Forwards Rev 13 of Technical Requirements Manual
ML20057B132
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 09/14/1993
From: William Cahill
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20057B133 List:
References
TXX-93327, NUDOCS 9309200021
Download: ML20057B132 (5)


Text

- _-_ -. .. . -.

_ )

. j F% Log # TXX-93327 File # 10010

)

r r 916 (TRM) l 7UELECTRIC Ref. # 10CFR50.36 i September 14. 1993  ;

William J. Cahill, Jr.

Group \'we (*rrsident t

1 i

U. S. Nuclear Regulatory Commission Attn: Document Control Desk i Washington, DC 20555 SU2JiCT: COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 TRANSMITTAL OF TECHNICAL REQUIREMENTS MANUAL (TRM)

REVISION 13 Gentlemen:

TV Electric herewith submits Revision 13 (enclosed) of the CPSES Technical Requirements Manual (TRM). ' Enclosed are the following documents:

, Technical Requirements Manual 1 signed original Revision 13 and 10 copies The attachment contains a page-by-page description of the changes. As has been the TU Electric practice in the past several TRM revisions, all changes described in the attachment have been evaluated for relative significance, In addition, all changes applicable to CPSES Units 1 and 2 have been reviewed under the TV Electric 10CFR50.59 process and found not to include any "unreviewed safety questions".

TRM Revision 13 is being issued on September 14, 1993, and will become effective at 8: 00 a.m. on September 14, 1993.

kON

'\

170057 9309200021 930914 PDR ADOCK 05000445 A'4 7 400 N. Obve street LB. 81 Dallas, Texas 75201 P PDR s id

L l

TXX-93327 Page 2 of 2 i If you should have any questions, please contact Mr. Roy Cisneros at (214) 812-8814. '

1 Sincerely, i

l William J. Cahill. Jr.

By:

J. S. Marshall Generic Licensing Manager ,

i RC/gjh I l

Attachment Enclosure c - Mr. J. L. Milhoan, Region IV Resident Inspectors, CPSES (2) i Mr. T. A. Bergman, NRR  !

Mr. B. E. Holian, NRR 1

l 1

l l

l l

l l

l l

1 1

Attachment to TXX-93327 September 14, 1993 Page 1 of 2 i

CPSES - TECHNICAL REQUIREMENTS MANUAL (TRM)

AMENDMENT / REVISION 13 DETAILED DESCRIPTION Prefix Page (as amended) Group Description 4-8 4 Removes Breaker Type THFK from the surveillance requirements for breakers in Panel 1EB1-2.

Editorial  :

This is a minor editorial correction to reflect the correct breaker types for surveillance applicable in the plant.

Change Request Number  : TR-93-11.5 Commitment Register Number :

Related SER . SSER -

SER/SSER Impact . No 4-8 2 See Sheet No(s) :14 Deletes from surveillance requirements, Breakers ISCCP1, IEB4-1 and BT-1EB24 pertaining to the containment polar crane power supply. Adds to surveillance requirements, primary and backup breakers in Panel Board IB11-1-1 pertaining to the Containment Polar Crane (CP1-MESCCP-01) power supply.

Revision  :

The Containment Polar Crane CP1-MESCCP-01 power supply is being moved from switchgear IEB4 to Plant Support Power System Panel Board IB11-1-1. The Plant Support Porer System is available during outage periods to upport the operation of the containment polar crane required to continue lifting and moving components in the containment. Other power sources are occasionally required to be out of service to support outage activities, Change Request Number  : TR-93-11.1 Commitment Register Number :

Related SER : 8.3 SSER :22 SER/SSER Impact  : No 4-9 2 See Sheet No(s) :10 and 14 Deletes from surveillance requirements, breakers pertaining to the Fuel Manipulator Crane, Fuel Transfer System Reactor Side Control Panel for  !

TBX-FHSTTS-02 and Containment Lighting Transformer '

XFMR-14 in MCC 1EB1-2. Adds to surveillance i requirements, primary and backup breakers in Panel Board li'l-1-2 pertaining to the manipulator crane (TBX-FHL JC-01), Fuel Transfer System Reactor Side Control Panel for TBX-FHSTTS-02 and Containment Lighting Transformer CP1-ELTRNT-14 power supplies.

Revision  :

The Fuel Manipulator Crane / Fuel Transfer System Reactor Side Control Panel / Containment Lighting

Attachm.ent to TXX-93327 S6ptember 14, 1993 Page 2 of 2 Prefix Page (a1 amended) Group DescriDtion Transformer are being moved from the power supply of MCC IEB1-2 to Plant Support Power System Panel Board 1B11-1-2. the Plant Support Power System is considered more reliable in outage situations and is not susceptible to being shut down during refueling ,

operations.  !

Change Request Number  : TR-93-11.2 Commitment Register Number :

Related SER : 8.3 SSER :22 SER/SSER 1mpact  : No 4-10 2 Removes Breaker Type THFK from the surveillance requirements from breakers in Panel IEB1-2.

Revision  :

The Containment Welding Receptacle Panel is being moved from the power supply of MCC 1EB2-2 to Plant Support Power system Panel Board 1B11-1-1. THFK type breaker is no longer in use and surveillance is not required.

Change Request Number  : TR-93-11.4 Commitment Register Number -

Related SER : 8.3 SSER :22 i SER/SSER Impact . No 4-11 2 See Sheet No(s) :14 Deletes from surveillance requirements breakers pertaining to Containment Elevator -01 and Distribution Panel 1EB2-2-1 in MCC IEB2-2. Adds to surveillance requirements, primary and backup breakers in Panel Board IB11-1-1 pertaining to Containment Elevator (CPI-MEELRB-01) and Welding  ;

Receptacles Distribution Panel IEB11-1-1-1 (CPI-EPDPNB-24).

Revision  :

The Containment Elevator / Containment Welding Receptacle panels are being moved from the power supply of MCC 1EB2-2 to Plant Support Power System Panel Board IB11-1-1. The Plant Support Power System is considered mure reliable in outage situations and is not susceptible to being shutdown during refueling operations.

Change Request Number  : TR-93-11.3 Commitment Register Number :

Related SER : 8.3 SSER :22 SER/SSER Impact  : No ,

1 t

COMANCHE PEAK STEAM ELECTRIC STATION UNITS 1 & 2 TECHNICAL REQUIREMENTS MANUAL (TRM) l INSTRUCTION SHEET (Page 1 of 1)  ;

1 The following instructional information and checklist is being furnished to help insert Revision 13 into the Comanche Peak Steam Electric Station TRM. A description of this revision is provided in TXX-93327, dated September 14, 1993.

Discard the old sheets and insert the new sheets, as listed below. Keep all instruction sheets in the front of the Effective Page Listing to serve as a record of changes.

Remove Insert Section 4 4-8 thru 4-14 4-8 thru 4-14 '

List of Effective Pages  !

EPL-1 thru EPL-4 EPL-1 thru EPL-4 t

8

?

i i

3 l '

l l

l i