ML20056E670
| ML20056E670 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 08/10/1993 |
| From: | Evered J AFFILIATION NOT ASSIGNED |
| To: | NRC OFFICE OF THE SECRETARY (SECY) |
| Shared Package | |
| ML20056E662 | List: |
| References | |
| OLA-2, NUDOCS 9308250039 | |
| Download: ML20056E670 (5) | |
Text
u
6 k
8 -/o - 93
\\
lo kr b2W
/~CAAu A
6A 93ao ow m
b er/M,M93 AuG 16 40 54 liva
..me m, n.._. - v ia as
.v.
U A#* '
'/
b d, d66[6
'8ERVED AUG z3 seJ Y
f"? a au x
~
s aa
\\
Aw& Mgp af7;e8 sf2t?
i ac-ae cKAj ~5 dstd4a.
~
E!!Eseggi,,
o PDn
) 66 1
j
?
l RECE:.
NRC rq-T.::
REGION V l
93 AUG -2 All:52
'93 A!:3 17 75:58 Joe H. 2 humate 7/25/93 232 Hillcrest Dr.
{
Arroyo Grande. Ca 93420 t
Nuclear Regulatory Commission me m 231993 i
l Region V 1450 Maria Lane i
l Walnut Creek, Ca 94596 i
l Gentlemen, t
I have lived in the vicinity of Diablo Canyon Nuclear Power l
Plant, and have since its construction began.
I have experienced l
no problems, physical or emotional, from living in its proximity.
i l
! believe that it should be allowed to recapture the years lost between construction and startup.
Particularly since they were l
lost through no fault of P.G. & E's.
Those years were lost by regulatory changes and outside interference and should not be used to penalize P.G. & E.
I I firmly believe that nuclear power is one of the answers to our l
energy needs. The plant has proven itself by being one of the t
best operating plants in the United States and will, I am sure, continue to operate in a safe and efficient manner.
I believe l
that the current license should be extended to recapture those lost years.
It seems foolish to build auch a fine facility, that operates so well, and then have to decommission it after 20
+
are.
j incepel I
I Ci g
kJoeH.Shumate i
l 1
l
,-.4e
-, =,
---"+-=~m-**
/
UNITED STATES o
~,,
y NUCLEAR REGULATORY COMMISSION o
,E REGION V t,
[
1450 MARIA LANE
?.,,,,
WALNUT CREEK, CAUFORNIA 94596-5368 j
1 August 12, 1993 MEMORANDUM FOR:
Emile Julian, Chief Docketing and Services Branch Office of the Secretary FROM:
Gregory N. Cook
((,-
Senior Public Affairs Officer OPA/F0 (RV)
SUBJECT:
PUBLIC COMMENT ON LICENSE AMENDMENT REQUEST l
The enclosed letter comments on Pacific Gas & Electric Company's request for f
license amendments to recapture the construction periods for Di blo Canyon Units 1 & 2.
This amendment request is the subject of a hearing before an Atomic Safety and Licensing Board.
I will provide copies of the letter to the Board in person prior to the hearing, per guidance of the Board Chairman.
i 8
~_
~
l UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of PACIFIC GAS AND ELECTRIC COMPANY Docket No.(s) 50-275/323-OLA-2 l
?
(Diablo Canyon Nuclear Power Plant, Unit Nos. 1 and 2)
CERTIFICATE OF SERVICE i
I hereby certify that copies of the. foregoing 3 LIMITED APPEARANCE LETTERS i
have been served upon the following persons by U.S. mail, first cla... except as otherwise roted and in accordance with the requirements of 10 CFR Sec. 2.712.
j i
Office of Commission Appellate Administrative Judge Adjudication Charles Bechhoefer,. Chairman U.S. Nuclear Regulatory Comission Atomic Safety and Licensing Board Washington, DC 20555 U.S. Nuclear Regulatory Commission j
Washington, DC 20555 a;
I t,,~
ok[lF Administrative Judge Administrative Judge Jerry R. Kline Frederick J. Shon Atomic Safety and Licensing Board Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission-Washington, DC 20555 Washington, DC 20555 i
Ann P. Hodgdon, Esq.
C. J.
Warner, Esq.
Office of the General Counsel Richard F. Locke, Esq.
.g U.S. Nuclear Regulatory Comission Pacific Gas & Electric Company ='
Washington, DC 20555 77 Beale Street 9"
San Francisco, CA 94106
\\-
Robert R. Wellington, Esq.
Joseph B. Knotts, Jr., Esq.
Diablo Canyon Independent Safety David A. Repka, Esq.
Committee Winston & Strawn 857 Cass Street, Suite D 1400 L Street, N.W.
Monterey., CA 93940-Washington,'DC 20005 l
i i
Docket No.(s)50-275/323-OLA-2 i
3 LIMITED APPEARANCE LETTERS i
Truman Burns Peter G. Fairchild, Esq.
Robert Kinosian California Public Utilities Comission i
California Public Utilities Comission 505 Van Ness Avenue 505 Van Ness, Room 4103 San Francisco, CA 94102 San Francisco, CA 94102 t
t Nancy Culver, President Diane Curran, Esq.
i Board of Directors Counsel for SLOMFP Mothers for Peace c/o IEER P. O. Box 164 6935 Laurel Avenue, Suite 204 l
Pismo Beach, CA 93448 Takoma Park, MD 20912 j
Dated at Rockville, Md. this 23 day of August 1993 Off1ct of thi Secretary of the Commission i