Responds to 930823 Memo Inquiring About Use of Individual Plant Exam Database for Advanced Reactor Evaluations
ML20057D121
Person / Time
Issue date: 09/23/1993
From: Taylor J
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
To: Rogers
NRC COMMISSION (OCM)
Shared Package
ML20057D122 List:
References
NUDOCS 9310010136
Download: ML20057D121 (4)


Text

, _..

m_

~. - _

~

4-

+

UNITED STATES 2

E NUCLEAR REGULATORY COMMISSION I,.

I*

\\

September 23, 1993 l'

I MEMORANDUM FOR: Commissioner Rogers FROM:

James M. Taylor Executive Director for Operations

SUBJECT:

RESPONSE TO MEMORANDUM OF AUGUST 23, 1993, INQUIRING ABOUT USE OF THE INDIVIDUAL PLANT EXAMINATION (IPE) DATABASE FOR ADVANCED REACTOR EVALUATIONS t-By memorandum dated August 23, 1993, you inquired about the staff's plans to I

use the computerized database being developed by Brookhaven National Labora-tory (BNL) in its evaluations of new advanced light-water reactor (ALWR) l designs. As you stated, the database, which compiles plant-specific informa-

.l tion from the IPE submittals, could prove useful in the ALWR evaluations. You also asked to what extent the staff uses the performance findings developed by the Office of Analysis and Evaluation of Operational Data (AE0D) in its ALWR design reviews.

In completing our safety evaluations, the staff has utilized insights from a wide range of sources'in developing requirements for ALWRs. These sources i

include; PRAs of operating reactors, Severe Accident Research, and Operational Experience. These insights have led us to propose additional requirements for

~

ALWRs in a number of areas including: ATWS, station blackout, fire protec-tion, core debris flooding, containment overpressure protection, and contain-ment cavity materials.

In addition, a design-specific PRA was conducted and reviewed by the staff to determine if additional design enhancements were warranted. The BNL IPE database, when complete, will be an excellent source of data for the staff to use. The staff expects to use this database to the extent practical in the passive ALWR reviews.

AE0D results of performance findings are used indirectly in the ALWR reviews.

Reviews of the ALWR PRAs focus on determining whether equipment reliability and initiating event frequencies can be achieved, based on past experience with existing plants. For example, the staff agreed with the relatively low trip rate assumed in the ABWR PRA because data for existing plants has shown j

an improving plant trip rate. However, the significance of the specific-

)

reliability and event frequency data used in the PRA is less important than j

the results of sensitivity and importance analyses used to determine which 1

$m a ate,p 0 "[F ?"O @maaMJ Qf5 W cm o e <_ ;, e a

.3 CONTACT:

O-M b J

J. H. Wilson, NRR h'Y

  • f K Os d-M (Lk % ) s % n y )

504-1108

,3yy_g(bu mW*)

9310010136 930923 b' } ' 4 03Q

/g n 1 PDR ORC NE E l?h

i Commissioner Rogers September 23, 1993 systems, structures, and components contribute most to minimizing risk. These systems, structures, and components are then identified for inclusion in a reliability assurance program.

I hope this information is responsive to your request.

Originalsigned by James M. Taylor James M. Taylor Executive Director for Operations cc:

The Chairman Commissioner Remick Commissioner de Planque SECY OGC OCA OPA DISTRIBUTION:

See next page t

  • SEE PREVIOUS CONCURRENCE OFC:

PM:PDST LA:PDST TECH ED (A)SC:PDST D:PDST NAME:

JHWilson:sg*

PShea*

DGable*

TEssig*

RBorchardt*

DATE:

09/09/93 09/20/_93d 09/09/93 09/09/93 09/20/93 k,D:fM EDO,

0FC:

DSSA ADAR

'6 NAME:

AThadani*

DCb0tbhf'ielklddlh JTaykr i

DATE:

09/17/93 09/nk/9b d9kh93 09/h/93 0FFICIAL RECORD COPY:

DOCUMENT NAME:

GT9280 l

4 DISTRIBUTION:

Central File PDR (w/ir. coming)

ED0 # (GT-0009280)

E00 R/F JMTaylor,17G21 JSniezek, 17G21 JBlaha, 17G21 HThompson, 17G21 TEMurley/FJMiraglia, 12G18 EJordan, AE0D JGPartlow, 12G18 WTRussell, 12G18 FGillespie, 12G18 DMCrutchfield WTravers RBorchardt TEssig JHWilson PShea JMoore, 15B18 NRR Mail Room (GT-0009280), 12G18 BToms, (GT-0009280)

PMagnanelli, (GT-0009280)

PDST R/F

_________.-______-_______-_._.____________________b

b V

{Y p myCu j

UNITED STATES f

p%

g pf, /q. g,jO j

.t p

. 4) e (' '

g NUCLEAR REGULATORY COMMISSION t

l ;I4 f

yis

.a WAsHiNGTow, p. c. 20sss s$

ki N % h h5 0

. $Y EDO Principal Correspondence Control FROM:

DUE: 09/08/93 EDO CONTROL: 0009280 DOC DT: 08/23/93 FINAL REPLY:

Commissioner Rogers gy,,,ig ([Ligu s tiw, I(ggg,

( Mc in )

TO:

, (tj

(

7 c i,2 A

)

James M. Taylor FOR SIGNATURE OF:

Executive Director DESC:

ROUTING:

ADVISE IF AND HOW THE STAFF INTENDS TO FACTOR THE Taylor BNL IPE DATABASE INTO THE ALWR EVALUATIONS AND TO Sniezek WHAT EXTENT HAVE THE ALWR DESIGN REVIEWS UTILIZED Thompson THE PERFORMANCE FINDINGS OF AEOD - SECY-93-110 Blaha Murley, NRR DATE: 08/24/93 Jordan, AEOD j

ASSIGNEDTO:h?5d'h CONTACT:

/hd9 f/2 4 5

Bes W f(

SPECIAL INSTRUCTIONS OR REMARKS:

4 Q-

  • nF%h NRR RECEIVED: AUGUST 26 NRR ACTION:

DAR:CRUCHFIELD COORDINATE WITH ADT DIRECTORS AS APPROPRIATE NRR ROUTING TEM /FJM JP WR TG ADT DIV DIRS MRR MAIL ROOM 1

ACTION DUE TO MRR DIRECTOR'S n

g u/b_#_7_3 i

b L-q "~

>