ML20057D360
| ML20057D360 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 09/24/1993 |
| From: | Snell W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Stratman R CENTERIOR ENERGY |
| Shared Package | |
| ML20057D361 | List: |
| References | |
| NUDOCS 9310040144 | |
| Download: ML20057D360 (2) | |
See also: IR 05000440/1993017
Text
y o-
,
1
.
SEP 2 41993
Docket No. 50-440
Centerior Service Company
ATTN:
Mr. Robert A. Stratman
Vice President
Nuclear - Perry
P.O. Box 97, 5270
Perry, OH 44081
Dear Mr. Stratman:
,
SUBJECT:
INSPECTION OF RADIATION PROTECTION AND RADWASTE PROGRAMS
l
This refers to the routine inspection conducted by Messrs. M. A. Kunowski and
R. A. Paul of this office on August 23 - 27, 1993. The inspection included a
,
review of activities authorized at your Perry Nuclear Power Plant. At the
conclusion of the. inspection, the findings were discussed with those members
of your staff identified in the enclosed inspection report.
,
Areas examined during the inspection are identified in the enclosed report.
Within these areas, the inspection consisted of a selective examination of
procedures and representative records,-interviews with personnel, independent
dose rate measurements, and observations of activities in progress.
I
During this inspection, certain of your activities appeared to be in violation
of NRC requirements, as specified in the enclosed Notice of Violation
.
(Notice).
This violation, for missing a technical specification surveillance
of two trains of the Fuel Handling Building ventilation system, is of concern
because it is another example of an ongoing problem with personnel errors, as
discussed in Inspection Report No. 50-440/93004(DRP).
,
You are required to respond to this letter and should follow the instructions
j
specified in the enclosed Notice when preparing'your response.
In your
response, you should document the specific actions taken and any additional
actions you plan to prevent recurrence. After reviewing your response to this
Notice, including your proposed corrective actions and the results of future
'
inspections, the NRC will determine whether further NRC enforcement action is
i
necessary to ensure compliance with NRC regulatory requirements.
i
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter, the enclosures, and your response will be placed in the NRC
Public Document Room.
,
The response directed by this letter and the accompanying Notice are not.
subject to the clearance procedures,of the Office of Management and Budget as
required by the Paperwork Reduction Act of 1980, PL 96-511.
010002
g eb l
-
g
,
9310040144 930924
ADOCK 05000440
f
.G.
j
4
-
--
_ _ _ _
l:
l
.
SE9 2 4 W
Centerior Service Company
2
l
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
l
Orig,inal Sig,ned By William Snell.
L
William Snell, Acting Chief
,
Reactor Support Programs Branch
1
-
Enclosures:
1.
2.
Inspection Report
No. 50-440/93017(DRSS)
cc w/ enclosures:
R. W. Schrauder, Director, Nuclear
Support Department
Kevin P. Donovan, Manager,
Licensing and Compliance Section
N. L. Bonner, Director, Perry
Nuclear Engineering Dept.
H. Ray Caldwell, General
Superintendent Nuclear Operations
David P. Igyarto, Plant Manager
Terry J. Lodge, Esq.
State. Liaison Officer, State of Ohio
Robert E. Owen, Ohio
Department of Health
A. Grandjean, State of Ohio,
Public Utilities Commission
OC/LFDCB
Licensing Project Manager, NRR
Resident Inspector, RIII
RIII
RIII
RIII
RIII
RIII-
nM m
@V
LdlO
McCormlck-Barger
l
MKf<\\
Kunowski/jp
Paul
Lariks. bury
Sngli
l
09/jf/3
4 lifG
J/24/D
l
L
l