ML20056D989
| ML20056D989 | |
| Person / Time | |
|---|---|
| Site: | Fort Calhoun |
| Issue date: | 07/29/1993 |
| From: | Steven Bloom Office of Nuclear Reactor Regulation |
| To: | Tira Patterson OMAHA PUBLIC POWER DISTRICT |
| Shared Package | |
| ML20056D990 | List: |
| References | |
| TAC-M85843, NUDOCS 9308190149 | |
| Download: ML20056D989 (4) | |
Text
[.
- c l
July'29, 1993 l
p Docket No. 50-285 l
Mr. Terry L. Patterson Division Manageri-Nuclear Operations Omaha ~ Public Power District fort Calhoun Station FC-2-4 Adm.
. Post Office Box 399 Hwy. 75 - North of Fort Calhoun
-l Fort Calhoun, Nebraska 68023-0399
.j
Dear Mr. Patterson:
SUBJECT:
TOPICAL REPORT OPPD-NA-8301, " RELOAD CORE ANALYSIS METHODOLOGY 0VERVIEW," REV. 5 (TAC NO. M85843) i By letter dated February 5, 1993, as supplemented by letter dated June 25, t
1993, you submitted proposed changes to the Fort Calhoun Station " Reload Core, Analysis Methodology Overview" (0 PPD-NA-8301, Rev 4). The NRC staff has reviewed the proposed changes and finds them acceptable.
A copy of the Safety Evaluation is enclosed.
Sincerely, ORIGINAL SIGNED BY Steven D. Bloom, Project Manager Project Directorate IV-1 Division of Reactor Projects - III/IV/V Office of Nuclear Reactor Regulation
Enclosure:
Safety Evaluation cc w/ enclosure:
See next page DISTRIBUTION:
Docket File NRC & Local PDRs PD4-1 Reading S. Bloom E. Adensam H. Rood P. Noonan
.ACRS(10) (P-315)
OGC(15B18)
A. B. Beach, RIV J. Roe OFC.
LA:PD4-lu n PM:PD4-1 D(A):PD4-1 NAME PNoona#)I SBidhpk HRood h n
7 Ml93
))29/93
'7/tN93 DATE
/
YES N O)[YEhNO h/N0 COPY v
v i
hI OFFICIAL RECORD COPY Document Name:
FC85843.ltr l
9308190149 930729 MC FEE CMTER DR ADDCK 0500 0
}
4 ;.
K July 29, 1993 l
i Docket No. 50-285 i
si Mr. Terry'L. Patterson Division _ Manager - Nuclear Operativns j
Omaha Public Power District Fort Calhoun-Station FC-2-4 Adm.
Post Office Box 399 i
Hwy. 75 - North.of Fort Calhoun Fort Calhoun, Nebraska 68023-0399 i
Dear Mr. Patterson:
i
SUBJECT:
TOPICAL REPORT OPPD-NA-8301, " RELOAD _ CORE ANALYSIS METHODOLOGY
+
OVERVIEW," REV.-5 (TAC NO. M85843)
.i By letter dated February 5, 1993, as supplemented by letter dated June 25, 1993, you submitted proposed changes to the Fort Calhoun Station " Reload Core l
Analysis Methodology Overview" (0 PPD-NA-8301,-Rev 4). The NRC staff has
?
- reviewed the proposed changes and' finds' them acceptable.
i A copy of the Safety Evaluation is enclosed.
Sincerely, ORIGINAL. SIGNED BY-Steven D.-Bloom, Project Manager l
Project Directorate'IV-1 Division of Reactor Projects -'III/IV/V Office _of Nuclear Reactor. Regulation
Enclosure:
O Safety Evaluation cc w/ enclosure:
,See next page 4
r DISTRIBUTION:
Docket File NRC & Local PDRs' PD4-1 Reading.
i S. Bloom E. Adensam H.' Rood.
P. Noonan ACRS(10) (P-315)
A..B. Beach,:RIV J.-Roe OGC(15B18)-
j 0FC LA:PD4-Ata-PM:Pp4-1 D(A):PD4-1 j
NAME PNoonan [ SBhpk.
HRood h 9 / /33 2[2T/93 7 N93
[
DATE'
/
YEf/ h - [YES)N0'-
Xi /NO COPY v
s 0FFICIAL RECORD COPY Document Name: FC85843.ltr 4
e l.
. pmErc,o
/
t UNITED STATES
[
.flf NUCLEAR REGULATORY COMMISSION
- N WASHINGTON, D.C. 20!ES-0001
)[*
July 29, 1993 Docket No. 50-285 Mr. Terry L. Patterson Division Manager - Nuclear Operations Omaha Public Power District Fort Calhoun Station FC-2-4 Adm.
Post Office Box 399 Hwy. 75 - North of Fort Calhoun Fort Calhoun, Nebraska 68023-0399
Dear Mr. Patterson:
SUBJECT:
TOPICAL REPORT OPPD-NA-8301, " RELOAD CORE ANALYSIS METHODOLOGY OVERVIEW," REY. 5 (TAC NO. M85843)
By letter dated February 5, 1993, as supplemented by letter dated June 25, 1993, you submitted proposed changes to the Fort Calhoun Station " Reload Core Analysis Methodology Overview" (OPPD-NA-8301, Rev 4). The NRC staff has reviewed the proposed changes and finds them acceptable.
A copy of the Safety Evaluation is enclosed.
Sincerely,
.i
~
5teven D. Bloom, Project Manager Project Directorate IV-1 Division of Reactor Projects - III/IV/V Office of Nuclear Reactor Regulation
Enclosure:
Safety Evaluation cc w/ enclosure:
See next page
Vi
(
N j
)
. Mr; Terry L. Patterson 1
- Omaha Public Power District -
Fort Calhoun Station, Unit No. -
]
6 cc:
Harry H. Voigt, Esg.
]
LeBoeuf, Lamb,-Leiby & MacRae' l
'1875 Connecticut Avenue, NW Washington,.D.C. 20009-5728:
-i Mr. Jack Jensen, Chairman l
Washington County Board-of Supervisors B1 air, Nebraska'68008
'i Mr. Raymond P. Mullikin, Resident Inspector
.l U.S. Nuclear Regulatory Commission Post-Office Box 309 1
Fort Calhoun, Nebraska 68023
-Mr. Charles B. Brinkman, Manager Washington Nuclear Operations Combustion Engineering, Inc.
12300 Twinbrook Parkway,-Suite 330
- Rockville, MD 20852
]
- Regional. Administrator, Region IV U.S. Nuclear Regulatory Commission i
~611 Ryan: Plaza Drive,' Suite 1000 i
Arlington, Texas 76011 i
Harold Borchert, Director j
Division of Radiological Health
. Nebraska Department of Health 301 Centennial Mall,: South j
Post Office Box 95007 Lincoln,-Nebraska-68509-i f
Mr. James W. Chase, Manager j
Fort Calhoun-Station Post Office Box 399 Fort Calhoun, Nebraska 68023
[j 1
q 1
i f
t
.