ML20057D634
| ML20057D634 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 09/30/1993 |
| From: | Carter J DUKE POWER CO. |
| To: | Eleazer T SOUTH CAROLINA, STATE OF |
| References | |
| NUDOCS 9310050096 | |
| Download: ML20057D634 (3) | |
Text
il I
Duke nunt Company Generation Services Department 13339 Hagers Ferry Road H.ntersvitie, NC28078 7929
[
DUKEPOWER September 30, 1993 Mr. Timothy M.
Eleazer Industrial and Agricultural Wastewater Division South Carolina Department of Health and Environmental Control 2600 Bull Street Columbia, SC 29201
Subject:
Catawba Nuclear Station -NPDES Permit No. SC0004278 Request to Reduce Toxicity Monitoring-Outfalls 001, 002 File: CN-254.00
Dear Mr. Eleazer:
The purpose of this memo is to request a reduction in the toxicity monitoring requirements for Catawba Nuclear Station's outfalls 001 and 002.
Please find a summary of the toxicity monitoring history for these two outfalls listed below:
Date Outfall 001 Outfall 002 October 1992 Pass Pass November 1992 Pass Pass December 1992 Pass Pass January 1993 Pass Pass February 1993 Pass Pass March 1993 Pass Passl i
April 1993 Pass Fail April 1993 Retest N/A Pass May 1993 Pass Pass June 1993 Pass Pass July 1993 Pass Pass s
August 1993 Pass Pass i
i(0\\l n.s n o r i C'
e' 9310050096 930930 PDR ADOCK 05000413 v
p PDR k
- s b
Please note that in Part III, special condition #13 (e) allows for a reduction in the monitoring from monthly to quarterly after twelve consecutive months of toxicity testing has been_ completed.
Additionally, it is requested that Part III, special condition #14 be put into effect.
This will allow pages 5 & 9 of the permit to become effective and for pages 4 & 8 to expire.
Pages 5 &
9 require that 1
sample per month be collected.
Therefore, if the request to drop the frequency to quarterly is
- granted, these sheets will need to be revised by the State to show the new frequency of quarterly sampling. Additionally, pages 5 & 9 differ from pages 4 & 8 in that Part III, Special Condition #13 e is omitted from the requirements.
This is the condition which requires that a toxicity evaluation plan be submitted following a failed toxicity test.
We would like for the State to verify that this is correct.
If possible we would like a response to this request prior to the November, 1993 sampling.
If you need additional information or have any questions please call John Estridge at (704) 875-5965 or Robert Wylie at (704)875-5970.
Sincerely, John Carter, Technical System Manager Environmental Division, Water Protection Jte/240 cc:
NRC Document Distribution
\\
l
1
,.,7->
1
..bc:
,J.T. Harris-CN01EM.
I A.P.
Jackson-CNO3CH 1
M.A.
Lascara S.D.
Davenport-EC07D C.L.
Peed-CN01EM W.J. Davis-CN01CH R.R.
Wylie G.W..Sain-EC07D J.S.
Velte h
r t
i i
h i
I l