I Document Control Desk
]
~
I P
ATTACHMENT A Revised June 1993 Operating States SONGS Unit 3 Monthly Operating Report l
i i
I l
mor.aug/15 NRC MONTHLY OPERATING REPORT.
9309150231 930914 7i PDR ADOCK 05000361 f^'* Revised.dataisinBOLDType***
i l
R PDR L.;
I
i Document Control Desk i
DOCKET NO:
50-362 f
UNIT NAME:
SONGS - 3
{
DATE:
COMPLETED BY:
J. L. Darlina
-l TELEPHONE:: (714) 368-6223 i
OPERATING STATUS 1.
Unit Name:
San Onofre Nuclear Generatina Station. Unit 3' 2.
Reporting Period: July 1993 3.
Licensed Thermal Power (MWt):
3390 4.
Nameplate Rating (Gross MWe):
1127 5.
Design Electrical Rating (Net MWe):
1080 6.
Maximum Dependable Capacity (Gross MWe):
1127 7.
Maximum Dependable Capacity (Net MWe):
1080
.i 8.
If Changes Occur In Capacity Ratings (Items Number 3 Through 7)
Since Last Report, Give Reasons:
NA 9.
Power Level To Which Restricted, If Any (Net MWe):
NA i
10.
Reasons For Restrictions, If Any:
NA This Month Yr.-to-Date Cumulative 11.
Hours In Reporting Period 744.M 5.087.00 81.815.00 12.
Number Of Hours Reactor Was Critical 721.25 5.008.22 64.207.98 13.
Reactor Reserve Shutdown Hours 0.00 0.00 0.00 14.
Hours Generator On-Line 713.23 4.976.73-62.582.79 15.
Unit Reserve Shutdown Hours 0.00 0.00 0.00 16.
Gross Thermal Energy Generated (MWH) 2.359.461.23 16.472.641.40 201.106.715.64 l
17.
Gross Electrical Energy Generated (MWH) 791.709.50 5.628.205.50 68.255.065.50__
18.
Net Electrical Energy Generated (MWH) 750.434.00 5.346.266.00 64.491.936.36 19.
Unit Service Factor 95.88%
97.83%
76.49%
j 20.
Unit Availability Factor 95.88%
97.83%
76.49%-
l 21.
Unit Capacity Factor (Using MDC Net) 93.39%
97.31%
-72.99%
22.
Unit Capacity Factor (Using DER Net) 93.39%
97.31%
72.99%
23.
Unit Forced Outage Rate 4.14%.
2.17%
7.06%
24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
i Refuelina shutdown. October 9.1993, forecast duration 85 days.
25.
If Shutdown At End Of Report Period, Estimated Date of Startup:
NA 26.
Units In Test Status (Prior To Commercial Operation):
Forecast Achieved INITIAL CRITICALITY NA NA INITIAL ELECTRICITY NA NA COMMERCIAL OPERATION NA NA mor.aug/16
.,,.. - -