ML20057B988

From kanterella
Jump to navigation Jump to search
Forwards 1993 Refueling Outage SG Tube Insp Rept, Per TS 4.4.5.5(b)
ML20057B988
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 09/15/1993
From: Stetz J
CONNECTICUT YANKEE ATOMIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20057B989 List:
References
NUDOCS 9309240251
Download: ML20057B988 (1)


Text

..

(

d CONNECTICUT YANKEE ATOMIC POWER COMPANY.

HADDAM NECK PLANT 362 INJUN HOLLOW ROAD e EAST HAMPTON, CT 06424-3099 1

September 15,1993 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Re: Technical SpeciGeation 6.9.2 Docket 50-213 Haddam Neck Plant 1993 Steam Generator Tube Inspection Report Connecticut Yankee Atomic Power Company Technical Speci0 cation 4.4.5.5(b) requires that complete results of the steam generator tube Inservice Inspection be reported to the Commission within 90 days following the completion of the inspection.

The results of the inspection are attached.

Very truly yours, CONNECTICUT YANKEE ATOMIC POWER CO.

I chn P. Stetz Vice Pn'sident J

Haddam Neck Plant i

Attachment:

Steam Generator Tube Inspection Report cc: Mr. Thomas T. Martin Regional Administrator, Region I j

475 Allendale Road King of Prussia, PA 19406 William Raymond q

Sr. Resident Inspector 1

Iladdam Neck 230045

/

I g 'r 1028 3 7tEV 2 91 9309240251 930915 h

1 PDR ADOCK 05000213' 5 0

PDR 0-

-. ;