Text
__
f **Cu UNITED STATES y,
.,o,,
NUCLEAR REGULATORY COMMISSION g
g
- E WASHINGTON, D. C. 205SS Y
%, *., + J PACIFIC GAS AND ELECTRIC COMPANY DOCKET N0. 50-275 DIABLO CANYON NUCLEAR POWER PLAhT. UNIT NO. I t
AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 83 i
Licens? No. DPR,
1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Pacific Gas & Electric Company (the licensee) dated December 24, 1992, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations set forth in i
10 CFR Chapter I; i
B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
l 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-80 is hereby amended to read as follows:
9309280260 930917 PDR ADOCK 05000275 P
i 9 ;
(2)
Technical Specifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised i
through Amendment No. 83
, are hereby incorporated in the license.
Pacific Gas & Electric Company shall operate the i
facility in accordance with the Technical Specifications and the Environmental Protection Plan, except where otherwise stated in specific license conditions.
3.
This license amendment is effective as of the date of its issuance.
FOR THE NUCLEAR REGULATORY COMMISSION d*w $
Theodore R. Quay, Director Project Directorate V Division of Reactor Projects III/IV/V Office of Nuclear Reactor Regulation i
Attachment:
Changes to the Technical Specifications Date of Issuance: September 17, 1993 i
~
I
- po ucoq'o, UNITED STATES
['
Ij NUCLEAR REGULATORY COMMISSION E
WASHINGT ON, D. C. 20S55 p
I PACIFIC GAS AND ELECTRIC COMPANY DOCKET NO. 50-323 DIABLO CANYON NUCLEAR POWER PLANT. UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE i
Amendment No. 82 License No. DPR-82 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Pacific Gas & Electric Company l
(the licensee) dated December 24, 1992, complies with the i
standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-82 is hereby amended to read as follows:
(2)
Technical Specifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 82, are hereby incorporated in the license.
Pacific Gas & Electric Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan, except where otherwise stated in specific license conditions.
3.
This license amendment is effective as of the date of its issuance.
FOR THE NUCLEAR REGULATORY COMMISSION S.
y Theodore R. Quay, Director Project Directorate V Division of Reactor Projects III/IV/V 6
Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance:
September 17, 1993 I
J 4
l 4
I
?
I ATTACHMENT TO LICENSE AMENDMENTS AMENDMENT NO. 83 TO FACILITY OPERATING LICENSE NO. DPR-80 l
AND AMENDMENT NO. 82 TO FACILITY OPERATING LICENSE NO. DPR-82 DOCKET NOS. 50-275 AND 50-323
[
Revise Appendix A Technical Specifications by removing the pages identified below and inserting the enclosed pages. The revised pages are identified by the captioned amendment number and contain marginal lines indicating the area of change. Overleaf pages are also included, as appropriate.
REMOVE INSERT 4 of 6 4 of 6 3/4 8-11 3/4 8-11 3/4 8-12 3/4 8-12 3/4 8-12a 3/4 8-13 3/4 8-13 3/4 8-14 3/4 8-14 i
i t
i
}
l S
t i
I wea 1ee-i e a w
APPENDIX A TO LICENSE NOS. DPR-80 AND DPR-82 DIABLO CANYON NUCLEAR POWER PLANT UNITS 1 AND 2 TECHNICAL SPECIFICATIONS (NUREG-11511 LIST OF EFFECTIVE PAGES Pace No.
Amendment No.
Pace No.
Amendment No.
3/4 9-7 55/54 3/4 9-8 28/27 3/4 9-9 28/27 3/4 9-10 70/69 3/4 9-11 39/38 3/4 9-11a 39/38 3/4 9-12 55/54 3/4 9-13 55/54 3/4 9-14 3/4 7-37 3/4 9-15 8/6 3/4 9-16 8/6 3/4 7-38 3/4 9-17 8/6 3/4 7-39 3/4 7-40 55/54 3/4 9-18 3/6 3/4 8-1 74/73 3/4 9-19 8/6 3/4 8-2 76/75 3/4 10-1 72/71 3/4 8-2a 15/14 3/4 10-2 71/70 3/4 8-3 44/43 3/4 10-3 3/4 8-4 44/43 3/4 10-4 3/4 8-5 15/14 3/4 11-1 67/66 3/4 8-6 15/14 3/4 11-2 67/66 3/4 8-7 15/14 3/4 11-3 67/66 3/4 8-8 15/14 3/4 12-1 67/66 Title Page 3/4 8-9 Note 3/4 8-10 3/4 8-11 74/73 B 3/4 0-1 55/54 3/4 8-12 83/82 B 3/4 0-la 55/54 3/4 8-12a 83/82 3/4 8-13 83/82 B 3/4 0-Ib 55/54 3/4 8-14 83/82 8 3/4 0-2 57/56 **
3/4 8-15 B 3/4 0-2a 55/54 **
B 3/4 0-3 55/54 3/4 8-16 B 3/4 1-1 10/8 3/4 8-17 B 3/4 1-2 72/71 3/4 8-18 3/4 8-19 79/78 8 3/4 1-3 14/13 3/4 8-20 79/78 B 3/4 2-1 12/10 3/4 8-21 79/78 B 3/4 2-2 12/10 B 3/4 2-3 12/10 B 3/4 2-4 71/70 B 3/4 2-5 60/59 3/4 9-1 72/71 B 3/4 2-6 37/36 3/4 9-2 46/45 B 3/4 3-1 69/68 B 3/4 3-Is 51/50 3/4 9-3 3/4 9-4 46/45 B 3/4 3-2 B 3/4 3-3 3/4 9-5 B 3/4 3-4 75/74 3/4 9-6 DIABLO CANYON - UllITS 1 1 2 PAGE 4 0F 6 Amendment Nos.83 & 82
i ELECTRICAL POWER SYSTEMS l
A.C. SOURCES SHUTDOWN LIMITING CONDITION FOR OPERATION 3.8.1.2 As a minimum the following A.C. electrical power sources shall be OPERABLE:
a.
One circuit between the offsite transmission network and the Onsite Class IE Distribution System. and b.
One diesel generator with:
1.
An engine mounted fuel tank containing a minimum volume of 200 gallons of fuel.
2.
One supply train of the Diesel Fuel Oil Storage and Transfer system containing a minimum storage of 26.000 gallons
- of fuel in addition to the fuel required for the other unit.
APPLICABillTY: MODES 5 and 6.
ACTION:
With less than the above minimum required A.C. electrical power sources OPERABLE.
1 immediately suspend all operations involving CORE ALTERATIONS. positive reactivity changes, movement of irradiated fuel or crane operations with loads over the fuel storage pool. In addition. when in MODE 5 with the reactor coolant loops not filled, or in MODE 6 with the water level less than 23 feet above the reactor vessel flange immediately initiate corrective action to restore the required sources to OPERABLE status as soon as possible.
9 SURVEILLANCE REQUIREMENTS 4.8.1.2 The above required A.C. electrical power sources shall be demonstrated OPERABLE by the performance of each of the requirements of Specifications 4.8.1.1.1.
4.8.1.1..
4.8.1.1.3. and 4.8.1.1.4. except for Specifications 4.8.1.1.1.b.2) and 4.8.1.1.2.a.2)c).
2 b.2) for ESF timers, b.6). b.7). b.10), and b.11).
i
'The performance of Technical Specification Surveillance Requirement 4.8.1.1.3.e l
requires one fuel oil storage tank to be removed from service to be drained and cleaned. During this surveillance, the diesel generator fuel oil storage i
requirement for one unit operation in Modes 5 or 6 and one unit operation in Mode 6 with at least 23 feet of water above the reactor vessel flange or with the reactor vessel defueled is 35.000 gallons. The tank being cleaned may be inoperable for up to 10 days. For the duration of tank cleaning.
temporary onsite fuel oil storage of 24.000 gallons will be maintained. Prior to removal of a tank from service, the offsite circuits required by Technical Specification 3.8.1.1.a will be verified to be OPERABLE.
1 d
i j
DIABLO CANYGN - UNITS 1 & 2 3/4 8 11 Amendment Nos. 74 and 73 a
~
4 ELECTRICAL POWER SYSTEMS 3/4.8.2 ONSITE POWER DISTRIBUTION OPERATING i
LIMITING CONDITION FOR OPERATION 3.8.2.1 The following electrical busses shall be energized in the specified manner:
For Units 1 and 2. Cycle 6-a.
4160 volt Vital Bus F.
b.
480 volt Vital Bus F.
l c.
4160 volt Vital Bus G.
d.
480 volt Vital Bus G.
e.
4160 volt Vital Bus H.
f.
480 volt Vital Bus H.
g.
120 volt Vital Instrument A.C. Bus 1 energized from its associated inverter 6
connected to D.C. Bus 1*.
i h.
120 volt Supplemental Vital Instrument A.C. Bus 1A energized from its associated inverter connected to D.C. Bus 1*.
i.
120 volt Vital Instrument A.C. Bus 2 energized from its associated inverter connected to D.C. Bus 2*.
j.
120 volt Vital Instrument A.C. Bus 3 energized from its associated inverter i
connected to D.C. Bus 3*.
j k.
120 volt Supplemental *.' ital Instrument A.C. Bus 3A energized from its
[
associated inverter connected to D.C. Bus 3*.
1.
120 volt Vital Instrument A.C. Bus 4 energized from its associated inverter i
connected to D.C. Bus 2*.
m.
125 volt D.C. Bus 1 energized from Battery Bank 1. and its associated full-capacity charger, n.
125 volt D.C. Bus 2 energized from Battery Bank 2. and its associated full-capacity charger, and o.
125 volt D.C. Bus 3 energized from Battery Bank 3. and its associated full-capacity charger.
i t
?
- Two vital instrument A.C. inverters or one vital and one supplemental vital instrument A.C.
' inverter may be disconnected from their D.C. busses for up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> for the purpose of performing an equalizing charge on their associated battery bank provided: (1) their vital busses are energized, and (2) the vital busses associated with the other battery banks are energized from their associated inverters and connected to their associated D.C. busses.
DIABLO CANYON UNITS 1 & 2 3/4 8-12 Amendment Nos. 83 and 82 y
ELECTRICAL POWER SYSTEMS
[
LIMITING CONDITION FOR OPERATION (Continued)
For Units 1 and 2. Cycle 7 and after:
a.
4160 volt Vital Bus F, b.
480 volt Vital Bus F, c.
4160 volt Vital Bus G.
d.
480 volt Vital Bus G, e.
4160 volt Vital Bus H, f.
480 volt Vital Bus H, g.
120 volt Vital Instrument A.C. Bus I energized from its associated inverter connected to D.C. Bus 1, h.
120 volt Vital Instrument A.C. Bus 2 energized from its associated inverter connected to D.C. Bus 2, 1.
120 volt Vital Instrument A.C. Bus 3 energized from its associated inverter connected to D.C. Bus 3.
j.
120 volt Vital Instrument A.C. Bus 4 energized from its associated inverter connected to D.C. Bus 2.
k.
125 volt D.C. Bus 1 energized from Battery Bank 1, and its associated full-capacity charger.
1.
125 volt D.C. Bus 2 energized from Battery Bank 2, and its associated full-capacity charger, and m.
125 volt D.C. Bus 3 energized from Battery Bank 3 and its associated full-cepacity charger.
APPLICAB]LITY: MODES 1, 2, 3, and 4.
ACTION:
For Units 1 and 2. Cycle 6:
a.
With one of the required 4160 volt and/or associated 4B0 volt vital busses not energized, re energize them within B hours or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
b.
With one vital instrument A.C. bus not energized from its associated inverter, or with one inverter not connected to its associated D.C. bus, re energize the vital instrument A.C. bus from an alternate source within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hour3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />s: re energize the vital instrument A.C. bus from its asso-ciated inverter connected to its associated D.C. bus within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
c.
With more than one full capacity charger receiving power simultaneously from a single 480 volt vital bus or any D.C. bus not receiving power from its associated A.C. division, restore the system to a configuration wherein each charger is powered from its associated 4B0 volt vital bus within 14 days or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
DIABLO CANYON - UNITS 1 & 2 3/4 B 12a Amendment Nos. 83 and 82
ELECTRICAL POWER SYSTEMS LIMITING CONDITION FOR OPERATION (Continued) i 2
ACTION (Continued) For Units 1 and 2. Cycle 6 d.
With one D.C. bus not energized from its associated battery bank and a full-capacity charger, re energize it from its associated battery bank and a full-capacity charger within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
With one supplemental vital instrument A.C. bus not energized from its e.
associated inverter or with its inverter not connected to its associated D.C.
bus, re energize the supplemental vital instrument A.C. bus from an alternate source within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hour3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />s: re energize the supple-mental vital instrument A.C. bus from its associated inverter connected to its associated D.C. bus within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
For Units 1 and 2, Cycle 7 and after:
With one of the required 4160 volt and/or associated 480 volt vital busses not a.
energized, re energize them within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
b.
With one vital instrument A.C. bus not energized from its associated inverter, or with one inverter not connected to its associated D.C. bus, re energize the vital instrument A.C. bus from an alternate source within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or be in at least HDT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />; re-energize the vital instrument A.C. bus from its asso-ciated inverter connected to its associated D.C. bus within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be in i
at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
With more than one full-capacity charger receiving power simultaneously from a c.
single 480 volt vital bus or any D.C. bus not receiving power from its asso-ciated A.C. division, restore the system to a configuration wherein each charger is powered from its associated 480 volt vital bus within 14 days or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
d.
With one D.C. bus not energized from its associated battery bank and a full-capacity charger, re energize it from its associated battery bank and a full-capacity charger within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
SURVEILLANCE REQUIREMENTS 4.8.2.1 The specified busses shall be determined energized in the required manner at least once per 7 days by verifying correct breaker alignment and indicated voltage on the busses.
DIABLO CANYON - UNITS 1 & 2 3/4 8-13 Amendment Nos. 83 and 82l
-. J
l
~
ELECTRICAL POWER SYSTEMS ONSITE POWER DISTRIBUTION
~
SHUTDOWN i
LIMITING CONDITION FOR OPERATION 3.8.2.2 As a minimum, the following electrical busses shall be energized in the specified manner:
l For Units I and 2. Cycle 6:
a.
One 4160 volt and its associated 480 volt A.C. vital bus, b.
Two 120-volt vital instrument A.C. busses and one 120 volt supplemental vital instrument A.C. bus energized from their associated inverters connected to their respective D.C. busses, and c.
One 125 volt D.C. bus energized from its associated battery bank and full-capacity charger supplied from its associated OPERABLE A.C. Vital bus.
For Units 1 and 2. Cycle 7 after:
a.
One 4160-volt and its associated 480 volt A.C. vital bus, b.
Two 120-volt vital instrument A.C. busses energized from their associated inverters connected to their respective D.C. busses, and c.
One 125 volt D.C. bus energized from its associated battery bank and full-Lopacity charger supplied from its associated OPERABLE A.C. vital bus.
APPLICABILITY: MODES 5 and 6.
ACTION:
With any of the above required electrical busses not energized in the required manner, immediately suspend all operations involving CORE ALTERATIONS, positive reactivity changes, or movement of irradiated fuel, initiate corrective action to energize the required electrical busses in the specified manner as soon as possible.
SURVEILLANCE REQUIREMENTS 4.8.2.2 The specified busses shall be determined energized in the required manner at least once per 7 days by verifying correct breaker alignment and indicated voltage on the busses.
DIABLO CANYON - UNITS 1 & 2 3/4 8 14 Amendment Nos. 83 and 82