Forwards Requalification Exam Rept 50-334/93-19(OL-RQ) Conducted During Week of 930823
ML20057A611
Person / Time
Site: Beaver Valley
Issue date: 09/03/1993
From: Bettenhausen L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Sieber J
DUQUESNE LIGHT CO.
Shared Package
ML20057A612 List:
References
NUDOCS 9309150038
Download: ML20057A611 (3)


See also: IR 05000334/1993019

Text

_ _ - - _ _ _ _ _ _ _ _ _ _ _ _

m

-

_

[)~%-

.

.

SEP 31993

Docket No. 50-334

Mr. J. D. Sieber

Senior Vice President

Nuclear Power Division

Duquesne Light Company

Post Office Box 4

Shippingport, Pennsylvania 15077

Dear Mr. Sieber: l

!

SUBJECT: REQUALIFICATION EXAMINATION REPORT NO. 50-334/93-19 (OL-RQ)

During the week of August 23,1993, the NRC administered requalification examinations to

10 employees of your company who operate the Beaver Valley 1 facility. The examination

addressed areas important to public health and safety and was conducted in accordance with

Revision 7 to NUREG-1021, " Operator Licensing Examiner Standards," ES-601 through  !

i

604. As 16 individuals were observed during the simulator portion of the examination, an -

l evaluation of your requalification program was made. Preliminary results were discussed at

l an exit meeting held on August 26 with Mr. Chatfield, Mr. Freeland, and members of your  ;

'

j staff identified in the attachment to this letter.

The examination of the operators was conducted to determine if they would satisfy the

regulatory requirement of passing an NRC-administered examination prior to license renewal.

As evaluated by the NRC, all ten operators examined passed all portions of the  !

requalification examination. The four crews, comprised of 16 individuals, were evaluated as .

satisfactory on the simulator portion of the examination. As more than 12 individuals were

examined on the simulator and due to the 100% pass rate, we determined that your

'

requalification program retained its satisfactory rating.

During the simulator crew evaluation, your staff determined that one individual's

performance did not meet Duquesne Light Company's standards for operator performance.

The individual was a staff licer. sed Senior Reactor Operator, who performed during the

simulator examination only. We understand that a remediation plan is being prepared to

address this individual's performance deficiencies. Our assessment is that your program

acted properly in identifying the individual's performance problems and in developing an

appropriate remediation plan to address these problems.

OFFICIAL RECORD COPY G:BVl9319.ER

1400g, ly/hI ' '

930915003B 930903 h"' i r ~

PDR ADDCK 05000334 y\

y PDR J

I

.

~

Mr. J. D. Sieber 2 SEP 3 1993

l

In accordance with 10 CFR 2.790 of 'he Commission's regulations, a copy of this letter and  !

the enclosure will be placed in the NRC Public Document Room.  !

I

Should you have any questions regarding this evaluation, please contact me at 215-337-5291.

Sincerely,

!

Od;0nd SDed Br

Lee H. Bettenbacea

Lee. H. Bettenhausen, Chief

Operations Branch

Division of Reactor Safety

l Enclosure:

Requalification Program Evaluation Report No. 50-334/93-19 (OL-RQ)

w/ Attachments 1 and 2

i

Attachments:

1. Licensee Requalification Examination Report

l ' Simulator Fidelity Repod

l

cc w/ encl; w/o Attachments 1 and 2:

'

,

G. S. Thomas, Vice President, Nuclear Services

!

D. E. Spoerry, Vice President, Nuclear Operations  ;

L. R. Freeland, General Manager, Nuclear Operations Unit  !

K. D. Grada, Manager, Quality Service Unit

,

N. R. Tonet, Manager, Nuclear Safety Department

H. R. Caldwell, General Superintendent, Nuclear Operations

NRC Resident Inspector

Commonwealth of Pennsylvania

State of Ohio

cc w/ encl and Attachments 1 and 2:

T. W. Burns, Director, Nuclear Training

E. Chatfield, Training Manager

Public Document Room (PDR)

,

I.ocal Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

OFFICIAL RECORD COPY G:BVl9319.ER

,_ . - - - . - - -. . . . - _- . - - . - . . .- . - - _ _ _ ___ _

l

l

1

'

.

~

Mr. J. D. Sieber 3 SEP 31993

bec w/ encl; w/o Attachments 1 and 2: l

R. Temps, Chief Examiner, DRS

Paul Bissett, DRS j

Frank Jaggar, INEL ,

OL Facility File

bec w/ encl and Attachments 1 and 2:

Master Exam File

bec w/ encl; w/o Attachments 1 and 2: )

Region I Docket Room (w/ concurrences) l

SRI, Perry, Region III l

l

'

bec w/ encl; w/o Attachments (VIA E-MAIL):

R. Gallo, Chief, OLB, NRR j

W. Butler, NRR

G. Edison, NRR  :

V. McCree, OEDO l

i

!

NOTIFY VIA E-MAIL AND NO ATTACHED FILE:

L. Bettenhausen, DRS

G. Meyer, DRS ,

i

R. Temps, DRS

P. Bissett, DRS

I

i

1

l

!

t

!

i

RI:DRS RI:DRS RI:DRS l

Temps /dmg - Meyer Bet hausen

09/02/93 [ 09/p93 3

"

i

OFFICIAL RECORD COPY G:BV19319.ER ,

I

e

l

- . - - . - , - - .