Amend 154 to License DPR-40,changing TS 3.2 (Table 3-5) to Require Charcoal Filter Volumetric Flow Rate of Between 4500 & 12000 Cubic Feet Per Minute
ML20056E536
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 08/10/1993
From: Rood H
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20056E535 List:
References
NUDOCS 9308240224
Download: ML20056E536 (4)


Text

..

1 pa aso v

.- .t UNITED STATES

[,'W j NUCLEAR REGULATORY COMMIS510N WASHINGTON, D.C. 20556 0001 o f

....c'~ ,

r OMAHA PUBLIC POWER DISTDTCT DOCKET NO. 50-285 -

FORT CALHOUN STATION. UNIT NO. I AMENDMENT TO FACILITY OPERATING LICENSE I

Amendment No.154 License No. DPR-40

1. The Nuclear Regulatory Commission (the Commission) has found that:

A. The application for amendment by the Omaha Public Power District (the licensee) dated October 9,.1992, complies with the standards ,

and requirements of the Atomic Energy Act of 1954, as amended (the ,

Act), and the Commission's rules and regulations. set forth in 10 CFR.

Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the i Commission; C. There is reasonable assurance: (i) that the activities authorized .

, by this amendment can be conducted without endangering the health '

i and safety of the public, and (ii) that such activities will be ,

i conducted in compliance with the Commission's regulations;

! D. The issuance of this license amendment will not be inimical to the

common defense and security or to the health and safety of the l l public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 l of the Commission's regulations and all applicable requirements have been satisfied. ,

i l

l i 9308240224 930810 PDR ADOCK 0500028b, l p PDR.

2. Accordingly, Facility Operating License No. DPR-40 is amended by changes to the Technical Specifications as indicated in the attachment to this '

license amendment, and paragraph 3.B. of Facility Operating License No.

DPR-40 is hereby amended to read as follows:

B. Technical Soecifications The Technical Specifications contained in Appendix A, as revised through Amendment No.154 , are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.

3. The license amendment is effective 30 days from the date of issuance.

FOR THE NUCLEAR REGULATORY C0HMISSION C

Harry R , Acting Director Project Directorate IV-1 Division of Reactor Projects - III/IV/V Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of Issuance: August 10, 1993  ;

l l

i

. ATTACHMENT TO LICENSE AMENDMENT NO 154 FACILITY OBERATING LICENSE NO. DPR-40 DOCKET NO. 50-285 ,

Revise Appendix "A" Technical Specifications as indicated below. The revised page is identified by amendment number and contains vertical lines indicating the area of change.

REMOVE PAGE INSERT PAGE 3-20b 3-20b t

I i

l

TACLE 3-5 (Continued) .

USAR Section l

.. Int Freauency Reference 10b. Charcoal Adsorbers 1. In-Place Testinr**

for Spent Fuel Charcoal adsorbers shall be Each month refueling shutdown not to 6.2 Storage Pool Ares leak tested and shall show exceed 18 months or aRer every 720 9.10 199% Freon (R Il or R-Il2) hours of system operataan, or mRer removal. each complete or partsal replacement of the charcoal adsorber bank, or aner any major structural menintenance on the system housing and following significant painting, fire or chemscal release in a ventilation zone comununi-

2. I.aboratory Testina cating with the system.
a. Initial batch tests of all Prior to initial loadmg in the filter unit.

charcoal adsorbers shall show 199% elemental iodine removal when tested under conditions of A95% R.H.,21257,5 to 10 mg/m' inlet elesien-tal iodine concentration and at the face velocity within f_20% of system design.

b. The carbon sample test Each refueling shutdown not to exceed results shall show A90% 18 months or after every 720 hours0.00833 days <br />0.2 hours <br />0.00119 weeks <br />2.7396e-4 months <br /> of elemental iodine removal, system operatson, and following signif-under conditions of195% icant painting, fire or chenocal release R.H.,11257,5 to 10mg/n/ in any ventilation zone come====cating 1

inlet elenustal concentra- with the system. l tion and within 20% of design face velocity.

3. Overall System Operation
a. Operation of each circuit Ten hours every month.
shall be demonstrated.
b. Volume flow rate through At least once per plant operating cycle.

charcoal filter shall be shown to be between 4500 and 12,000 cfm.  !'

4. Mannst initiation of the At least once per plant operating cycle.

system shall be demon-strated.

t

    • T tes s shall be performed in m. ' _:e with applicable section(s) of ANSI N510-1980.

t 3-20b Amendment No. 55,21,52, 22,154 I