9 ATTACHMENT 2 LICENSE AMENDMENT APPLICATION, LCR 93-20, NLR-N93141 FACILITY OPERATING LICENSE NPF-57 HOPE CREEK GENERATING STATION DOCKET NO. 50-354 A
TECHNICAL SPECIFICATION PAGES WITH PEN AND INK CHANGES The following Technical Specifications for Facility Operating License No. NPF-57 are affected by this license amendment request:
Technical Specification Paaes Table 3.8.4.1-1 3/4 8-29 3.11.2.7 3/4 11-17 f
1 i
i I
rw DR ADO DR L'
j P
~
l TABLE 3.8.4.1-1 (Continued)
PRIMARY CONTAINMENT PENETRATION CONDUCTOR l
OVERCURRENT PROTECTIVE DEVICES i
2.
480-VOLT MOLDE0 CASE CIRCUIT BREAKERS (Continued) l CIRCUIT SYSTEMS OR
{
BREAKER NO.
LOCATION TYPES EQUIPMENT POWERE0 52-253064 108253 IM HFB150 Reactor Vessel Head Vent to TM HFB150 Steam Line 1BB-HV-F005 52-263011 10B263 IM HFB150 Reactor Vessel Head Vent TH HFB150 Outboard Isolation 1BB-HV-F002 52-263012*
108263 IM HFB150 Recirc Pump Motor Hoist 1BH201 TM HFB150 Disconnect Switch 185204 q,-
2-3022#
108 fM HFBI j
f p
t r 7
52-263042*
10B263 IM HFB150 Main Steam Relief Valve Hoist TM HFB150 10H202 Disconnect Switch 105207 52-263054 10B263 IM HFB150 RWCU Suction from Recirc TM HFB150 Loop A 1BG-HV-F100 52-263081 108263 IM HFB150 RWCU Suction from RPV Orain TM HFB150 Valve 1BG-HV-F101 52-263082 108263 IM HFB150 RWCU Suction Valve 1BG-HV-F102 TM HFB150
~
52-263083 108263 IM HFB150 RWCU Suction from Recirc Loop TM HFB150 B Valve IBG-HV-F106 52-264053 108264 IM HFB150 Recirc Pump A Discharge Valve TM HFB150 IBB-HV-F031A 52-264062 108264 IM HFB150 Feedwater Inlet B Shutoff TM HFB150 Valve 1AE-HV-F011B 52-264071 108264 IM HFB150 Reactor Recirc Pump 1AP201 TM HFB150 Space Heater 1A5220 52-264072 10B264 IM HFB150 Reactor Recirc Pump 1BP201 TM HFB150 Space Heater 185220 52-264083 10B264 IM HFB150 Recirc Pump A Suction Valve TM HFB150 IBB-HV-F023A
- These breakers shall be administrative 1y maintained open in OPERATIONAL CONDITIONS 1, 2 and 3 and are not required to be tested.
HOPE CREEK 3/4 8-29
~
'RADI0 ACTIVE EFFLUENTS MAIN CONDENSER LIMITING CONDITION FOR OPERATION 3.11.2.7 The radicactivity rate of noble gas'es measured at the recombiner
<b af ter-condepser discharge shall be limited to less than or equal to L12tLmi114-Eurieuspc] af ter 30 minute decay.
-mw s'
330 D 5
+
miuotso/
APPLICABILITY:
OPERATIONAL CONDITIONS 1, 2* and 3*.
ACTION:
With the radioactivigt rate of noble caseJJt the recombiner af ter condenser dWehargeexceedidl330s(111f:uries/4egTafter30minutedecay, rest:*eva (r#"N
,5poyJh3IAlil08Et<Tthin tne next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. radioactivity rate to within its limit with SURVEILLANCE REQUIREMENTS 4.11.2.7.1 The radioactivity rate of noble gases at the recombiner after-condenser discharge shall be continuously monitored in accordance cation 3.3.7.1.
4.11.2.7.2 The radioactivity rate of noble gases from the recombiner af ter-condenser discharge shall be determined to be within the limitt of Specifica-tion 3.11.2.7 at the following frequencies by performing an isotopic analysis of a representative sample of gases taken r: ear the discharge of the main con-denser air ejector:
a.
At least once per 31 days.
hea~n~c.~m~(bedrQadioactivftTMonitor, of greater than 505, after factoring
~%b.
e u,
y increases due to changes in THERMAL POWER level, in the nominal steady-state fission gas release from the primary coolant.
The provisions of Specification 4.0.4 are not applicable.
c.
"When the main condenser air ejector is in operation.
HOPE CREEK 3/4 11-17 I