Forwards Requalifcation Exam Rept 50-245/93-25-OL Administered During Wk of 930913.All Fifteen Licensed Operators Passed Requalification Exam & All Three Crews Passed in Simulator
ML20057F435
Person / Time
Site: Millstone Dominion icon.png
Issue date: 10/07/1993
From: Bettenhausen L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Opeka J
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20057F436 List:
References
RTR-NUREG-1021 NUDOCS 9310180002
Download: ML20057F435 (3)


See also: IR 05000245/1993025

Text

_ . . _ _

77(

\\3

/

Docket No. 50-245

0CT

7 1993

,

Mr. John F. Opeka

Executive Vice President - Nuclear

Northeast Nuclear Energy Company

P. O. Box 270

Hartford, Connecticut 06141-0270

,

Dear Mr. Opeka:

,

SUBJECT:

REQUALIFICATION EXAMINATIONS AND REQUALIFICNTION

PROGRAM EVALUATION REPORT 50-245/93-25 (OL)

During the week of September 13, 1993, the NRC staff conducted licensed operator

requalification examinations and completed a program evaluation at the Millstone Unit 1

Nuclear Power Station. The requalification examinations and program evaluation were

,

conducted using Revision 7 of NUREG-1021, " Operator Licensing Examiner Standards."

i

The licensed operator requalification training (LORT) program is important to nuclear safety

because it helps to assure a high level of operator proficiency in dealing with normal and

emergency events.

,

On September 17, 1993, the preliminary findings related to the preparation and

administration of the examinations were discussed with those members of your staff

identified in the enclosed report.

All fifteen licensed operators passed the requalification examination and all three crews

passed in the simulator. The results of the examinations were satisfactory and in accordance

l

with Examiner Standard 601 criteria. However, because the program was unsatisfactory in

'

1991 and 1992, the corrective actions for significant program weaknesses that were identified

previously must be completed and determined to be satisfactory by the NRC staff before a

determination of the program status can be made.

The written examination, dynamic simulator scenarios, and job performance measures that

were proposed for the examination required no significant revisions.

Attachment 4 of this letter documents the meeting we had on August 4,1993, in the Region

1 office. The meeting was of mutual benefit.

i

OFFICIAL RECORD COPY

G: MIL 9325.RER

9310180002 931007

PDR

ADOCK 05000245

i

V

PDR

h

t(s

..

.

--

-

-

.

..~

.

- - - . ~ .

_

i

OCT

7 1933'

I

^

.

Mr. John F. Opeka

2

We received your two letters dated August 6,1993 requesting changes in crew composition.

.

One request was to substitute an operator to reflect current shift configuration. The other

request dealt with using the shift supervisor staff assistant (SSSA) as part of the normal crew

i

for examination purposes. Both requests were granted.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and

the enclosures will be placed in the NRC Public Document Room.

Should you have any questions, please contact Mr. R. Conte, Chief, BWR Section, at (215)

,

337-5210.

-

Sincerely,

j7h

. O

,

Lee H. Bettenhausen, Chief

Operations Branch

Division of Reactor Safety

i

Enclosure:

Examination Report No. 50-245/93-25

w/ Attachments 1, 2, 3, and 4

l

'

Attachments:

l. Persons Contacted

2. Simulator Fidelity Report

3. Licensee letter of September 27,1993

4. August 4,1993, Meeting Handout

,

cc w/ encl; w/o Attachments 1,2,3, and 4:

'

W. D. Romberg, Vice President - Nuclear, Operations Services

J. P. Stetz, Vice President, Haddam reck Plant

H. F. Haynes, Nuclear Unit Director

R. M. Kacich, Director, Nuclear Licensing

>

J. Solymossy, Director, Nuclear Quality and Assessment Services

Gerald Garfield, Esquire

Nicholas Reynolds, Esquire

!

NRC Resident Inspector

State of Connecticut, SLO

,

i

OFFICIAL RECORD COPY

G: MIL 9325.RER

,

_ _ _ - _ _ _ _ _ _ . ..

.

OCT

's 1993

[

Mr. John F. Opeka

3

cc w/ enc! and Attachments 1,2,3, and 4:

S. E. Scace, Vice President, Millstone Station

R. Heidecker, Assistant Supervisor - Operator Training

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

bec w/ encl; w/o Attachments 1,2,3, and 4:

H. Williams, Chief Examiner, DRS

John Hanek, INEL

Mark Parrish, INEL

OL Facility File

bec w/ encl; w/ Attachments 1,2,3, and 4:

Master Exam File

bec with concurrences and w/ encl; w/o Attachments 1,2,3, and 4:

Region I Docket Room

bec w/ encl; w/o Attachments 1,2,3, and 4 (VIA E-MAIL):

J. Stolz, NRR/PDI-4

V. McCree, OEDO

D. Jaffe, PM, NRR

J. Andersen, NRR

R. Gallo, Chief, OLB, NRR

NOTIFY VIA F MAIL AND NO ATTACIIED FILE

L. Bettenhausen, DRS

R. Conte, DRS

H. Williams, DRS

Carl E. Sisco, DRS

.RI:DRS ./

RI:DRS

RI:DRS

'

William dmg

C

Bettenhause

10/01/93

10/01/93

10/b/93

OFFICIAL RECORD COPY

G: MIL 9325.RER

_

' '

--

___-__m