Forwards Application for Amend to License NPF-69,revising Tech Spec 4.8.1.1.2.e, AC Sources - Operating & Adding Spec 4.8.1.1.2.f
ML20056G192
Person / Time
Site: Nine Mile Point 
Issue date: 08/27/1993
From: Terry C
NIAGARA MOHAWK POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20056G193 List:
References
SM2-L93-0096, SM2-L93-96, NUDOCS 9309020223
Download: ML20056G192 (2)


Text

.

M V NIAGARA RuMOHAWK NI AGARA MOHAWK POWER CORPORATION 301 PL AINFIELD ROAD SYRACUSE. N Y 13212; TELEPHONE (315) 474-1511 August 27, 1993 SM2-L93-0096 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 RE: Nine Mile Point Unit 2 Docket No. 50-410 NPF-69 TAC No. M86610 Gentlemen:

Niagara Mohawk Power Corporation hereby transmits an Application for Amendment to Nine Mile Point Unit 2 Operating License NPF-69. This application supersedes our application of March 30,1993 (NMP2L 1374). Also enclosed are the proposed changes to l

the Technical Specifications in Appendix A of the above mentioned license. Supporting information and analyses demonstrating that the proposed changes involve no significant hazards consideration pursuant to 10CFR50.92 are included in Appendix B.

The proposed Technical Specification changes contained herein represent a revision to Specification 4.8.1.1.2.e "AC Sources - Operating" and adds Specification 4.8.1.1.2.f.

These will replace the requirement to perform a hot Loss of Off-Site Power test following the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> full power run during shutdown (4.8.1.1.2.e.8) with a requirement to perform a hot restart test following a full loaded diesel run of greater than 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> in any operating condition (4.8.1.1.2.f). Also, current Sections 4.8.1.1.2.f and g are relettered to 4.8.1.1.2.g and h. The proposed changes are consistent with the Improved Standard Technical Specifications, NUREG-1434 issued September 28,1992, and previously approved Technical

]

Specification Amendment No.13 for Seabrook. In order to support the upcoming Nine Mile Point Unit 2 refueling outage, approval of this application is requested by October 1,1993.

Pursuant to 10CFR50.91(b)(1), Niagara Mohawk has provided a copy of this license amendment request and the associated analyses regarding no significant hazards consideration to the appropriate state representative.

Sincerely, C. D. Terry Vice President Nuclear Engineering fn n

9309020223 930827 M

v PDR ADOCK 05000410 i

P PDR L

'g

i 1

MC/Imc Enclosures xc: Regional Administrator, Region I Mr. W. L. Schmidt, Senior Resident Inspector I

Mr. R. A. Capra, Director, Project Directorate I-A, NRR Mr. J. E. Menning, Project Manager, NRR Ms. Donna Ross i

Division of Policy Analysis and Planning New York State Energy Office Agency Building 2 Empire State Plaza Albany, New York 12223 Records Management i

r

[

t I

i I