Submits Partially Withheld Physical Security Insp Repts 50-010/93-03,50-237/93-25 & 50-249/93-25 on 930825 & 30.One Violation Noted & Being Considered for Escalated Enforcement Action
ML20057B047
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 09/09/1993
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Delgeorge L
COMMONWEALTH EDISON CO.
Shared Package
ML20057B048 List:
References
EA-93-223, NUDOCS 9309170100
Download: ML20057B047 (4)


See also: IR 05000010/1993003

Text

D2&\\ DN

~

6

.

.

SEP 0 91993

J

Docket No. 50-10

,

Docket No. 50-237

Docket No. 50-249

EA 93-223

Commonwealth Edison Company

ATTN: Mr. L. O. DelGeorge, Vice President

Nuclear Oversight and

Regulatory Services

Executive Towers West III

1400 Opus Place, Suite 300

Downers Grove, IL 60515

Dear Mr. DelGeorge:

SUBJECT:

DRESDEN REACTIVE PHYSICAL SECURITY INSPECTION

This refers to the inspection conducted by Mr. T. J. Madeda of this office on

August 2.5 and 30, 1993. The inspection included a review of activities

authorized for your Dresden Nuclear Power Station, Units 1, 2 and 3.

At the

conclusion of the onsite inspection, the findings were discussed with those

members of your staff identified in the enclosed report.

Areas examined during the inspection are identified in the report.

Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

activities in progress specifically involving your access control program for

hand-carried packages and protected area security barrier requirements.

The

purpose of the inspection was to determine whether activities authorized by

your license were conducted safely and in accordance with NRC requirements.

Based on the results of this inspection, one apparent violation was identified

and is being considered for escalated enforcement action in accordance with

the " General Statement of Policy and Procedure for NRC Enforcement Actions"

(Enforcement Policy), 10 CFR Part 2, Appendix C.

The apparent violation

involved an inadequately conducted search at an access control point that

resulted in the introduction of a facsimile of an unauthorized item into the

protected area. Accordingly, no Notice of Violation is presently being issued

for this inspection finding.

In addition, please be advised that the

characterization of the apparent violation described in the enclosed

inspection report may change as a result of further NRC review.

An enforcement conference to discuss this apparent violation has been

scheduled for 9:00 a.m. on September 16, 1993. The decision to hold an

enforcement conference does not mean that the NRC has deter ined that a

'

l g Enclosuro Contnitis

9309170100 930909

b

Upon Separation This

PDR

ADOCK 05000010 kg

i

()y hce Is Dooontrolled

G

PDR

u

-&-ps

.

.

semsmummuumus

-

. Commonwealth Edison Company

2

m 0 01993

violation has occurred or that enforcement action will be taken. The purposes

of this conference are to discuss the apparent violation, its cause and safety

l

significance; to provide you the opportunity to point out any errors in our

inspection report; and to provide an opportunity for you to present your

i

proposed corrective action.

In addition, this is an opportunity for you to

provide any information concerning your perspectives on I) the severity of the

violation, 2) the application of the factors that the NRC considers when it

determines the amount of a civil penalty that may be assessed in accordance

with Section VI.B.2 of the Enforcement Policy, and 3) any other application of

the Enforcement Policy to this case, including the exercise of discretion in

accordance with Section VII. You will be advised by separate correspondence

of the results of our deliberations on this matter.

No response regarding the

apparent violation is required at this time.

The material enclosed herewith contains Safeguards Information as defined by

10 CFR Part 73.21 and its disclosure to unauthorized individuals is prohibited

by Section 147 of the Atomic Energy Act of 1954, as amended.

Therefore, the

i

material will not be placed in the Public Document Room.

l

Sincerely,

,

i

'

critti. s"itr r3 CW'LG E @RGr

Charles E. Norelius, Director

,

Division of Radiation Safety

and Safeguards

i

Enclosure:

Inspection Reports

No. 50-10/93003(DRSS);

No. 50-237/93025(DRSS);

No. 50-249/93025(DRSS)

(SAFEGUARDS INFORMATION)

See Attached Distribution

1

1

see attached concurrence sheet

RIII

RIII

RIII

RIII

RIII

RIII

l

Madeda/sd

Creed

Snell

Hiland

Weil

Norelius

l

09/ /93

!

Enclosure Conta1-

SAFBCUARDS IEr0iM TION

U;xm Separation This

Page In Dooontrolled

!

_

_ _ _ _ _

l

l

~

.

'

Commonwealth Edison Company

3

g

Distribution

cc w/ enclosure:

M. D. Lyster, Site Vice President

G. F. Spedl, Station Manager

i

J. Shields, Regulatory Assurance

,

Supervisor

D. Farrar, Nuclear Regulatory

i

'

Services Manager

NRR/DRIS/RSGB90

1

[

NMSS/HIGDON/4E4

'

OE Director

cc w/ enclosures, w/o

i

SAFEGUARDS INFORMATION-

OC/LFDCB

Resident Inspectors LaSalle,

1

,

'

Dresden, Quad Cities

Richard Hubbard

J. W. McCaffrey, Chief, Public

Utilities Division

,

l

Robert Newmann, Office of Public

!

Counsel

Licensing Project Manager, NRR

State Liaison Officer

Chairman, Illinois Commerce

Commission

H. J. Miller, RIII

T. O. Martin, RIII

J. E. Dyer, NRR

M. L. Jordan, RIII

C. D. Pederson, RIII

S. Stasek, SRI, Davis-Besse

l

,s(.W

l

.II

RIII

RIII

RI

RIII

R II

'f

ded /sd

eed

Hi an

1

us

akin

4/4y

gg

g

l

09/g 93

c jgp

z

sh e

Enclosure Contains

SAIT30ARDS INFORMATI0E

Upon Separation Thia

Page la Deoontrolled

l

i

.

ummmmmaammems

-

-

. Commonwealth Edison Company

3

SEP 00 W

!

Distribution

i

l

l

cc w/ enclosure:

M. D. Lyster, Site Vice President

G. F. Spedl, Station Manager

l

J. Shields, Regulatory Assurance

i

Supervisor

l

D. Farrar, Nuclear Regulatory

Services Manager

NRR/DRIS/RSGB90

NMSS/HIGDON/4E4

OE Director

l

cc w/ enclosures, w/o

'

SAFEGUARDS INFORMATION:

OC/LFDCB

Resident Inspectors LaSalle,

Dresden, Quad Cities

Richard Hubbard

J. W. McCaffrey, Chief, Public

'

Utilities Division

Robert Newmann, Office of Public

Counsel

Licensing Project Manager, NRR

State Liaison Officer

Chairman, Illinois Commerce

Commission

J. Lieberman, OE

J. Goldberg, 0GC

J. Partlow, NRR

H. J. Miller, RIII

T. O. Martin, RIII

J. E. Dyer, NRR

M. L. Jordan, RIII

C. D. Pederson, RIII

S. Stasek, SRI, Davis-Besse

Enclosure Contni'

SAFBGUARDS IliFOLGT10F

Upon Soparation TMa

P. age Io Dcoontrolled

.