ML20056G947

From kanterella
Jump to navigation Jump to search
Proposed Tech Specs Table 3.8.4.1-1,reflecting Deletion of Breaker 52-263022 & 3.11.2.7,changing Radioactivity Rate Units to Uci/Sec Instead of Mci/Sec
ML20056G947
Person / Time
Site: Hope Creek 
Issue date: 08/30/1993
From:
Public Service Enterprise Group
To:
Shared Package
ML20056G945 List:
References
NUDOCS 9309070353
Download: ML20056G947 (3)


Text

-

9 ATTACHMENT 2 LICENSE AMENDMENT APPLICATION, LCR 93-20, NLR-N93141 FACILITY OPERATING LICENSE NPF-57 HOPE CREEK GENERATING STATION DOCKET NO. 50-354 A

TECHNICAL SPECIFICATION PAGES WITH PEN AND INK CHANGES The following Technical Specifications for Facility Operating License No. NPF-57 are affected by this license amendment request:

Technical Specification Paaes Table 3.8.4.1-1 3/4 8-29 3.11.2.7 3/4 11-17 f

1 i

i I

rw DR ADO DR L'

j P

~

l TABLE 3.8.4.1-1 (Continued)

PRIMARY CONTAINMENT PENETRATION CONDUCTOR l

OVERCURRENT PROTECTIVE DEVICES i

2.

480-VOLT MOLDE0 CASE CIRCUIT BREAKERS (Continued) l CIRCUIT SYSTEMS OR

{

BREAKER NO.

LOCATION TYPES EQUIPMENT POWERE0 52-253064 108253 IM HFB150 Reactor Vessel Head Vent to TM HFB150 Steam Line 1BB-HV-F005 52-263011 10B263 IM HFB150 Reactor Vessel Head Vent TH HFB150 Outboard Isolation 1BB-HV-F002 52-263012*

108263 IM HFB150 Recirc Pump Motor Hoist 1BH201 TM HFB150 Disconnect Switch 185204 q,-

2-3022#

108 fM HFBI j

f p

t r 7

52-263042*

10B263 IM HFB150 Main Steam Relief Valve Hoist TM HFB150 10H202 Disconnect Switch 105207 52-263054 10B263 IM HFB150 RWCU Suction from Recirc TM HFB150 Loop A 1BG-HV-F100 52-263081 108263 IM HFB150 RWCU Suction from RPV Orain TM HFB150 Valve 1BG-HV-F101 52-263082 108263 IM HFB150 RWCU Suction Valve 1BG-HV-F102 TM HFB150

~

52-263083 108263 IM HFB150 RWCU Suction from Recirc Loop TM HFB150 B Valve IBG-HV-F106 52-264053 108264 IM HFB150 Recirc Pump A Discharge Valve TM HFB150 IBB-HV-F031A 52-264062 108264 IM HFB150 Feedwater Inlet B Shutoff TM HFB150 Valve 1AE-HV-F011B 52-264071 108264 IM HFB150 Reactor Recirc Pump 1AP201 TM HFB150 Space Heater 1A5220 52-264072 10B264 IM HFB150 Reactor Recirc Pump 1BP201 TM HFB150 Space Heater 185220 52-264083 10B264 IM HFB150 Recirc Pump A Suction Valve TM HFB150 IBB-HV-F023A

  • These breakers shall be administrative 1y maintained open in OPERATIONAL CONDITIONS 1, 2 and 3 and are not required to be tested.

HOPE CREEK 3/4 8-29

~

'RADI0 ACTIVE EFFLUENTS MAIN CONDENSER LIMITING CONDITION FOR OPERATION 3.11.2.7 The radicactivity rate of noble gas'es measured at the recombiner

<b af ter-condepser discharge shall be limited to less than or equal to L12tLmi114-Eurieuspc] af ter 30 minute decay.

-mw s'

330 D 5

+

miuotso/

APPLICABILITY:

OPERATIONAL CONDITIONS 1, 2* and 3*.

ACTION:

With the radioactivigt rate of noble caseJJt the recombiner af ter condenser dWehargeexceedidl330s(111f:uries/4egTafter30minutedecay, rest:*eva (r#"N

,5poyJh3IAlil08Et<Tthin tne next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. radioactivity rate to within its limit with SURVEILLANCE REQUIREMENTS 4.11.2.7.1 The radioactivity rate of noble gases at the recombiner after-condenser discharge shall be continuously monitored in accordance cation 3.3.7.1.

4.11.2.7.2 The radioactivity rate of noble gases from the recombiner af ter-condenser discharge shall be determined to be within the limitt of Specifica-tion 3.11.2.7 at the following frequencies by performing an isotopic analysis of a representative sample of gases taken r: ear the discharge of the main con-denser air ejector:

a.

At least once per 31 days.

hea~n~c.~m~(bedrQadioactivftTMonitor, of greater than 505, after factoring

~%b.

e u,

y increases due to changes in THERMAL POWER level, in the nominal steady-state fission gas release from the primary coolant.

The provisions of Specification 4.0.4 are not applicable.

c.

"When the main condenser air ejector is in operation.

HOPE CREEK 3/4 11-17 I