Forwards LAR 93-11 Requesting Changes to TS Correcting Inconsistency within TS by Deleting Requirement to Verify EDG Speed
ML20057F293
Person / Time
Site: Seabrook 
Issue date: 10/04/1993
From: Feigenbaum T
NORTH ATLANTIC ENERGY SERVICE CORP. (NAESCO)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20057F294 List:
References
NYN-93135, TAC-M87706, NUDOCS 9310150099
Download: ML20057F293 (2)


Text

- _ _ _ _ _ _ -

.o..

t.

eab ok NH 03874 '

Telephone (603)47469521

=

(-

Facsimile (603)474-2987 i

Energy Service Corporation

.Ted C. Feigenbaum Senior Vice President and Chief Nuclear Officer i

L NYN-93135 October 4,.1993

~

l-United States Nuclear Regulatory Commission

' Washington, D.C.- 20555 i

Attention:

Document Control Desk -

?

Reference:

~ (a)

Facility Operating License No. NPF-86, Docket No. 50-443 (b).

NRC Letter SEA-93-025, " Inconsistent Technical SpeciHcation Surveillance

-l

(

. Requirement,- Electrical Power Systems,' A.C. Sources", dated September 23, L

1993; A.W. De Agazio.to T.C. Feingenbaum -

l

Subject:

License Amendment Request. 93-11: Emergency Diesel Generator Surveillance Requirements (TAC No. M87706)

Gentlemen:

4 I

North Atlantic Energy Service Corporation (North Atlantic) encloses herein License Amendment L

Request 93-11. This License Amendment Request is submitted pursuant to the. requirements of 10CFR50.90 and to 10CFR50.4.

The purpose of License Amendment Request 93-11 is to propose changes to the Seabrook Station i

Technical. Specifications. Currently the Technical Specifications require verification of both Emergency

1 Diesel Generator speed and frequency. The proposed changes will correct an inconsistency within the i

. Technical Specifications by deleting the requirement to verify Emergency Diesel Generator speed.; The requirement to verify generator frequency remains unchanged. North Atlantic discussed the inconsistency -

and proposed License Amendment Request with representatives of the NRC on September 7 and 8,1993.

License' Amendment Request 93-11 has been reviewed and approved by the Station Operation Revie,. Committee and the Nuclear Safety Audit Review Committee; L

As discussed in the enclosed License Amendment Request,Section V, the proposed changes do i

not involve a significant hazards consideration pursuant to 10CFR50.92. A copy of this letter and the i

i

. enclosed License Amendment Request have been forwarded to the State of New Ilampshire State Liaison Officer pursuant.to 10CFR50.91(b).

In additioni North LAtlantic has determined that License l

Amendment Request 93-11 meets the criteria of 10CFR51.22(c)(a) for a categorical exclusion from the s requirements' for an Environmental Impact Statement (see Section VII enclosed).

t I

130055 i

l

'9310150099 931004:

ky ' member of the Northeast Utilities system DR ADOCK O 4j3-

United 5tates Nuclear Regulatory Commission October 4,1993 Attention:

Document Control Desk Page two North Atlantic requests NRC review of License Amendment Request 93-11 and issuance of a license amendment by December 15,1993 (see Section VI enclosed).

Should you have any questions regarding this letter, please contact Mr. Terry L. Harpster, Director of Licensing Services, at (603) 474-9521, extension 2765.

Very truly yours, Ted C. Feigen um Enclosure TCF:MDO/ tad cc:

Mr. Thomas T. Martin Regional Administrator United States Nuclear Regulatory Commission

)

Region 1 475 Allendale Road King of Prussia, PA 19406 Mr. Albert.W. De Agazio, Sr. Project Manager Project Directorate I-4 Division of Reactor Projects

.)

U.S. Nuclear Regulatory Commission j

Washington, DC 20555.

Mr. Noel Dudley j

NRC Senior Resident Inspector P.O. Box 1149 -

Seabrook, NH 03874 Mr. George L. Iverson, Director New Hampshire Omce of Emergency Management 107 Pleasant Street Concord, NH 03301

-