ML20056E723

From kanterella
Jump to navigation Jump to search
Notification of Significant Licensee Meeting W/Util on 930927 to Discuss Results of Systematic Assessment of Licensee Performance Repts 50-313/93-99 & 50-368/93-99
ML20056E723
Person / Time
Site: Arkansas Nuclear  
Issue date: 08/18/1993
From: Beach A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
NUDOCS 9308250110
Download: ML20056E723 (3)


See also: IR 05000313/1993099

Text

l

U;elVED STATES

R RECO

y,

3

NUCLEAR REGULATORY COMMISSION

!.hy[p).}

~

REGION IV

,

7.;,y

[

611 RYAN PLAZA DRIVE, SUITE 400

-

Q

&

AR LtNGTON. TEXAS 760118064

'

AUG I 81993

NOTICE OF SIGNIFICANT LICENSEE MEETING

'

Name of Licensee:

Entergy Operations, Inc.

Name of Facility:

Arkansas Nuclear One (ANO)

1

Docket No.:

50-313; 50-368

Date and Time

September 27, 1993

of Meeting:

12:30 p.m. (CDT)

.

Location of Meeting:

Training Center Auditorium, AN0

Purpose of Meeting:

Public meeting to discuss the results of Systematic

Assessment of Licensee Performance (SALP)

Report 50-313/93-99; 50-368/93-99

I

NRC Attendees:

J. Milhoan, Regional Administrator

L. Callan, Director, Division of Radiation Safety and

Safeguards

E. Adensam. Director, Division of Reactor Projects III,

1

IV, and V, Office of Nuclear Reactor Regulation

,

A. Howell, Acting Deputy Director, Division of Reactor

Projects (DRP)

,

T. Stetka. Chief, Project Section D, DRP

,

l

L. Smith, Senior Resident Inspector, Project Section D,

'

DRP

J. Gilliland, Public Affairs Officer

C. Hackney, Regional State Liaison Officer

j

l

Licensee Attendees:

D. Hintz, President and Chief Executive Officer

l

H. Keiser, Executive Vice President and Chief

Operating Officer

R. Keith, President - Arkansas Power & Light

l

J. Yelverton. Vice President, Operations, AND

M. Sellman, General Manager, Plant Operations

J. Fisicaro, Director, Licensing

L. Humphrey, Director, Quality

W. Eaton. Director, Engineering

J. Vandergrift. Plant Manager, Unit 1

R. Edington, Plant Manager, Unit 2

D. Denton, Director, Support

,/ l O

'

9308250110 930818

l

l

PDR

ADOCK 05000313

k .J

G

PDR

_ . .

.

!

!

.

.

Entergy Operations, Inc.

-2-

i

i

NOTE:

(1) Attendance by NRC personnel at the NRC/ licensee meeting should be made

known by COB on September 24 via telephone call to Tom Stetka

(817/860-8247).

(2) This meeting is open to attendance by members of the general public.

(

'

/

/v

. b /(M

/a

Approved By:

A. Bill Be@h, Director '~ 4/j

Division oR Reactor Projects

i

i

!

!

.

l

I

l

l

!

i

,

'

.

_

_

._

.__ ___ _. _ _

_.

_

J

.

AUG 181993

.

Entergy Operations, Inc.

-3-

1

Distribution:

,

DMB (IE 45)

J. H. Sniezek, DEDR (MS 17G21)

H. L. Thompson, DEDS (MS 17G21)

T. E. Murley, D/NRR (MS 12D1)

l

W. T. Russell, ADT/NRR (MS 12G18)

>

l

J. G. Partlow, ADP/NRR (MS 12D9)

l

J. Lieberman, D/0E (MS 7H5)

i

l

L. J. Chandler, OGC (MS 15B18)

OEDO RIV Coordinator (MS 17G21)

J. '.. iiilhca, "

J. M. Montgomery, DRA

G. F. Sanborn, E0

C. A. Hackney, RSLO

NRC Attendees (E-Mail)

RA Secretary

Carol Gordon

l

Division Secretary (DRP, DRS, DRSS)

<

!

L. S. Ousley

l

RIV File

i

l

  • RIV:C:DRP/D

PA0 -1, /

RSLO ~-

D:DRFf(h'- V

TFStetka;df

JTGillil and

CAHackney

ABBea'ch J

8/6/93

8/(/93

8/_/93

8/gj/93

-

  • Previously concurred

l

-

-

-

_.

.