ML20057D441
| ML20057D441 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 09/28/1993 |
| From: | Collins S NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Barkhurst R ENTERGY OPERATIONS, INC. |
| Shared Package | |
| ML20057D442 | List: |
| References | |
| NUDOCS 9310040224 | |
| Download: ML20057D441 (5) | |
See also: IR 05000382/1993025
Text
. --
_ .-
.
-
- . . ,
,
.
.
Y
UNIVED STAVES '-
[pco afCQ
?g
NUCLEAR REGULATORY COMMISSIOM
j
'
['
'O
.j
~ RtolON IV
,
l
- '
'5
611 RYAN PLAZA DRIVE, SUITE 400 -
o
,
4... + /
A
AR UNGTON, T EXAS 76011-8064
1
SR 2 8 !993
l
l
Docket:
50-382
!
License:
l
!
1
Entergy Operations, Inc.
.
ATTN: Ross P. Barkhurst, bice President
.
Operations, Waterf'.rd
-!
P.O. Box B
1
-K111ona, Louisiana 70066
1
i
SUBJECT: NRC INSPECTION REPORT 50-382/93-25
This refers to the inspection conducted by Messrs. C. J. Paulk, R. B. Vickrey,
'
and Ms. P. A. Goldberg of this office on July 26-30 and August 26, 1993. The-
inspection included a review of activities authorized for your Waterford Steam
i
Electric Station, Unit 3, facility. At the conclusion of the inspection, the
l
findings were discussed with those members of your staff identified in the-
!
enclosed report.
[
Areas examined ~during the inspection are identified in the report. Within
these areas, the inspection consisted of selective examinations.of procedures-
1
and representative records, interviews with personnel, and observation of '
j
activities in progress. The results of this inspection are documented in the
enclosed report.
,
J
Based on the results of this inspection, certain licensed activities appeared
i
to be in violation of NRC requirements, as specified in the_ enclosed Notice of
Violation (Notice). The violation is of concern because the failure to
identify code safety valve setpoints outside of Technical Specifications could
result in the plant operating outside of design basis.
It is our understanding that, du' ring the exit meeting conducted on July 30,
1993, Mr. J. Hologa, Acting Director, Design Engineering, committed to review
condition identifications and work authorizations that were initiated in the
1988 through 1991 timeframe to verify that the associated design documents
were revised.
If your understanding of this commitment differs from ours,
please contact me immediately.
You are required to respond to this letter and should follow the instructions
specified in the enclosed Notice when preparing your response'
In your
.
response, you should document the specific actions taken and any additional
actions you plan to prevent recurrence. After reviewing your response to this
1
Notice, including your proposed corrective actions and the results of future
inspections, the NRC will determine whether further NRC enforcement action is
1
necessary to ensure compliance with NRC regulatory requirements.
H
9310040224 93o92s
Q
gDR
ADOCK05000382k-
fg
=
- .
.
-
.
,
-
--
-
.
.
,
.
Entergy Operations, Inc.
-2-
I
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of
this letter and its enclosures will be placed in the NRC Public Document Room.
,
i
The responses directed by this letter and the enclosed Notice are not subject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, Pub. L. No. 96.511.
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
Sincerely,
f
a
E
rector
Division of Reactor Safety
Enclosures:
1.
Appendix A - Notice of Violation
2.
Appendix B - NRC Inspection Report
50-382/93-25
cc w/ enclosures:
.
"
Entergy Operations, Inc.
ATTN:
Harry W. Keiser, Executive
,
Vice President & Chief Operating Officer
'
P.O. Box 31995
>
Jackson, Mississippi 39286-1995
,
Entergy Operations, Inc.
ATTN: John R. McGaha, Vice President
1
Operations Support
P.O. Box 31995
Jackson, Mississippi
39286
Wise, Carter, Child & Caraway
ATTN:
Robert B. McGehee, Esq.
P.O. Box 651
Jackson, Mississippi 39205
Entergy Operations, Inc.
ATTN:
D. F. Packer, General
Manager Plant Operations
P.O. Box B
Killona,. Louisiana 70066
<
.
.
'
,
Entergy Operations, Inc.
-3-
Entergy Operations, Inc.
ATTH:
L. W. Laughlin
Licensing Manager
P.O. Box B
Killona, Louisiana 70066
Chairman
Louisiana Public Service Commission
i
One American Place, Suite 1630
Baton Rouge, Louisiana 70825-1697
Entergy Operations, Inc.
ATTN:
R. F. Burski, Director
,
Nuclear Safety
P.O. Box B
Killona, Louisiana 70066
,
'
Hall Bohlinger, Administrator
Radiation Protection Division
P.O. Box 82135
i
Baton Rouge, Louisiana 70884-2135
Parish President
i
St. Charles Parish
P.O. Box 302
Hahnville, Louisiana 70057
Mr. William A. Cross
.
Bethesda Licensing Office
!
3 Metro Center
Suite 610
Bethesda, Maryland 20814
Winston & Strawn
ATTN: Nicholas S. Reynolds, Esq.
1400 L Street, N.W.
Washington, D.C.
20005-3502
i
1
-1
.
.
-
i
..
,
_
-,
-
.
Entergy Operations, Inc.
-4-
7
l
bec to DMB (IE01) - DRS and DRP
bcc distrib. by RIV:
.
J. L. Milhoan
Resident Inspector
'
Section Chief (DRP/D)
Lisa Shea, RM/ALF, MS: MNBB 4503
MIS System
DRSS-FIPS
RIV File
Project Engineer (DRP/D)
Section Chief (DRP/TSS)
C. Paulk
P. Goldberg
T. Westerman
,
Allegations Coordinator (2)
G. Sanborn, EO
!
I
k
i
!
!
)
RIV:RI:ES
RI:ES[
RI:ES
C:ES
ADD:DRS
AD:DRP
PAGo)/ erg *
RBVickrey*
TFWesterman*
IBarnes*
TPGwynn*
CJPaul k*
db
/' /93
/[/93
/ /93
/ '/93
/ /93
/ /93
i
,
!
RIV:AC n,3
D:DM
RWise [
S[Cd1Uns'
[
k/A/93
kfl>/[
!
~
- Prev ~iously concurred.
j
!
.
.
--________
_ _____ - _______ - __ _ __ ________ - __ _____
_ _ _ _
.
.
'Entergy Operations, Inc.
-4-
bec to;DMBl(IEOI)- L DRS andiDRP
j
bcc distrib. by RIV:
-
J. L. Milhoan
Resident Inspector
I
Section Chief (DRP/D)
Lisa Shea, RM/ALF, MS: HNBB 4503
MIS System
DRSS-FIPS
RIV File
Project Engineer (DRP/D).
Section Chief (DRP/TSS)
C. Paulk
P. Goldberg
T. Westerman
Allegations Coordinator (2)
G. Sanborn, EO
C$o
/
RIV:RI:ES
RI:ES[
RI:ES
C:ES
ADD:DRS
AD:DRP
CJPaul k*
PAGo}dberg*
RBVickrey*
TFWesterman*'
IBarnes*
TPGwynn*
/ /93
/[/93
/ /93
/ /93
/ /93
/ /93
!
RIV:AC n,,)
D:D M
RWise b
S[CdlUns
k/A/93
kfl>/ [
- Previously concurred.
0400O
f;1
1
_
_ _ _ _ _ _ _ _ - _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ - - - _ _