.g af cg
UNITED STATES
'
A
4,
)
f,
3
NUCLEAR REGULATORY COMMISSION
)
,
[ i ;;' ) E
REGION IV
'
-
'i Q2lg [!
l
611 R Y AN PL AZA DRIVE. SUIT E 400
AR LINGTON, T E X AS 16011-8064
\\ . .w. . . '
. I4 M
l
Dockets:
50-313
50-368
Licenses: DPR-51
NPF-6
j
-
Entergy Operations, Inc.
ATTN:
J. W. Yelverton, Vice President
Operations, Arkansas Nuclear One
Route 3, Box 137G
Russellville, Arkansas 72801
SUBJECT:
NRC INSPECTION REPORT 50-313/93-27; 50-368/93-27
l
This refers to the inspection conducted by Mr. C. J. Paulk and
Ms. P. A. Goldberg of this office on September 13-17, 1993. The inspection
included a review of activities authorized for your Arkansas Nuclear One,
Units 1 and 2, facility.
At the conclusion of the inspection, the findings
were discussed with you and those members of your staff identified in the
enclosed report. Also, telephone conversations were conducted on September 22
and 24, 1993, between Messrs. T. F. Westerman and R. J. King to discuss
additional informr. ion related to the inspection.
Areas examined during the inspection are identified in the raport. Within
l
these areas, the inspection consisted of selective examinat % of procedures
!
and representative records, interviews with personnel, and observation of
activities in progress. The purpose of the inspection was to determine
whether activities authorized by the license were conducted safely and in
l
accordance with NRC requirements.
It was identified that the licensee had failed to have information to properly
identify the subcomponents of the safety-related service water strainer for
Emergency Chiller CV-6036. This resulted in procurement and installation of
an improper mesh insert.
This was in violation of Criterion VIII of
Appendix B to 10 CFR, Part 50.
This violation is not being cited because the
criteria in paragraph VII.B.1 or' Appendix C to 10 CFR Part 2 of the NRC's
" Rules of Practice" were satis /ied.
'
In accordance with 10 CFR 2.730 of the NRC's " Rules of Practice," a copy of
this letter and its enclosures will be placed in the NRC Public Document Room.
I
l
931D200004 931014
ADOCK 05000313
G
_.
-
.
.
...
Entergy Operations, Inc.
-2-
l
Should you tiave any questions concerning this inspection, we will be pleased
to discuss them with you.
Sincerely,
.
1
.i o ins , Director
i
Division cf Reactor Safety
Enclosure:
Appendix - NRC Inspection Report
50-313/93-27; 50-368/93-27
j
cc w/ enclosures:
Entergy Operations, Inc.
ATTN: Harry W. Keiser, Executive
Vice President & Chief Operating Officer
P.O. Box 31995
Jackson, Mississippi
39286-1995
Entergy Operations, Inc.
,
'
ATTN: John R. McGaha, Vice President
Operations Support
P.O. Box 31995
Jackson, Mississippi
39286
Wise, Carter, Child & Caraway
ATTN: Robert B. McGehee, Esq.
P.O. Box 651
Jackson, Mississippi
39205
Entergy Operations, Inc.
ATTN: James J. Fisicaro
Director, Licensing
Route 3, Box 137G
Russellville, Arkansas 72801
I
Entergy Operations, Inc.
ATTN: Michael B. Sellman, General
Manager, Plant Operations
Route 3, Box 137G
Russellville, Arkansas 72801
-
- - -
-
-
_.
--
.
-_.
.
_
___.
,
-
l
j.
,
Entergy Operations, Inc.
-3-
i
Honorable C. Doug Luningham
County Judge of Pope County
Pope County Courthouse
i
Russellville, Arkansas 72801
Winston & Strawn
'
ATTN: Nicholas S. Reynolds, Esq.
1400 L Street, N.W.
Washington, D.C.
20005-3502
ATTN: Ms. Greta Dicus, Director
Division of Radiation Control and
Emergency Management
4815 West Markham Street
Little Rock, Arkansas 72201-3867
B&W Nuclear Technologies
ATTN:
Robert B. Borsum
Licensing Representative
1700 Rockville Pike, Suite 525
Rockville, Maryland 20852
Admiral Kinnaird R. McKee, USN (Ret)
214 South Morris Street
Oxford, Maryland 21654
J
ABB Combustion Engineering
Nuclear Power
ATTN: Charles B. Brinkman
Manager, Washington
~
Nuclear Operations
12300 Twinbrook Parkway, Suite 330
Rockville, Maryland 20852
,
- - - -
-
- - - - .
__
.
..
.
.
.
.,.
,
Entergy Operations, Inc.
-4-
bcc to DMB (IE01)
bcc distrib. by RIV:
J. L. Milhoan
Resident Inspector
Section Chief (DRP/D)
Lisa Shea, RM/ALF, MS: MNBB 4503
MIS System
DRSS-FIPS
-
RIV File
Section Chief (DRP\\lSS)
Project Engineer (DRP/D)
Section Chief (DRS/ES)
C. Paulk
P. Goldberg
T. F. Westerman
AD:DRPM/
RIV:RI:ES
RIV:RI:ES
C:ES
ADD:DRS
_,p
'
CJPaulk O- V
PAGoldbergh
TFWestermanhIBarnes
TPGwynn
1/so / n
9/w/'5
1/sc /43
/s/<z/w
to //g/9:7
4
,
D:DRSn
SJCM M
R&iV
l
1900 %
l
llt
1
1
.
..
.
Entergy Operations, Inc.
-4-
bcc to DMB (IE01)
bcc distrib. by RIV:
J. L. Milhoan
Resident Inspector
Section Chief (DRP/D)
Lisa Shea, RM/ALF, MS: MNBB 4503
i
,
MIS System
DRSS-FIPS
RIV File
Section Chief (DRP\\TSS)
Project Engineer (DRP/D)
Section Chief (DRS/ES)
C. Paulk
P. Goldberg
i
T. F. Westerman
!
1
,
AD:DRPM
RIV:RI:ES
RIV:RI:ES
C:ES
ADD:DRS
,o
CJPaulk O-V
PAGoldbergh
TFWestermanhIBarnes
TPGwynn
9 /10 / 9 3
') / 30/ 93
9 /3c /3.3
/4/<A/W
e /g/rfg
D:DRS n
SJdlM
kd/V
-
-
.
. .
-
-
-.