ocuglas R. Gipson f,eneur Vu.c Presdent NJ<,! ear Generanon
. Detroit
- r..nu exao worin 0;ne syn ay
. Ec ison
~(313)56f@49
.~~
4 Oct obe r 13, 1993 NRC-93-0127 U. S. Nuclear Regulatory Commission Attn: Document Control Deck' Washington, D. C.
20555
References:
- 1) Fermi 2 NRC Docket No. 50-341 NRC License No. NPF-43
- 2) NRC Generic Letter 89-10 Phase II Inspection Report No. 50-341/93003, dated March 30, 1993
Subject:
Detroit Edison Initiatives on Pressure Locking and Thermal Binding of Gate Valves at Fermi 2 The purpose of this letter is to provide details and schedules for Detroit Edison's on going initiatives regarding pressure locking and thermal binding of gate valves at Fermi 2 in response to an NRC requect made during a meeting with Detroit Edison on September-13, 1993. This information is also related to an Unresolved Item on this subject discussed in Section 2.3.5 of the Phase II MOV Inspection Report (heference 2).
The initiatives discussed at the September 13, 1993 meeting and scheduled completion dates are as follows:
o INITIATIVE 1:
Resolve prescure locking issue on the 6 valves in Design Calculation 5132.
SCHEDULED COMPLETION: End of RF04 (May 1994) g{p
- n,,
9310200128 931013 h
- PDR ADOCK 05000341 W
31g G
PDR W
L
i::
'i V
P
- v y
I C
USNRC Oct obe r.13, 1993
~
NRC-93-0127-I I'
Pagef2-I o
- INITIATIVE 2:
.i Re-evaluate the potential for pressure locking and thermal binding of safety-related gate valves under the. scope of Generic j
Letter 89-10 at Fermi 2 using the existing analysis.,The review will include:
Review of the following existing documents:-
'l.
o
- GL 89-10, Supplement 6 (Proposed)
'I
- NUREG-1275, -Volume 9, March.7,1993 containing' AECD Report -
j S92-07.
si o
Confirm the assumptions in the evaluation methodology.
4 Confirm the scope of valves subject to pressure locking and
~!
SCHEDULED COMPLETION: October 1994 o
INITIATIVE 3:
"',s As part of the work scope _ in Initiative 2 above, utilize the EPRI Performance Prediction Program document.
This document is. scheduled to be -issued by EPRI in February of 1
1994. Effective use of this document is regarded to be important to a technically sound conclusion and a timely effort ias f
identified in Initiative 2.
l i
i SCHEDULED _ COMPLETION:
September 1994 o
INITIATIVE 4:
Procedures or work instructions will be-revised to assure the
_l proper consideration of pressure : locking and thermal ~ binding effects ~is given to the ' design and operation of af fectedivalves.
]
't i
SCHEDULED COMPLETION:. End of' RF05 (November 1995).
i 1
l
a V
- .., + ;
o'?"
,USNRCE
= October 13.11993 NRC-93-0127 Page 3-o
' INITIATIVE 5:
Based upon the final evaluation of each valve ' set / group..
modifications will be initiated, as required.,
SCHEDULED COMPLETION: End of RF05 '(November 1995)-
Detroit Edison continues to participate in industry groups on this subject. Based on input from these industry groups and the reviews described above, changes needed in certain-details of our initiative 4 will be made, as appropriate.
~
i If you have any questions, please contact Mr. Girija S. Shukla at (313) 586-4270.
Sincerely, pw V
-?