Informs That Util 930305-14 Ltrs Re Use of Gas Turbine Generator (G-05) as Alternate AC Power source,10CFR50.63, Loss of All Alternating Current Power Acceptable
ML20056F340
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 08/12/1993
From: Gody A
Office of Nuclear Reactor Regulation
To: Link R
WISCONSIN ELECTRIC POWER CO.
References
TAC-M84420, TAC-M84421, NUDOCS 9308270009
Download: ML20056F340 (2)


Text

S August 12, 1993 Docket Nos.

50-266 DISTRIBUTION and 50-301 Docket File JRoe PDIII-3 Reading JZwolinski Mr. Robert E. Link, Vice President NRC & Local PDRs JHannon Nuclear Power Department Region III, DRP ATGody, Jr.

Wisconsin Electric Power Company ACRS(10)

CBerlinger 231 West Michigan Street, Room P379 OGC MRushbrook Milwaukee, Wisconsin 53201 PDIII-3, Gray

Dear Mr. Link:

SUBJECT:

USE OF POINT BEACH NUCLEAR PLANT GAS TURBINE GENERATOR (G-05) AS AN ALTERNATE AC POWER SOURCE; 10 CFR 50.63, " LOSS OF ALL ALTERNATING CURRENT POWER" (TAC Nos. M84420 and M84421)

The staff has completed its review of your letters dated March 5 and May 14, 1993, regarding the post-overhaul reliability of G-05.

Your letter dated March 5,1993, reaffirmed your commitment to maintain a target reliability of l

95% for G-05, and your commitment to continue your G-05 reliability probram l

(PBNP 3.2.15).

The staff acknowledges these commitments.

Your letter dated l

May 14, 1993, provided the staff with a summary of the results of post-overhaul reliability testing of G-05, in which you concluded that testing has demonstrated that G-05 is capable of achieving a 95% reliability level.

Based i

on the most recent data which indicates that you completed 20 consecutive t

successful start and load attempts on May 6,1993,.the staff concludes that G-05 appears to be capable of achieving the required 95% reliability level.

flowever, the staff understands that you will continue the testing of G-05 and improve the confidence level of 95% reliability of the Gas Turbine Generator.

Further, our review indicates that your reliability program for the Gas Turbine Generator satisfies the reliability aspects of Regulatory Guide 1.155,

" Station Blackout."

This completes all licensing action on the " Station Blackout" issue.

Please respond within 60 days of receipt of this letter regarding the implementation of your commitments to satisfy the requirements of 10 CFR 50.63, " Loss of All Alternating Current Power".

Sincerely, ORIGINAL SIGNED BY Allen G. IIansen for:

Anthony T. Gody, Jr., Sr. Project Manager Project Directorate III-3 Division of Reactor Projects III/IV/V Office of Nuclear Reactor Regulation cc:

I See next page

  • See previous concurrence l)

BC: EEL F h PD3-3:hl 0FFICE PD3-3:LA PD3-3:PM NAME

  • MRushbrook
  • ATGody CBerlinkr JHannon DATE 6/24/93 7/6/93 S //o /93 h/ [l/93 0FFICIAL RECORD DOCUMENT NAME: G:\\PTBEACH\\PBM84420.LTR hhkCPN'h I

9308270009 930812 gDR ADOCK 0500 6

k #

. k' t

Mr. Robert E. Link Point Beach Nuclear Plant Wisconsin Electric Power Company Unit Nos. I and 2 cc:

Ernest L. Blake, Jr.

Shaw, Pittman, Potts & Trowbridge 2300 N Street, N.W.

Washington, DC 20037 Mr. Gregory J. Maxfield, Manager Point Beach Nuclear Plant Wisconsin Electric Power Company 6610 Nuclear Road Two Rivers, Wisconsin 54241 Town Chairman Town of Two Creeks i

l Route 3 Two Rivers, Wisconsin 54241 Chairman Public Service Commission of Wisconsin Hills Farms State Office Building Madison, Wisconsin 53702 Regional Administrator, Region III l

U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 Resident Inspector's Office U.S. Nuclear Regulatory Commission 6612 Nuclear Road l

Two Rivers, Wisconsin 54241 t

{

- - -.. - -