Text
D2&\\ DN
~
6
.
.
SEP 0 91993
J
Docket No. 50-10
,
Docket No. 50-237
Docket No. 50-249
EA 93-223
Commonwealth Edison Company
ATTN: Mr. L. O. DelGeorge, Vice President
Nuclear Oversight and
Regulatory Services
Executive Towers West III
1400 Opus Place, Suite 300
Downers Grove, IL 60515
Dear Mr. DelGeorge:
SUBJECT:
DRESDEN REACTIVE PHYSICAL SECURITY INSPECTION
This refers to the inspection conducted by Mr. T. J. Madeda of this office on
August 2.5 and 30, 1993. The inspection included a review of activities
authorized for your Dresden Nuclear Power Station, Units 1, 2 and 3.
At the
conclusion of the onsite inspection, the findings were discussed with those
members of your staff identified in the enclosed report.
Areas examined during the inspection are identified in the report.
Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observation of
activities in progress specifically involving your access control program for
hand-carried packages and protected area security barrier requirements.
The
purpose of the inspection was to determine whether activities authorized by
your license were conducted safely and in accordance with NRC requirements.
Based on the results of this inspection, one apparent violation was identified
and is being considered for escalated enforcement action in accordance with
the " General Statement of Policy and Procedure for NRC Enforcement Actions"
(Enforcement Policy), 10 CFR Part 2, Appendix C.
The apparent violation
involved an inadequately conducted search at an access control point that
resulted in the introduction of a facsimile of an unauthorized item into the
protected area. Accordingly, no Notice of Violation is presently being issued
for this inspection finding.
In addition, please be advised that the
characterization of the apparent violation described in the enclosed
inspection report may change as a result of further NRC review.
An enforcement conference to discuss this apparent violation has been
scheduled for 9:00 a.m. on September 16, 1993. The decision to hold an
enforcement conference does not mean that the NRC has deter ined that a
'
l g Enclosuro Contnitis
9309170100 930909
b
Upon Separation This
ADOCK 05000010 kg
i
()y hce Is Dooontrolled
G
u
-&-ps
.
.
semsmummuumus
-
. Commonwealth Edison Company
2
m 0 01993
violation has occurred or that enforcement action will be taken. The purposes
of this conference are to discuss the apparent violation, its cause and safety
l
significance; to provide you the opportunity to point out any errors in our
inspection report; and to provide an opportunity for you to present your
i
proposed corrective action.
In addition, this is an opportunity for you to
provide any information concerning your perspectives on I) the severity of the
violation, 2) the application of the factors that the NRC considers when it
determines the amount of a civil penalty that may be assessed in accordance
with Section VI.B.2 of the Enforcement Policy, and 3) any other application of
the Enforcement Policy to this case, including the exercise of discretion in
accordance with Section VII. You will be advised by separate correspondence
of the results of our deliberations on this matter.
No response regarding the
apparent violation is required at this time.
The material enclosed herewith contains Safeguards Information as defined by
10 CFR Part 73.21 and its disclosure to unauthorized individuals is prohibited
by Section 147 of the Atomic Energy Act of 1954, as amended.
Therefore, the
i
material will not be placed in the Public Document Room.
l
Sincerely,
,
i
'
critti. s"itr r3 CW'LG E @RGr
Charles E. Norelius, Director
,
Division of Radiation Safety
and Safeguards
i
Enclosure:
Inspection Reports
No. 50-10/93003(DRSS);
No. 50-237/93025(DRSS);
No. 50-249/93025(DRSS)
(SAFEGUARDS INFORMATION)
See Attached Distribution
1
1
see attached concurrence sheet
RIII
RIII
RIII
RIII
RIII
RIII
l
Madeda/sd
Creed
Snell
Hiland
Weil
Norelius
l
09/ /93
!
Enclosure Conta1-
SAFBCUARDS IEr0iM TION
U;xm Separation This
Page In Dooontrolled
!
_
_ _ _ _ _
l
l
~
.
'
Commonwealth Edison Company
3
g
Distribution
cc w/ enclosure:
M. D. Lyster, Site Vice President
G. F. Spedl, Station Manager
i
J. Shields, Regulatory Assurance
,
Supervisor
D. Farrar, Nuclear Regulatory
i
'
Services Manager
NRR/DRIS/RSGB90
1
[
NMSS/HIGDON/4E4
'
OE Director
cc w/ enclosures, w/o
i
SAFEGUARDS INFORMATION-
OC/LFDCB
Resident Inspectors LaSalle,
1
,
'
Dresden, Quad Cities
Richard Hubbard
J. W. McCaffrey, Chief, Public
Utilities Division
,
l
Robert Newmann, Office of Public
!
Counsel
Licensing Project Manager, NRR
State Liaison Officer
Chairman, Illinois Commerce
Commission
H. J. Miller, RIII
T. O. Martin, RIII
J. E. Dyer, NRR
M. L. Jordan, RIII
C. D. Pederson, RIII
S. Stasek, SRI, Davis-Besse
l
,s(.W
l
.II
RIII
RIII
RI
RIII
R II
'f
ded /sd
eed
Hi an
1
us
akin
4/4y
gg
g
l
09/g 93
c jgp
z
sh e
Enclosure Contains
SAIT30ARDS INFORMATI0E
Upon Separation Thia
Page la Deoontrolled
l
i
.
ummmmmaammems
-
-
. Commonwealth Edison Company
3
SEP 00 W
!
Distribution
i
l
l
cc w/ enclosure:
M. D. Lyster, Site Vice President
G. F. Spedl, Station Manager
l
J. Shields, Regulatory Assurance
i
Supervisor
l
D. Farrar, Nuclear Regulatory
Services Manager
NRR/DRIS/RSGB90
NMSS/HIGDON/4E4
OE Director
l
cc w/ enclosures, w/o
'
SAFEGUARDS INFORMATION:
OC/LFDCB
Resident Inspectors LaSalle,
Dresden, Quad Cities
Richard Hubbard
J. W. McCaffrey, Chief, Public
'
Utilities Division
Robert Newmann, Office of Public
Counsel
Licensing Project Manager, NRR
State Liaison Officer
Chairman, Illinois Commerce
Commission
J. Lieberman, OE
J. Goldberg, 0GC
J. Partlow, NRR
H. J. Miller, RIII
T. O. Martin, RIII
J. E. Dyer, NRR
M. L. Jordan, RIII
C. D. Pederson, RIII
S. Stasek, SRI, Davis-Besse
Enclosure Contni'
SAFBGUARDS IliFOLGT10F
Upon Soparation TMa
P. age Io Dcoontrolled
.