Forwards Insp Rept 50-461/93-10 on 930706-0803 & Notice of Violation.Expresses Concern W/Apparent Lack of Rigor in Evaluating Damage to RHR Sys Pipe Restraint & Impact on Sys Operability
ML20057B806
Person / Time
Site: Clinton 
Issue date: 09/17/1993
From: Forney W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Jamila Perry
ILLINOIS POWER CO.
Shared Package
ML20057B807 List:
References
NUDOCS 9309240028
Download: ML20057B806 (3)


See also: IR 05000461/1993010

Text

F

  • 1

' #

p asse

UNI T E D STATES

%,

NUCLEAR HEGULATORY COMMisstON

i

g(

REGION 111

5

f

799 HOOSEVELT HO AD

g

CLE N E LLYN, ILLINOIS 60137

        • '

SEP 171993

Docket No. 50-461

Illinois Power Company

ATTN:

Mr. J. S. Perry

Senior Vice President

Clinton Power Station

Mail Code V-275

P. O. Box 678

Clinton, IL 61727

Dear Mr. Perry:

This letter refers to the inspection conducted by Mr. H. A. Walker and others

of this office from July 6 through August 3,1993, and further discussions at

a meeting in Region 111 on August 24, 1993. The inspection included a review

of authorized activities for your Clinton Power Station. At the conclusion of

the inspection, the findings were discussed with those members of your staff

identified in the enclosed report.

Areas examined during the inspection are identified in the report.

Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel and observation of

activities in progress. The purpose of the inspection was to determine

whether activities authorized by the license were conducted safely and in

accordance with NRC requirements.

The inspection verified that engineering activities at Clinton Station were

being conducted safely and in accordance with NRC requirement.

The inspection

team also concluded that engineering and technical support function

performance was good with improvements noted over our last engineering and

technical support inspection.

While improvements were observed, we are concerned with the apparent lack of

rigor in evaluating damage to residual heat removal system pipe restraints and

their impact on system operability.

In your safety assessment, the RHR

restraint problems were individually considered minor; however, the number of

restraint damage problems combined with the damage found in the same areas,

indicated these problems may have been significant.

Based on this inspection's results, certain of your activities appeared to be

in violation of NRC requirements, as specified in the enclosed Notice of

Violation (Notice). The violation is of concern because the failure to

determine and correct the cause of the RHR pipe support damage could result in

similar and more significant failures.

9309240028 930917

PDR

ADOCK 05000461

l

G

PDR

l

kub/[C-Z Q

8

Illinois Power Company

2

SEP 171993

You are required to respond to this letter and should follow the instructions

specified in the enclosed Notice when preparing your response.

In responding

to the corrective action violations, please address the above described

corrective action concerns.

In your response, you should document the

specific actions taken and any additional actions you plan to take to prevent

recurrence.

After reviewing your response to this Notice, including your

proposed corrective actions and the results of future inspections, the NRC

will determine whether further NRC enforcement action is necessary to ensure

compliance with NRC regulatory requirements.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter, the enclosures, and your response to this letter will be placed

in the NRC Public Document Room.

The responses directed by this letter and the accompanying Notice are not

,

subject to the clearance procedures of the Office of Management and Budget as

required by the Paperwork Reduction Act of 1980, PL 96-511.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

LdbE L *

William L. Forne ,

ctingDk

or

Division of Reactor Safety

Enclosures:

1.

Notice of Violation

2.

Inspection Report

No. 50-461/93010(DRS)

See Attached Distribution

a

v-

.'

..-i

!

Illinois Power Company

3

SEP 171993

l

Distribution

cc w/ enclosures:

!

J. Cook, Vice President

i

and Manager, Clinton

!

Power Station

R. F. Phares, Director -

Licensing

i

OC/LFDCB

Resident Inspector, RIII

~

D. Pickett, LPM, NRR

J. W. McCaffrey, Chief, Public

,

Utilities Division

Ms. K. K. Berry, Licensing Services

Manager, General Electric Company

Chairman, DeWitt County Board

. Illinois Department of Nuclear

Safety

Robert Newmann, Office of Public

Counsel, State of Illinois

State Liaison Officer

Chairman, Illinois Commerce

Commission

,