ML20057C608

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-361/93-23 & 50-362/93-23 on 930719-23.No Violations or Deviations Noted
ML20057C608
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 08/13/1993
From: Miller L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Ray H
SOUTHERN CALIFORNIA EDISON CO.
Shared Package
ML20057C609 List:
References
NUDOCS 9309290161
Download: ML20057C608 (3)


See also: IR 05000361/1993023

Text

.

  • /p arcoq%

UNITED STATES

75

NUCLEAR REGULATORY COMMISSION

d Y ,h

3'

REGION V

1450 MARIA LANE

% ,,, g + e

WALNUT CREEK. CAUFORNtA 94596-5368

HUG 13 1993

Docket Nos. 50-361 and 50-362

Southern California Edison Company

Irvine Operations Center

23 Parker Street

Irvine, California 92718

Attention: Mr. Harolo B. Ray

Senior Vice President, Nuclear

SUBJECT:

NRC INSPECTION REPORT NOS. 50-361/93-23 AND 50-362/93-23

This refers to the routine announced inspection conducted by Mr. W. J. Wagner

of this office on July 19 through July 23, 1993, of activities authorized by

NRC Operating License Nos. NPF-10 and NPF-15. The results of this inspection

were provided in discussions held with members of your staff on July 23,

1993.

Areas examined during this inspection are described in the enclosed

inspection report. Within these areas, the inspection consisted of selective

examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

No violations or deviations were identified within the scope of this

inspection.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

-

will be placed in the NRC Public Document Room.

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

Sincerely,

s

L. F. Miller, Jr., Chief

Reactor Safety Branch

Enclosure:

Inspection Report Nos. 50-361/93-23 and 50-362/93-23

'\\' A

i

9309290161 930813

PDR

ADOCK 05000361

G

PDR ,

--

_

.

W

.

2

cc w/ enclosure:

Mr. Edwin A. Guiles, Vice President Engineering & Operations, San Diego Gas

and Electric Co.

Mr. J. P. Shotwell, Southern California Edison Company

Chairman, Board of Supervisors, County of San Diego

.

Alan P. Watts, Esq., Rourke & Woodruff

Mr. Sherwin Harris, Resource Project Manager, Public Utilities Department

Mr. Charles B. Brinkman, Manager, ABB Combustion Engineering Nuclear Power

Mr. R. W. Krieger, Vice President, Nuclear Generation, Southern California

,

Edison Company

Mr. Don J. Womeldorf, Chief, Environmental Management Branch

Mr. Richard J. Kosiba, Project Manager, Bechtel Power Corporation

Mr. Robert G. Lacy, Manager Nuclear Department

Mr. Steve Hsu, Radiologic Health Branch

Mayor, City of San Clemente

,

i

l

t

[

.

,

!

I

h

,

I

r

,

, - . - _ -

_.

,

.

.

-

.

..

i

-

.

i

-

s

,

,

3

-

bec w/ enclosure:

Docket File

Resident Inspector

Project Inspector

M. Fields, Project Manager

G. Cook

K. Perkins

'

S. Richards

B. Faulkenberry

bec w/o enclosure:

!

J. Zollicoffer

M. Smith

J. Bianchi

'

'

REGION V

MN

6 (P[

H. Dong

L. 'ller

W. Wagner

W.An

d

,

/hjf)$h3

Tlt >l4 3

TRE01Eff t0PY1 iREDUEST COPY 1 IREQUEST COPY 1 IRE 0 VEST COM1

iMLS'

N0 1 I (tESI

NO 1 I /VES)

NO 1I

YES

A10 /1

y

v

v

v

ISE#DsTO DCS1 ISEVIPTO PDR1

I / YE9 NO 1 I /YES/ NO 1

V

V

i

!

>

l

b

'

280026

1(

n oi

P o. t.