Division

1500 SW Arrowhead Rd.

Topeka, Kansas 66604-4027

Office of the Governor

State of Kansas

Topeka, Kansas 66612

Attorney General

1st Floor - The Statehouse

Topeka, Kansas 66612

Chairman, Coffey County Commission

Coffey County Courthouse

Burlington, Kansas 66839-1798

Kansas Department of Pealth

and Eniironment

Bureau o' Air Q'tality & Radiation

Control

ATTN:

Gerald Allen, Public

Health Physicist

Division of Environment

Forbes Field Building 321

Topeka, Kansas 66620

Program Manager

FEMA Region 7

911 Walnut Street, Room 200

,

Kansas City, Missouri

64106

l

,

-. .

. .

. .

...

. . _ _ _ _ _ _ _ ,

_

_ .

.

Wolf Creek Nuclear

-4-

Operating Corporation

bcc to DMB (IE35)

!

!

bcc distrib. by RIV:

l

J. L. Milhoan

l

Section Chief (DRP/A)

Section Chief (RIII, DRP/3C)

SRI, Callaway, RIII

Lisa Shea, RM/ALF, MS: MNBB 4503

Section Chief (DRP/TSS)

Resident Inspector

DRSS-FIPS

RIV File

MIS Systerm

Project Engineer (DRP/A)

C. A. Hackney, SLO

l

RIV:FIPS W

C:0S W Iv

C:FIPS\\ifA-

AD:DRSS E

D:DRP D

'

DBSpitzberg

JPellet

BMurray

DDChamberlain

ABBeach h

to / &/93

10 / t /93

/0/&/93

(0/&/93

/b/[/93 h

. - - -

.-

.

'

,-

Wolf Creek Nuclear

-4-

Operating Corporation

bcc to DMB (IE35)

I

bcc distrib. by RIV:

J. L. Milhoan

Section Chief (DRP/A)

Section Chief (RIII, DRP/3C)

SRI, Callaway, RIII

Lisa Shea, RM/ALF, MS: MNBB 4503

.

Section Chief (DRP/TSS)

Resident Inspector

DRSS-FIPS

RIV File

MIS Systerm

Project Engineer (DRP/A)

C. A. Hackney, SLO

l

D

RIV:FIPS W

C:0S W Iv

C:FIPSO 4

AD:DRSS E

D:DRP

'

DBSpitzberg

JPellet

BMurray

DDChamberlain

ABBeach h

10/ &/93

10 /t/93

to/ A /93

(0/&/93

/b/ [/93 h

1900??

ei .