Forwards Rev 16 to CPSES Emergency Plan, Section 4.5 to Update Description of Autodial Callout Sys Due to Replacement of Previous 5-machine Callout Sys & Revising Listed Titles of Emergency Plan (EP) Procedures in Ep,App K
ML20057E519
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 10/04/1993
From: William Cahill, Woodlan D
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20057E520 List:
References
TXX-93347, NUDOCS 9310120243
Download: ML20057E519 (5)


Text

-

==

lllllllllllll' 'll",,llllllll Eog # TXX-93347

"""""""l Fi1e # 10013 c1o

~.".

920 c1o r

r Ref # 10CFR50.54(a)

TUELECTRIC October 4. 1993 William J. Cahill, Jr.

Group Virr Perudent U. S. Nuclear Regulatory Commi ssi on Attn:

Document Control Desk Washington. DC 20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 TRANSMITTAL OF CPSES EMERGENCY ?LAN, REVISION 16 Gentlemen:

In accordance with 10CFR50.54(a). TU Electric herewith submits Revision 16 of the CPSES Emergency Pl an ( EP).

The chenge" comprising Revision 16 were evaluated and determined to not decrease tne effectiveness of the existing plans.

Changes are indicated by a Revision 15 change bar.

A detailed description, provided as Attachment 1. discusses individual changes indicated by the change bar.

The following is a general summary of the changes included in this revision to the CPSES Emergency Plan:

1.

Revised EP Section 4.5 to update description of autodial callout system.

A new automatic dialing system was purchased with enhanced f eatures to replace the previous '5-machine" callout system.

r 2.

Revised the listed titles of Emergency Plan Procedures in EP Appendix K.

Enclosed is the f ollowing as prescribed in 10CFR50.4(b)(5):

CPSES EMERGENCY PLAN - 1 Original (REVISION 16) i i

Sincerely, Willian J. Cahill. Jr.

" y.:

)

6 o

0 R.

Wcodlan Docket Licensing Manager CLW/grp Attachment Enclosure c-Mr. J. L. Milboan, Regicn IV Mr. B. Spitcberg, Region IV

\\

P ident inspectors, CPSES (2) 1200"0 3 r,

9310120243 931004 PDR ADOCK 05000445 H

xx) N, Olive Street LB. 81 Dallas. Texas 75201 F

PDR ild j

. to TXX-93347 October 4. 1993 Page 1 of 2 CPSES - EMERGENCY PLAN ( EP )

AHENDHENT / REVISION 16 DETAILED DESCRIPTION Prefix Page (a1 amended)

Group Description l

4-5 3

Revise description of autodial calling system.

Revision l

A new automatic dialing system was purchased and installed to replace the "old" 5-machine callout I

system. The new system has several enhanced features and functions to provide all of the capabilities of the "old" system.

Change Request Number EP-93-a.1 Commitment Register Number.

Related SER.

SSER :

l SER/SSER Impact No l

K-3 3

Revise listed titles to Emergency Plan Procedures EPP-303, EPP-313 and EPP-900.

i Revision Titles revised to more accurately reflect the contents of the subject procedures.

Change Request Number

EP-93-6.1 Commitment Register Number :

Related SER -

SSER.

SER/SSER Impact

No K-3 3

Delete reference to Emergency Plan Procedure EPP-311. " Assessment of Plant Conditions During Declared Emergencies Using the Emergency Response Facility Computer System (ERFCS)"

Revision l

The Emergency Response Facility Computer System e

(ERFCS) was deleted due to a design modification (DM-92-039) which deleted the ERFCS from Unit I and incorporated its functins into the new Unit I and 2 Plant Computer Systems (PCS). Guidance and t

instructions provided by EPP-311 are now provided by User Guides for the PCS. Key Emergency Organization position personnel have been trained on the subject PCS User Guides: the PCS User Guides are available in the CPSES Emergency Response Facilities..

Change Request Number

EP-93-6.2 Commitment Register Number Related SER :

SSER :

l SER/SSER Impact

No i

K-4 3

Revise procedure title for Emergency Plan Procedure EPP-908.

Revision Title revised to more accurately reflect the i

contents of the subject procedure.

l Change' Request Number EP-93-6.3 l

Attachment'l to TXX-93347 October 4, 1993 Page 2 of 2 i

Prefix Page (as amended)

Gr_o_up Description Commitment Register Number :

Related SER -

SSER.

SER/SSER Impact No

'I r

4 a

r e

i f

l l

i l

i I

i

i i

\\

l I

r h

L

?

t f

f i

r i

EflCLOSURE TO TXX-93347 7

i e

}

L F

l f

I

)

r i

k e

t t

I

?

i

.I 1

1 5

I h

i i

r

l l

CDMANCHE PEAK STEAM ELECTRIC STATION EMERGENCY PLAN REVISION INSTRUCTION SHEET The following instructional information and check list is furnished to help insert Revision 16 into the Comanche Peak Steam Electric Station Emergency Plan (EP).

Discard the old sheets and insert the new sheets, as listed below.

I R emov.g Insert Emergency Plan Title Page Emergency Plan Title Page 4-5 4-5 i

K-3 K-3 K-4 K-4 EPL-1 EPL-1 5

EPL-3 EPL-3 EPL-7 EPL-7 EPL-9 EPL-9 i

?

t a

p 9

i

.e