ML20057E836

From kanterella
Jump to navigation Jump to search
Forwards Inspector follow-up Items 93-201-03,93-201-04 & 93-201-04 from Insp Rept 70-1257/93-201 for Appropriate Actions
ML20057E836
Person / Time
Site: Framatome ANP Richland
Issue date: 09/24/1993
From: Casey Smith
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Pierson R
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
Shared Package
ML20057E822 List:
References
NUDOCS 9310130218
Download: ML20057E836 (1)


Text

__

i)

September 24, 1993

~

MEMORANDUM FOR:

Robert C. Pierson, Chief Licensing Branch Division of Fuel Cycle Safety i

and Safeguards, NMSS FROM:

C. N. (Mike) Smith, Chief Operations Branch Division of Fuel Cycle Safety i

and Safeguards, NMSS f

SUBJECT:

MATERIAL CONTROL AND ACCOUNTING LICENSING CONCERNS AT SIEMENS l

POWER CORPORATION During a recent material control and accounting (MC&A) inspection at the subject facility, several inconsistencies within the licensee's MC&A program were noted.

The Nuclear Regulatory Commission's concern over these issues was conveyed to the licensee in Inspection Report #93-201.

However, because changes to the Fundamental Nuclear Material Control Plan would be involved, these issues (Inspector Follow-up Items Nos. 93-201-03, 93-201-04, and 92-201-02) are provided to you for appropriate action.

The enclosed Inspection Report, which contains 10 CFR 2.790 Information, provides specific details on these issues.

If you have any questions, please contact Christopher Light at 504-2480.

l 0%!m! S%ne:! By C.N.(Mike) Smith C. N. (Mike) Smith, Chief Operations Branch Division of Fuel Cycle Safety and Safeguards, HMSS

Enclosure:

As stated l

9310130218 931008 E

PDR ADOCK 07001257 C

pgg

_ _ _ _ _ _ _ _ _ - _ _ _ - _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ - _ _ _ _ _ _ _ _