Special Rept:On 930801,Train a CR Area Ventilation Heater Declared Inoperable & Was Inoperable for More than 7 Days Due to Planning Oversight.Corrective Work Order Initiated to Install Jumper to Bypass Damper Limit Switch Interlock
ML20056F960
Person / Time
Site: Catawba Duke Energy icon.png
Issue date: 08/19/1993
From: Rehn D
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9309010083
Download: ML20056F960 (2)


Text

l Dae Iwer company DLRon Catzba Nudear Generation Depenmen:

%cc 1+e.sident RD Concord Road (ggygyggyg; 977,(,

Yo<SC3N5 paygy;3tyga DUKEPOWER August 19, 1993 j

U. S. Nuclear Regulatory Commission ATTN:

Document Control Desk Washington, DC 20555

Subject:

Catawba Nuclear Station, Unit 1 Docket No. 50-413 Control Room Area Ventilation System Heater Inoperable Greater Than 7 Days Special Report Pursuant to Catawba Nuclear Stat. ion Technical Specification 3.7.6 Action b.,

find attached a

hiTcial Report concerning the l

inoperability of the Unit 1 Traig A Jontrol Room Area Ventilation Heater.

The Train A heater was d, tared inoperable on August 1, 1993.

Very truly yours, i

s

~1 y'lll l

-p D. L.

ehY Attachment KEN /SRHTR819.93 xc:

S. D.

Ebneter Regional Administrator, Region II R. J. Freudenberger Senior Resident Inspector R.

E. Martin, ONRR

^~

"'0"w dN A/ ^*

9309010083 930819 II jfJ[

PDR ADOCK 05000413 6 p

S pon y 1

l l

re n,-aa

I SPECIAL REPORT CATAWBA NUCLEAR STATION

)

UNIT 1 TRAIN A CONTROL ROOM AREA VENTILATION HEATER INOPERABLE FOR MORE THAN 7 DAYS Catawba Technical Specification 3.7.6 requires two independent Control Room Area (CRA) Ventilation Systems to be operable.

In Modes 1,

2, 3,

and 4, with the heaters tested in 4.7.6.b and 4.7.6.e.4 inoperable, restoration must be made within 7. days,

otherwise, a special report must be submitted within 30 days.

During routine surveillance, with Unit 1 in Mode 1,

it was j

discovered that the limit switch for Unit 1 Train A CRA Ventilation l

System damper was off, thus preventing the heater from energizing.

i The Unit 1 Train A heater was declared inoperable on August 1,

1993.

At the time of this discovery, a Nuclear Station Modification (NSM)

CN-50433 to replace the hydromotor for the damper was in progress.

Due to a planning oversight, the step to direct the work team to place a jumper was sequenced improperly in this NSM package.

Corrective actions included initiating a corrective work order to install a jumper to bypass the damper limit switch interlock associated with the heater.

Corrective work order 93055299-01 was cleared on August 4, 1993, and the Train A heater was returned to operable status.