ML20057C826

From kanterella
Jump to navigation Jump to search
Single Positive Test Form Collected on 04/22/2019
ML20057C826
Person / Time
Site: Palisades Entergy icon.png
Issue date: 02/24/2020
From: Summers S
Entergy Nuclear Operations
To:
Office of Nuclear Security and Incident Response
Shared Package
ML20057C816 List:
References
PAL-2019-06
Download: ML20057C826 (1)


Text

~ 1 LJ S N f> (~ '

FFD Program Performance Data Report ng System

~ - -

NRC Forr1 890 S nglc Pos '1ve Test For*11

{'r, *(1, II//;: /'1',*J*/1* tll/1/ flt, / 111,rot/l*lo'//(

  • t '*

' ~ '

,.' 'd

1) All fields required except thou marked 'optionar
1) Entries In some fields auto-populate Information in other fields JJ Mouse over form fields to view additional Information

.fJ Use of Adobe RHdtr 8 or later Is required D

Submission Update Uni ue Reference ID Licensee Su lied PAL-2019-06 Facility jPai sades [50-255]

APPROVED BY 0MB: CLEARANCE NO. 31S0-0148 EXPIRES: 04/30/2021 Estimated burden per response to compfy with thi& colection request is 30 rrinutes. TM form II a voluntary means ofreporting the information required under 10 CFR 26.417(b)(2) and 26.717. The Information iuequired by NRC to obtain on an annual basis site specific fitness-for-duty (FFD) prog,am pertormance data on drug and alcohol p,og,ams from licensees and othe, entities. Send comments rega,ding butden estimate to the FOIA, Privacy and Information Collection Bfanch (TS.-F53), US Nuclear Regulatory ComlRssion, Washington oc 20555.0001. or by e-mail to lnfocoJlrai:t$ Rcsouruu@tfflC goi, and to lhe Desk Officer, Office of lnfo,mation and Regulatory Affairs, NEOB-1020, (3150-0146). Office of Management and Budget, Washington DC 20503.

If a means used to irl'4)ose information conection does not display a currently vatid 0MB control number, lhe NRC may not conduct or sponso,. and a person is not required to,espond to, lhe information collection Date of Collection I 0412212019 I (mmldd/yyyy)

Pre-Access Testing Reason (optional)

Please elaborate (optional)

Reason for Testing - 26. 717(b)(5)

I Pre-Access jReinstatement (Between 31 and 365 days)

Day and Z1mme1man.Craft Employment Type - 26.717(b)(3) lcontractorNendor Labor Category

  • 26 717(b)(3)

!Other Outage Worker (optional)?

jNo Please elaborate on the Labor Category selected Ironworker Is this a 24-hour reportable event under 26.719(b)? ~

Was this collection refused?. 26.717(b)(7) & 26 75 ~

Subversion Attempt

  • Did this collect1on involve a subversion attempt? - 26 717(bK7) and 26.75(b) LI __

v_e_s __ ~

D Did not appear for testing D Shy-bladder (no medical condotion)

D Refused to provide initial specimen 181 Refused to provide second specimen 181 Specimen temperature (out of range)

D Specimen paraphernalia identified D Specimen characteristics (e g, color, odor. proopitant) 0 Invalid test result (initial specimen collected)

  • 26 18S(n D Refused to follow dlrecbons D Donor admitted to subversion attempt OOther Management Actions. 26.717(b)(8) & 26 75 Reason tor the Action lsubversion attempt Sancbon Applied (NRG Minimum or Licensee Administrated)

INRC Minimum Specific Sanction Appl,ed

'Permanent Oe 111al Person(s) Responsible for Information Provided Pe,son 1 (1equired);

Please elaborate on the cholcetsl selected.

Specimen presented to collector had a temp out of range lndiVldual refused to submit to second tesl unde, direct observation ILs_c*_* __ ~~=-----1 lsummers I

IAAIFFO Supervisor I

ssumme1@entergy.com F(rst Name

~--

-.La-s~t~N~a-m_e ____ ~----,P"'o"'s7rtic:-o=-n"'ns.1U"'e---~ -----=c-om-pa-n-y""E,_m-a""il~A~dd,..,...re_s_s __ _

Pe,son 2 (optional):

~=~11~~==,----~II~ ----..=~~ -~===-r=-=---

First Name Last Name Position Title Company Email Address Final Step (Requfred)

  • NRC wi11 consider lhis form authentic in accordance wilh 10 CFR 26. 11 onty when lhe "Va6date & Lock" button Is clicked and all errors (highlighted In 1ed) have been corrected. The "Validate & Lock" button will change to "Locked* after the data validation process has been successfully completed indicating the form is ready for submission.

Form Locked On:!Feb 24, 2020 at 4.14:19 PM Single Positive Test Fann (version 1.8.0 - April 2018) j Save to Local PC 11 Print this Report j NRC Fann 890 (12/2014)