ML20057A611
| ML20057A611 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley |
| Issue date: | 09/03/1993 |
| From: | Bettenhausen L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Sieber J DUQUESNE LIGHT CO. |
| Shared Package | |
| ML20057A612 | List: |
| References | |
| NUDOCS 9309150038 | |
| Download: ML20057A611 (3) | |
See also: IR 05000334/1993019
Text
_ _ - - _ _ _ _ _ _ _ _ _ _ _ _
[)
_
~%-
m
-
.
.
31993
Docket No. 50-334
Mr. J. D. Sieber
Senior Vice President
Nuclear Power Division
Duquesne Light Company
Post Office Box 4
Shippingport, Pennsylvania 15077
Dear Mr. Sieber:
!
SUBJECT: REQUALIFICATION EXAMINATION REPORT NO. 50-334/93-19 (OL-RQ)
During the week of August 23,1993, the NRC administered requalification examinations to
10 employees of your company who operate the Beaver Valley 1 facility. The examination
addressed areas important to public health and safety and was conducted in accordance with
Revision 7 to NUREG-1021, " Operator Licensing Examiner Standards," ES-601 through
!
604. As 16 individuals were observed during the simulator portion of the examination, an
-
i
l
evaluation of your requalification program was made. Preliminary results were discussed at
l
an exit meeting held on August 26 with Mr. Chatfield, Mr. Freeland, and members of your
j
staff identified in the attachment to this letter.
'
The examination of the operators was conducted to determine if they would satisfy the
regulatory requirement of passing an NRC-administered examination prior to license renewal.
As evaluated by the NRC, all ten operators examined passed all portions of the
!
requalification examination. The four crews, comprised of 16 individuals, were evaluated as .
satisfactory on the simulator portion of the examination. As more than 12 individuals were
examined on the simulator and due to the 100% pass rate, we determined that your
requalification program retained its satisfactory rating.
'
During the simulator crew evaluation, your staff determined that one individual's
performance did not meet Duquesne Light Company's standards for operator performance.
The individual was a staff licer. sed Senior Reactor Operator, who performed during the
simulator examination only. We understand that a remediation plan is being prepared to
address this individual's performance deficiencies. Our assessment is that your program
acted properly in identifying the individual's performance problems and in developing an
appropriate remediation plan to address these problems.
1400g,
ly/hI
OFFICIAL RECORD COPY
G:BVl9319.ER
'
'
930915003B 930903
h"'
i
r
ADDCK 05000334
~
y
J
y\\
I
.
~
Mr. J. D. Sieber
2
3 1993
l
In accordance with 10 CFR 2.790 of 'he Commission's regulations, a copy of this letter and
the enclosure will be placed in the NRC Public Document Room.
Should you have any questions regarding this evaluation, please contact me at 215-337-5291.
Sincerely,
Od;0nd SDed Br
Lee H. Bettenbacea
Lee. H. Bettenhausen, Chief
Operations Branch
Division of Reactor Safety
l
Enclosure:
Requalification Program Evaluation Report No. 50-334/93-19 (OL-RQ)
w/ Attachments 1 and 2
i
Attachments:
1. Licensee Requalification Examination Report
l
'
Simulator Fidelity Repod
l
cc w/ encl; w/o Attachments 1 and 2:
'
,
G. S. Thomas, Vice President, Nuclear Services
!
D. E. Spoerry, Vice President, Nuclear Operations
L. R. Freeland, General Manager, Nuclear Operations Unit
!
K. D. Grada, Manager, Quality Service Unit
N. R. Tonet, Manager, Nuclear Safety Department
,
H. R. Caldwell, General Superintendent, Nuclear Operations
NRC Resident Inspector
Commonwealth of Pennsylvania
State of Ohio
cc w/ encl and Attachments 1 and 2:
T. W. Burns, Director, Nuclear Training
E. Chatfield, Training Manager
Public Document Room (PDR)
I.ocal Public Document Room (LPDR)
,
Nuclear Safety Information Center (NSIC)
OFFICIAL RECORD COPY
G:BVl9319.ER
,_ . - - - . - - -.
. . .
- _-
. - - . -
. .
.- .
- - _ _ _ ___ _
l
1
'
.
Mr. J. D. Sieber
3
31993
~
bec w/ encl; w/o Attachments 1 and 2:
l
R. Temps, Chief Examiner, DRS
Paul Bissett, DRS
j
Frank Jaggar, INEL
,
OL Facility File
bec w/ encl and Attachments 1 and 2:
Master Exam File
)
bec w/ encl; w/o Attachments 1 and 2:
Region I Docket Room (w/ concurrences)
l
SRI, Perry, Region III
l
l
'
bec w/ encl; w/o Attachments (VIA E-MAIL):
j
R. Gallo, Chief, OLB, NRR
W. Butler, NRR
G. Edison, NRR
V. McCree, OEDO
l
i
!
NOTIFY VIA E-MAIL AND NO ATTACHED FILE:
L. Bettenhausen, DRS
G. Meyer, DRS
,
i
R. Temps, DRS
P. Bissett, DRS
I
i
1
l
!
t
!
i
RI:DRS
RI:DRS
RI:DRS
l
Temps /dmg -
Meyer
Bet
hausen
09/02/93
[
09/p93
3
"
iOFFICIAL RECORD COPY
G:BV19319.ER
,
I
e
l
- . -
-
. - , - - .