ML20056E723
| ML20056E723 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 08/18/1993 |
| From: | Beach A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| NUDOCS 9308250110 | |
| Download: ML20056E723 (3) | |
See also: IR 05000313/1993099
Text
l
U;elVED STATES
R RECO
y,
3
NUCLEAR REGULATORY COMMISSION
!.hy[p).}
~
REGION IV
,
7.;,y
[
611 RYAN PLAZA DRIVE, SUITE 400
-
Q
&
'
AUG I 81993
NOTICE OF SIGNIFICANT LICENSEE MEETING
'
Name of Licensee:
Entergy Operations, Inc.
Name of Facility:
1
Docket No.:
50-313; 50-368
Date and Time
September 27, 1993
of Meeting:
12:30 p.m. (CDT)
.
Location of Meeting:
Training Center Auditorium, AN0
Purpose of Meeting:
Public meeting to discuss the results of Systematic
Assessment of Licensee Performance (SALP)
Report 50-313/93-99; 50-368/93-99
I
NRC Attendees:
J. Milhoan, Regional Administrator
L. Callan, Director, Division of Radiation Safety and
Safeguards
E. Adensam. Director, Division of Reactor Projects III,
1
IV, and V, Office of Nuclear Reactor Regulation
,
A. Howell, Acting Deputy Director, Division of Reactor
Projects (DRP)
,
T. Stetka. Chief, Project Section D, DRP
,
l
L. Smith, Senior Resident Inspector, Project Section D,
'
J. Gilliland, Public Affairs Officer
C. Hackney, Regional State Liaison Officer
j
l
Licensee Attendees:
D. Hintz, President and Chief Executive Officer
l
H. Keiser, Executive Vice President and Chief
Operating Officer
R. Keith, President - Arkansas Power & Light
l
J. Yelverton. Vice President, Operations, AND
M. Sellman, General Manager, Plant Operations
J. Fisicaro, Director, Licensing
L. Humphrey, Director, Quality
W. Eaton. Director, Engineering
J. Vandergrift. Plant Manager, Unit 1
R. Edington, Plant Manager, Unit 2
D. Denton, Director, Support
,/ l O
'
9308250110 930818
l
l
ADOCK 05000313
k .J
G
_ . .
.
!
!
.
.
Entergy Operations, Inc.
-2-
i
i
NOTE:
(1) Attendance by NRC personnel at the NRC/ licensee meeting should be made
known by COB on September 24 via telephone call to Tom Stetka
(817/860-8247).
(2) This meeting is open to attendance by members of the general public.
(
'
/
/v
. b /(M
/a
Approved By:
A. Bill Be@h, Director '~ 4/j
Division oR Reactor Projects
i
i
!
!
.
l
I
l
l
!
i
,
'
.
_
_
._
.__ ___ _. _ _
_.
_
J
.
AUG 181993
.
Entergy Operations, Inc.
-3-
1
Distribution:
,
DMB (IE 45)
J. H. Sniezek, DEDR (MS 17G21)
H. L. Thompson, DEDS (MS 17G21)
T. E. Murley, D/NRR (MS 12D1)
l
W. T. Russell, ADT/NRR (MS 12G18)
>
l
J. G. Partlow, ADP/NRR (MS 12D9)
l
J. Lieberman, D/0E (MS 7H5)
i
l
L. J. Chandler, OGC (MS 15B18)
OEDO RIV Coordinator (MS 17G21)
J. '.. iiilhca, "
J. M. Montgomery, DRA
G. F. Sanborn, E0
C. A. Hackney, RSLO
NRC Attendees (E-Mail)
RA Secretary
Carol Gordon
l
Division Secretary (DRP, DRS, DRSS)
<
!
L. S. Ousley
l
RIV File
i
l
- RIV:C:DRP/D
PA0 -1, /
RSLO ~-
D:DRFf(h'- V
TFStetka;df
JTGillil and
CAHackney
ABBea'ch J
8/6/93
8/(/93
8/_/93
8/gj/93
-
- Previously concurred
l
-
-
-
_.
.