Forwards Insp Repts 50-361/93-13 & 50-362/93-13 on 930719-23 & 0802-06 & Notice of Violation
ML20057C560
Person / Time
Site: San Onofre  
Issue date: 09/03/1993
From: Miller L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Ray H
SOUTHERN CALIFORNIA EDISON CO.
Shared Package
ML20057C561 List:
References
NUDOCS 9309290117
Download: ML20057C560 (3)


See also: IR 05000361/1993013

Text

p

j

.

,<

/

%,

UNITED STATES

,

px.

3

NUCLEAR REGULATORY COMMISSION

REGION V

. . .

. . ,?

l

,

l

%

.f

1450 MARIA LANE

%...*/

WALNUT CREEK, CAUFORNIA 94596-5368

l

1

'

.

,

.S.EP. 0 3 15'4

Docket Hos.: 50-361 and 50-362

i

Southern California Edison Company

Irvine Operations Center

23 Parker Street

Irvine, California 92718

Attention: Mr. Harold B. Ray

Senior Vice President, Nuclear

l

SUBJECT:

NRC INSPECTION REPORT NOS. 50-361/93-13 AND 50-362/93-13

l

This refers to the routine announced inspection conducted by Messrs. C. Clark

and M. Payne, of this office, July 19 through July 23, 1993 and August 2

I

i

through August 6,1993, and by Mr. J. Colaccino of the office of the Nuclear

Reactor Regulation / Mechanical Engineering Branch on July 19 through July

)

23, 1993, of activities authorized by NRC Operating License Nos. NPF-10 and

NPF-15. The results of this inspection were provided in discussions held by

the inspectors with Mr. L. Cash and other members of your staff on July 23

j

and August 6, 1993.

i

Areas examined during this inspection are described in the enclosed

j

inspection report. Within these areas, the inspection consisted of selective

j

examinations of procedures and representative records, interviews with

j

r

personnel, and observations by the inspectors.

Based on the results of the inspection, it appears that one of your

activities was not conducted in full compliance with NRC requirements, as set

forth in the enclosed Notice of Violation (Notice). The violation involved

examples of failure by your inservice testing personnel to completely

,

document the performance of surveillance testing of safety related

I

components.

l

You are required to respond to this letter and should follow the instructions

specified in the enclosed Notice when preparing your response.

In your

response, you should document the specific actions taken to prevent

repetitive violations and any additional actions you plan to prevent

j

l

recurrence. After reviewing your response to this Notice, including your

proposed corrective actions and the results of future inspections, the NRC

l

will determine whether further NRC enforcement action is necessary to ensure

compliance with NRC regulatory requirements.

l-

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of

this letter and its enclosures will be placed in the NRC Public Document

Room.

f'

9309290117 93o9o3

,

DR

ADOCK CSOOO361

PDR

. _ .

F

.

.

.

2

The responses directed by this letter and the enclosed flotice are not subject

to the clearance procedures of the Office of Management, and Budget as

required by the Paperwork Reduction Act of 1980, Pub. L. No. 96.511.

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

Sincerely,

T,

L. F. Miller, Jr / Chief

Reactor Safety Branch

Enclosures:

1.

tiotice of Violation

2.

Inspection Report Nos. 50-361/93-13 and 50-362/93-13

cc w/ enclosures (1) and (2):

Mr. Edwin A. Guiles, Vice President Engineering & Operations, San Diego Gas

and Electric Co.

Mr. J. P. Shotwell, Southern California Edison Company

Chairman, Board of Supervisors, County of San Diego

Alan R. Watts, Esq., Rourke & Woodruff

Mr. Sherwin Harris, Resource Project Manager, Public Utilities Department

Mr. Charles B. Brinkman, Manager, ABB Combustion Engineering Nuclear Power

Mr. R. W. Krieger, Vice President, Nuclear Generation, Southern California

Edison Company

Mr. Don J. Womeldorf, Chief, Environmental Management Branch

Mr. Richard J. Kosiba, Project Manager, Bechtel Power Corporation

Mr. Robert G. Lacy, Manager, Nuclear Department

Mr. Steve Hsu, Radiological Health Branch

Mayor, City of San Clemente

E

- .-

.

.

,

3

l

'

bec w/ enclosure:

Docket File

Resident Inspector

Project Inspector

i

M. Fields, Project Manager

G. Cook

i

K. Perkins

!

S. Richards

!

B. Faulkenberry

j

bec w/o enclosure:

)

J. Zollicoffer

'

M. Smith

1

J. Bianchi

REGION V

GfikA-

0 $

f~

f * RU? "f Sh'/6"

E.Gr)ove

W.Ang l"l'N u'

r6 f

{ P" l1W%

0b

He "

!

C.Clar

M.Payne

J.Colaccino

coF&uol'tl'3} llp

n

WJ/n

C-mko

G.

pcc/

'

i

IRE 00EST, COPY 1 IREQUEST COPY 1 IRE 0 VEST COPY 1 IRE 0 VEST COPY 1 IREQUEST COPY 1

I /TES / NO 1 I /YES/ N0 1 I /YES / N0 1I YES

N0 1 (YES) N0

1.

l

s

s

v

v

'l

/

v'&

j!b .

l

H.

an

L. Miller

R.Huey

0l[$

$/$l0

RE0lfEST COPYl' IRE 00EST COPY 1 IRE 0lf6T COPY 1

'

If YES

NO 1I YES

NO 1 I/YES / N0 1

)

ISEND'TO DCS1 ISE W TO PDR1

I iYES/ NO 1 I /YES /NO 1

'I

v.-

j

,

i

.

[80021

.

4

1

TEol

.--

-

.

.

--

-

,_

._

.

-.-

-