l 000 a areg k

1 i,l S

UNITED STATES I

2 is NUCLEAR REGULATORY COMMISSION l

k#' v,/

WASHiN GT ON, D.C. 205LW1 j

August 24, 1993 I

Docket No.

50-219 l

Mr. John J. Barton Vice President and Director l

GPU Nuclear Corporation Oyster Creek Nuclear Generating Station Post Office Box 388 Forked River, New Jersey 08731

Dear Mr. Barton:

l

SUBJECT:

SAFETY EVALUATION OF THE INSERVICE TESTING (IST) PROGRAM RELIEF REQUESTS FOR PUMPS AND VALVES, 0YSTER CREEK NUCLEAR GENERATING STATION (TAC N0. M85312)

The GPU Nuclear Corporation (GPUN) submitted their third ten-year pump and valve IST program for the Oyster Creek Nuclear Generating Station in a letter dated October 11, 1991.

The staff transmitted a Safety Evaluation {SE) to GPUN addressing the third 10-year IST program in a letter dated September 24, 1992. The SE contained 17 action items which GPUN was requested to address.

GPUN submitted their action item responses in a letter dated December 23, l

1992. The enclosed Safety Evaluation evaluates new and revised relief requests that were submitted in the December 23, 1992, letter. The status of each action item is discussed in Table 1 of the SE.

GPUN did not provide information requested in Item 17.

Flease provide this information in your next IST Program submittal.

GPUN should address issues associated with relief requests that have been granted on a provisional or interim basis in the enclosed SE within 1 year or by the next refueling outage, whichever is later, unless otherwise specified in the SE. Testing associated with Relief Request VR-29 that has been denied is to be in compliance with applicable requirements prior to the initial testing required per IWV-3620 and OM-1-1981.

NRC RE CETBI COPY 1

~

9309090054 930824 l

PDR ADOCK 05000219

,l p

PDR 8

Mr. John J. Barton August 24, 1993 Based on the analysis in the enclosed Safety Evaluation, the staff has taken action pursuant to 50.55a(a)(3)(1), 50.55a(a)(3)(ii), 50.55a(f)(4)(iv), and 50.55a(f)(6)(i).

It has granted relief or approval alternatives where an acceptable level of quality and safety is provided.

The relief granted is authorized by law and will not endanger life, property, or the common defense and security, and is otherwise in the public interest. Any relief requested which is not specifically granted herein is denied.

Sincerely, Original signed by:

Alexander W. Dromerick for: John F. Stolz, Director Project Directorate I-4 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation

Enclosure:

Safety Evaluation cc w/ enclosure:

See next page Distribution:

Docket File NRC & Local PDRs PD I-4 Plant T. Murley/F. Miraglia

)

J. Partlow E. Rossi J. Lieberman S. Varga J. Calvo J. Stolz S. Norris A. Dromerick

)

OGC I

E. Jordan G. Hill (2)

ACRS (10)

OPA OC/LFDCB i

V. McCree, EDO J. Rogge, RI

  • See previous concurrence OM !CE LA:PDI-4 PM;PDI-4, D:PDI-4 OGC*

AdheNck:cn JhtM 7['/

AJorgensen NAME S orr y

'6 /Q#/93

$/94/93 42 /1W93 8/11/93 DATE 0FFICIAL RECORD COPY Document Name: G:\\DROMERIC\\M85312.SE

I, t

Mr. John J. Barton August 24, 1993 1

4 r

Based on the analysis in the enclosed Safety Evaluation, the staff has taken t

action pursuant to 50.55a(a)(3)(1), 50.55a(a)(3)(ii), 50.55a(f)(4)(iv), and 50.55a(f)(6)(i).

It has granted relief or approval alternatives where an 1

d acceptable level of quality and safety is provided. The relief granted is authorized by law and will not endanger life, property, or the common defense 4

and security, and is otherwise in the public interest. Any relief requested which is not specifically granted herein is denied.

Sincerely, Y

if 1

1 John F. Stolz, Director Project Directorate I-4 j

Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation l

Enclosure:

Safety Evaluation l

cc w/ enclosure:

j See next page A

i i

e f

~.

_ -.... ~ _... _. _,.,.. _ - _ ~...

i Mr. John J. Barton Oyster Creek Nuclear I

GPU Nuclear Corporation Generating Station 5

)

i cc:

l Ernest L. Blake, Jr., Esquire Resident Inspector Shaw, Pittman, Potts & Trowbridge c/o U.S. Nuclear Regulatory Commission 2300 N Street, NW.

Post Office Box 445 l

Washington, DC 20037 Forked River, New Jersey 08731 Regional Administrator, Region I Kent Tosch, Chief l

1 U.S. Nuclear Regulatory Commission New Jersey Department of 475 Allendale Road Environmental Protection i

King of Prussia, Pennsylvania 19406 Bureau of Nuclear Engineering CN 415 l

BWR Licensing Manager Trenton, New Jersey 08625 i

GPU Nuclear Corporation 1 Upper Pond Road Mr. John J. Barton i

Parsippany, New Jersey 07054 Vice President and Director 1

GPU Nuclear Corporation Mayor Oyster Creek Nuclear Generating Station a

Lacey Township Post Office Box 388 818 West Lacey Road Forked River, New Jersey 08731 j

Forked River, New Jersey 08731 Licensing Manager Oyster Creek Nuclear Generating Station Mail Stop: Site Emergency Bldg.

Post Office Box 388 1

Forked River, New Jersey 08731 i

1 4

ll m..

,,e_.-

v.-y, -.. - - --

4--~y

_,.,.. -