ML20057C230
| ML20057C230 | |
| Person / Time | |
|---|---|
| Site: | Wolf Creek |
| Issue date: | 09/17/1993 |
| From: | Murray B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | |
| Shared Package | |
| ML20057C219 | List: |
| References | |
| 50-482-93-25, NUDOCS 9309280100 | |
| Download: ML20057C230 (4) | |
See also: IR 05000482/1993025
Text
,
b
DOCUMENT CONTAINS
'
SAFEGUARDS INFORMATION
A
APPENDIX B
U.S. NUCLEAR REGULATORY COMMISSION
REGION IV
NRC Inspection Report:
50-482/93-25
Operating License No.: NPF-42
Docket:
50-482
Licensee: Wolf Creek Nuclear Operating Corporation
P. O. Box 411
Burlington, Kansas 66839
Facility Name: Wolf Creek Generating Station
Inspection At:
Burlington, Kansas
Inspection Conducted: August 23-27, 1993
Inspector:
T. W. Dexter, Senior Physical Security Specialist
Facilities Inspection Programs Section
Approved:
illt oONI LAAll A
.!/ h
B. Murray, Chi M , Fa ' ities Inspection
Date #
~
Programs Section
Inspection Summary
Areas Inspected: Routine, announced inspection of manageinent support,
management effectiveness, records and reports, testing and maintenance,
assessment aids, compensatory measures, protective area barrier, security
plans and procedures, one fitness-for-duty issue, and one access authorization
-
issue.
Results:
Management support for the security program was evident and demonstrated
the intent of senior management to support and maintain a high quality
program (Section 1.1).
DOCUMENT CONTAINS
ENCLOSURE CONTAINS
SAFEGUARDS INFORMATION
SAFEGUARDS INFORMATION
UPON SEPARATION THIS
PAGE IS DECONTROLLED
9309280100 930921
ADDCK 05000482
G
-
i
-2-
DOCUMENT CONTAINS
SAFEGUARDS INFORMATION
The security program was managed by a highly qualified staff. The
k
morale of the security force was very good (Section 1.2).
The security staff was correctly reporting security events as required
by regulations. Personnel were knowledgeable of procedures and
reporting requirements (Section 1.3).
The protected and vital area barriers and isolation zones were
effectively maintained (Section 1.4).
High quality implementing procedures were maintained. The annual
security program audit was comprehensive and performance oriented.
Responses by security management to findings were timely and correct
(Section 1.5).
Implementation of compensatory measures was very good.
Because of the
timely repairs of equipment, compensatory posting did not adversely
impact the morale or overtime of the security force (Section 1.6).
Assessment aids were excellent.
Instrumentation and controls
technicians repaired problems in a timely manner (Section 1.7).
Instrumentation and controls technicians provided exceptional service
support. An excellent testing and maintenance program was implemented
(Section 1.8).
A violation was identified involving access authorization for terminated
-
contract personnel.
Personnel were properly identified and their
authorization verified before a keycard was issued and access provided.
Searches of handcarried packages and material were properly conducted.
An Inspection Followup Item was identified involving continuous
behavioral observation for contractor personnel who remained on the
authorized unescorted access list (Section 1.9).
A good training program was being conducted and the results were
properly documented. Security officers were knowledgeable and
professional in performing their duties. Security drills were conducted
and well controlled (Section 1.10).
Summary of Inspection Findinas:
Violetion 482/9325-01 was opened (Section 1.9).
Inspection Followup Item 482/9325-02 was opened (Section 1.9))
i
'
DOCUMENT CONTAINS
ENCLOSURE CONTAINS
SAFEGUARDS INFORMATION
SAFEGui dS INFORMATION
UPON SisaRATION THIS
PAGE It JECONTROLLED
a
t..
-3-
DOCUMENT CONTAINS
SAFEGUARDS INFORMATION
i
Attachment:
Persons Contacted and Exit Meeting
I
P
!
6
DOCUMENT CONTAINS
ENCLOSURE CONTAINS
SAFEGUARDS INFORMATION
SAFEGUARDS INFORMATION
UPON SEPARATION THIS
PAGE IS DECONTROLLED
,
m
.
. . . .
.
. c-
-
-
-
r
,-
DOCUMENT CONTAINS
SAFEGUARDS INFORMATION
k
ATTACMENT
i
I PERSONS CONTACTED
i
'
1.1 Licensee Personnel
i
- 0. Maynard, Vice President, Plant Operations
.
- F. Rhodes, Vice President, Engineering
.
- R. Hagan, Vice President, Nuclear Assurance
- L. Anderson, Instrumentation and Controls Technician-
- R. Benedict, Manager, Quality Control
1
- M. Dingler, Manager, Nuclear. Power Engineering - Support-
.I
- D. Erbe, Supervisor, Security Operations
t
- R. Flannigan, Manager, Nuclear Safety Engineering
i
- B. Illing.-Director, Employee Services
- !
- J. Lutz, Regulatory Compliance Engineer
,
- M. Lutze, Security Coordinator
-
- K. Moles, Manager, Regulatory Services
!
- T. Riley, Supervisor, Regulatory Compliance
. ,
- C. Parry, Director, Performance Enhancement
- C. Sprout, Manager, Systems Engineering
'
- J. Weeks, Manager, Operations
l
- S. Wideman, Superviser, Licensing
!
1.2 NRC Personnel
i
- G. Pick, Senior Resident Inspector
i
- M. Satorius, Project Engineer
1
i
In addition to the personnel listed above, the inspector contacted other
!
personnel during this inspection period.
'!
!
- Denotes personnel that attended the exit meeting.
.
!
2 EXIT MEETING
,;
- i
An exit meeting was conducted on August 27, 1993. During this meeting, the
!
inspector reviewed the scope and findings of the report. The licensee did not
i
identify- as proprietary any information provided .to, or reviewed by, the
inspector.
.
I
DOCUMENT CONTAINS
ENCLOSURE CONTAINS
l
SAFEGUARDS INFORMATION
SAFEGUARDS INFORMATION
UPON SEPARATION THIS
PAGE IS DECONTROLLED
!
9
.:
i
.
.
.
.
-