ML20057C256
| ML20057C256 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 09/14/1993 |
| From: | Cline W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Beard P FLORIDA POWER CORP. |
| References | |
| NUDOCS 9309280135 | |
| Download: ML20057C256 (3) | |
Text
.
j s
SEP 141993 Docket No. 50-302 License No. DPR-72 Florida Power Corporation Mr. P. M. Beard, Jr.
Sr. VP, Nuclear Operations ATTN:
Mgr., Nuclear Licensing P. O. Box 219-NA-21 Crystal River, FL 34423-0219 Gentlemen:
SUBJECT:
CRYSTAL RIVER RADIOLOGICAL EMERGENCY PLAN REVISION We have completed our review of your submittal, dated August 13, 1993, requesting prior approval to change an emergency action level (EAL). We have concluded that the proposed change would not reduce the effectiveness of the Emergency Plan. Therefore,-the Plan if changed, would continue to meet the planning standards of 10 CFR 50.47(b) and the requirements of Appendix E to 10 CFR Part 50.
Please be reminded that 10 CFR 50.54(q) requires that proposed changes which decrease the effectiveness of your Emergency Plan shall not be implemented without application to and approval by the Commission. However, changes may be made without Commission approval if such changes do not-decrease the effectiveness of the Plan, and the Plan, as changed, conti.1ues to meet the standards of 10 CFR 50.47(b) and the requirements.of Appendix E to 10 CFR Part 50.
If a change is made without approval, you should furnish copies in accordance with 10 CFR 50.54(q). Also, any changes to the Emergency Plan Implementing Procedures should be made in accordance with the requirements of Appendix E to 10 CFR Part.50.
Should you have any questions regarding this letter, please contact Mr. Kenneth P. Barr of our staff at (404) 331-0335.
Sincerely,
..C.;!.:L w.a w
'iLU/11 E. CUN E William E. Cline, Chief Radiological Protection and Emergency Preparedness Branch Division of Radiation Safety and Safeguards cc:
(See page 2)
\\
0 9309280135 930914 7QQ$0 PDR ADOCK 05000302 fhh.
F PDR
F 3
Florida Power Corporation 2
. 'cc :
Gary L. Boldt i
Vice President, Nuclear Production Florida Power Corporation
-P. O. Box 219-SA-2C Crystal River, FL 34423-0219 B. J. Hickle, Director i
Nuclear Plant Operations Florida Power Corporation P. O. Box 219-NA-2C Crystal River, FL 34423-0219 R. C. Widell, Director Nuclear Operations Site. Support Florida Power Corporation P. O. Box 219-NA-21 Crystal River, FL 34423-0219 Gerald A. Williams Corporate Counsel Florida Power Corporation MAC - ASA P. O. Box 14042 St. Petersburg, FL 33733 Attorney General Department of Legal Affairs
+
The Capitol Tallahassee, FL 32304 Bill Passetti Office of Radiation Control Department of Health and Rehabilitative Services 1317 Winewood Boulevard Tallahassee, FL 32399-0700 l
Administrator Department of Environmental Regulation Power Plant Siting Section State of Florida 2600 Blair Stone Road 1
Tallahassee, FL 32301
' Joe Myers, Director Division of Emergency Preparedness Department of Community Affairs 2740 Centerview Drive Tallahassee, FL -32399-2100 cc:
(Cont'd on page 3)
i A
l Florida Power Corporation 3
(cc: cont'd)
Chairman l-l Board of County Commissioners Citrus County 110 N. Apopka Avenue Inverness, FL 36250 Robert B. Borsum B&W Nuclear Technologies 1700 Rockville Pike, Suite 525 Rockville, MD 20852-1631 bec:
K. Landis, RII l
Document Control Desk l
NRC Resident Inspector U.S. Nuclear Regulatory' Commission 6745 N. Tallahassee Road Crystal River, FL 34428 l
)
l i
l RI S
RI S-R AGooden
- arr Klandi:
1 4
l 9/8//93 9//Q'93 9 5 /93 l