Monthly Operating Rept for Aug 1993 for Callaway Plant,Unit 1
ML20057A935
Person / Time
Site: Callaway Ameren icon.png
Issue date: 08/31/1993
From: Blosser J, Mcinvale J
UNION ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
ULNRC-2849, NUDOCS 9309160228
Download: ML20057A935 (6)


Text

<

Cahawy P.orrt Post owe bus 620 fuitar M.escun E5251 l September 10,1993 I

Uvmv i ELECTRIC '

E3 Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 ULNRC-2849 )

Dear Sir:

DOCKET NUMBER 50-183 CALLAWAY PLANT UNIT I FACILITY OPEP ATING LICENSE NPF-30 MONTHI's UPERATING REPORT AUGUST.1993 The enclosed Monthly Operating Report for August,1993 is submitted pursuant to section 6.9.1.8 of the Callaway Unit 1 Technical Specifications.

'1 I

d' J. D. Blosser  ;

, Manager, Callaway Plant hy v p ,;%A' JDB/DEY/JA 1/ TAM /JBM/a l s' j Enclosure 1 I

cc: Distribution attached i

j

.e 1 9309160228 930831 PDR .ADOCK 05000483 R PDR

%e t* .

/

y

/ s

.[

i i I!1

i' cc distribution for ULNRC-2849 with enclosures Mr. I. N. Jackiw, Chief Reactor Projects Section 3C U.S. Nuclear Regulatory Commission Region III <

799 Roosevelt Road Glen Ellyn,IL 60137 Mr. L. R. Wharton (2 copies)

Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission i While Flint, North, Mail Stop 13E21 1155 Rockville,MD 20852 NRC Resident inspector Manager, Electric Department

'~

Missouri Public Scrsice Commission P.O. Box 360 Jefferson City, MO 65102 P

- g -,-----y-w - , ,

. ...,,. - - -v ++

t e

DOCKET NO. 50-483 UNIT NAME CALLAWAY UNIT 1 DATE 9 10-93 COMPLETED BY J. B. Mcinvale TELEPHONE 314/676-8247 PART A OPERATIONS

SUMMARY

The plant operated at approximately 100% power for the entire month.

PART B PORV AND SAFETY VALVE

SUMMARY

I None

?

6 Page 1 of 4

l PART C AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 50-483 UNIT Callaway Unit 1 DATE 9-10-93 COMPLETED BY J. B. McInvale TELEPIIONE 314/676-8247 MONTit AUGUST 1993 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-Nc0 DAY (MWe-Ne0 1 1130 17 1090' 2 1141 18 lofd 3 1142 19 1104

,-- 4 1149 20 1.12L 5 1149 21 1139 6 1150 22 1116 7 1150 23 1117 8 1143 24 1121 9 1128 25 1103 10 1132 26 1095 11 1130 _

27 1108 12 1132 28 1120 13 1130 29 1114 14 1129 .30 1113 15 1095 31 1130 16 1078 l

Page 2 of 4

. _ ~ ~ __ _. ._. __ . _. _ -

PART D OPERATING DATA REPORT DOCKET NO. 50-483 UNIT NAME CALLAWAY UNIT 1 DATE 9 10-93 COMPLETED BY J. B. McInvale TELEPHONE 314/676-8247 OPERATING STARJS (YTD) (CUM)

1. REPORTING PERIOD: AUGUST 1993 GROSS IlOURS IN REPORTING PERIOD: 744 5,831 76,236.5 2 CURRENTLY AlfrilORIZED POWER LEVEL (MWt): 3565 MAX. DEPEND. CAPACITY (MWe-Net): 1120 DESIGN ELECTRICAL RATING (MWe-Net): 1171
3. POWER LEVELTO WlIlCil RES1RICTED(IF ANY)(MWe-Net):
4. REASONS FOR RESTRICTION (IF ANY):

Tills MONT11 YR TO DATE CUMULATIVE

5. NUM11ER OFIIOURS REACTOR WAS CRITICAL 744.0 5,831.0 67,208.7
6. REACTOR RESERVE SIIUTDOWN llOURS 0 0 0
7. IlOURS GENERAlOR ON LINE 744.0 5,831.0 65,886.7
8. UNIT RFSERVE SIIUTDOWN llOURS... 0 0 0-
9. GROSS TIIERM AL ENERGY GENERATED (MWlO... 2,609,724 20,352,317 221,432,267
10. GROSS ELECTRICAL ENERGY GENERATED (MWil)... 875,506 6,959,231 75,521,127
11. NET ELECTRICAL ENERGY GENERATED (MWlO 835,246 6,642,530 71,816,628
12. REACTOR SERVICE FACTOR - 100.0 100.0 88.2

.A REACTOR AVAILAI31LITY FACTOR 100.0 100.0 88.2 1A UNIT SERVICE FACTOR _ 100.0 100.0 - 86.4 ,

13. UNIT AVAILAllllIlY FACTOR 100.0 100.0 86.4
16. UNIT CAPACITY FACTOR (Using MDC).- 100.2 101.7 84.1 -
17. UNIT CAPACrlY FACTOR (Using Design MWe).... 95.9 97.3 80.4 18 UNIT FORCED OUTAGE RATE 0.0 0.0 2.60
19. SillTTDOWNS SCilEDULED OVER NEXT 6 MONTlis (TYPE, DATE. AND DURATION OF EACil): Refueling; Datei 10/01/93 Duration: 56 days .
20. - IF SiRTF DOWN AT END OF REPORTlNO PERIOD ESTIMATE DATE OF STARTUP;

'l l

Page 3 of 4

.. - .- - ~

+ +

6 e t PART E UNIT SIIb7 DOWNS AND POWER REDUCTIONS -

~

DOCKET NO. 50-483 UNITNAME CALLAWAY UNTT I DATE 9-10-93 COMPLETED BY L B. Melavale TELEPIIONE 314/676-8247 REPORT MONT11: AUGUST 1993 -

METHOD OF TYPE SHbTITNG DOWN F: FORCED DURATION 11IE REACTOR OR

& DATE S: SCilEDULID OIOURS) REASON REDUCING POWER CORRECTIVE /ACTIONSCOMMENTS

SUMMARY

REASON METIIOD

. A: EQUIPMENT FAILURE (EXPLAIN) 1: MANUAL l Ik MAINT.ORTEST 2: MANUALSCRAM I C: kEIVEUNG 3: ALTTOMATIC SCRAM D- REGULATORY RESTR]CTION 4: OTIIER(EXPIAIh) .

E- OPERATORTRAINING AND UCENSE EXAMINATION F: ADMINISTRATION 0: OPERATIONALERROR(F.XPLMN)

II: OTIIER(EXPIALN)

Page 4 of 4