Text
S August 12, 1993 Docket Nos.
50-266 DISTRIBUTION and 50-301 Docket File JRoe PDIII-3 Reading JZwolinski Mr. Robert E. Link, Vice President NRC & Local PDRs JHannon Nuclear Power Department Region III, DRP ATGody, Jr.
Wisconsin Electric Power Company ACRS(10)
CBerlinger 231 West Michigan Street, Room P379 OGC MRushbrook Milwaukee, Wisconsin 53201 PDIII-3, Gray
Dear Mr. Link:
SUBJECT:
USE OF POINT BEACH NUCLEAR PLANT GAS TURBINE GENERATOR (G-05) AS AN ALTERNATE AC POWER SOURCE; 10 CFR 50.63, " LOSS OF ALL ALTERNATING CURRENT POWER" (TAC Nos. M84420 and M84421)
The staff has completed its review of your letters dated March 5 and May 14, 1993, regarding the post-overhaul reliability of G-05.
Your letter dated March 5,1993, reaffirmed your commitment to maintain a target reliability of l
95% for G-05, and your commitment to continue your G-05 reliability probram l
(PBNP 3.2.15).
The staff acknowledges these commitments.
Your letter dated l
May 14, 1993, provided the staff with a summary of the results of post-overhaul reliability testing of G-05, in which you concluded that testing has demonstrated that G-05 is capable of achieving a 95% reliability level.
Based i
on the most recent data which indicates that you completed 20 consecutive t
successful start and load attempts on May 6,1993,.the staff concludes that G-05 appears to be capable of achieving the required 95% reliability level.
flowever, the staff understands that you will continue the testing of G-05 and improve the confidence level of 95% reliability of the Gas Turbine Generator.
Further, our review indicates that your reliability program for the Gas Turbine Generator satisfies the reliability aspects of Regulatory Guide 1.155,
" Station Blackout."
This completes all licensing action on the " Station Blackout" issue.
Please respond within 60 days of receipt of this letter regarding the implementation of your commitments to satisfy the requirements of 10 CFR 50.63, " Loss of All Alternating Current Power".
Sincerely, ORIGINAL SIGNED BY Allen G. IIansen for:
Anthony T. Gody, Jr., Sr. Project Manager Project Directorate III-3 Division of Reactor Projects III/IV/V Office of Nuclear Reactor Regulation cc:
I See next page
- See previous concurrence l)
BC: EEL F h PD3-3:hl 0FFICE PD3-3:LA PD3-3:PM NAME
- MRushbrook
- ATGody CBerlinkr JHannon DATE 6/24/93 7/6/93 S //o /93 h/ [l/93 0FFICIAL RECORD DOCUMENT NAME: G:\\PTBEACH\\PBM84420.LTR hhkCPN'h I
9308270009 930812 gDR ADOCK 0500 6
k #
. k' t
Mr. Robert E. Link Point Beach Nuclear Plant Wisconsin Electric Power Company Unit Nos. I and 2 cc:
Ernest L. Blake, Jr.
Shaw, Pittman, Potts & Trowbridge 2300 N Street, N.W.
Washington, DC 20037 Mr. Gregory J. Maxfield, Manager Point Beach Nuclear Plant Wisconsin Electric Power Company 6610 Nuclear Road Two Rivers, Wisconsin 54241 Town Chairman Town of Two Creeks i
l Route 3 Two Rivers, Wisconsin 54241 Chairman Public Service Commission of Wisconsin Hills Farms State Office Building Madison, Wisconsin 53702 Regional Administrator, Region III l
U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 Resident Inspector's Office U.S. Nuclear Regulatory Commission 6612 Nuclear Road l
Two Rivers, Wisconsin 54241 t
{
- - -.. - -