July 30, 1993 Docket Nos. 50-413 Mr. David L. Rehn Vice President, Catawba Site Duke Power Company 4800 Concord Road York, South Carolina 29745

Dear Mr. Rehn:

SUBJECT:

CATAWBA NUCLEAR STATION, UNIT 1 - SAFETY EVALUATION REGARDING STEAM GENERATOR TUBE INTERIM PLUGGING CRITERIA MID-CYCLE INSPECTION (TAC NO. M86116)

By letters dated March 25, April 8, 21, 22, and 29, 1993, Duke Power Company submitted technical information intended to support continued operation of the Catawba Nuclear Station, Unit 1, for the remainder of fuel Cycle 7.

A mid-cycle steam generator tube inspection had been required by the NRC staff as a result of the implementation of an interim steam generator tube repair criteria during the previous refueling outage. This requirement was discussed in the Safety Evaluation accompanying the issuance of License Amendment No. 102 on September 25, 1992. The NRC staff has completed its review of the material referenced above and has found that the operation of Catawba Nuclear Station, Unit 1, for the remainder of fuel Cycle 7 to be acceptable. A copy of the staff's Safety Evaluation is enclosed.

Sincerely, ORIGINAL SIGNED BY:

Robert E. Martin, Senior Project Manager Project Directorate II-3 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation

Enclosure:

Safety Evaluation cc w/ enclosure:

See next page DISTRIBUTION:

DMatthews Glainas Docket File RMartin EMerschoff, RII NRC & Local PDRs LBerry JStrosnider, 704 PDII-3 R/F OGC, 15B18 KKarwoski, 7D4 SVarga ACRS (10), P-135 KEccleston, 10D4 PDII-3/LAj)

P6lll-E;/lyi PDEI,-3/D//l N

L.BERR[

b NTIh:cw D.NTHEhS m

9/M93 h/30/93 1/M/93 N

0FFICIAL RECORD COPY

/

s FILE NAME:G:\\ CATAWBA \\MIDCYCLE.SER I

\\_

930819 k

P" "0csy Yg"73g

  • n43 M ic PA E C E6JI B G 8 P Y

=

o. orc 2

Ti UNITED STATES

(

NUCLEAR REGULATORY COMMISSION g-WASHINGTON, D.C. 20555-0001 July 30, 1993 Docket Nos. 50-413 Mr. David L. Rehn Vice President, Catawba Site Duke Power Company 4800 Concord Road York, South Carolina 29745

Dear Mr. Rehn:

SUBJECT:

CATAWBA NUCLEAR STATION, UNIT 1 - SAFETY EVALUATION REGARDING STEAM GENERATOR TUBE INTERIM PLUGGING CRITERIA MID-CYCLE INSPECTION (TAC NO. M86116)

By letters dated March 25, April 8, 21, 22, and 29, 1993, Duke Power Company submitted technical information intended to support continued operation of the Catawba Nuclear Station, Unit 1, for the remainder ~of fuel Cycle 7.

A mid-cycle steam generator tube inspection had been required by the NRC staff as a result of the implementation of an interim steam generator tube repair criteria during the previous refueling outage. This requirement was discussed in the Safety Evaluation accompanying the issuance of License Amendment No. 102 on September 25, 1992. The NRC staff has completed its review of the material referenced above and has found that the operation of Catawba Nuclear Station, Unit 1, for the remainder of fuel Cycle 7 to be acceptable. A copy of the staff's Safety Evaluation is enclosed.

Sincerely,

//

/

// Robert E. Martin, Senior Project Manager r

Project Directorate II-3 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation

Enclosure:

Safety Evaluation cc w/ enclosure:

See next page

os Mr. David L. Rehn Duke Power Company Catawba Nuclear Station cc:

Mr. R. C. Futrell Mr. Alan R. Herdt, Chief Regulatory Compliance Man ger Project Branch #3 Duke Power Company U. S. Nuclear Regulatory Commission 4800 Concord Road 101 Marietta Street, NW. Suite 2900 York, South Carolina 29745 Atlanta, beorgia 30323 Mr. A. V. Carr, Esquire North Carolina Electric Membership Duke Power Company Corporation 422 South Church Strett P. O. Box 27306 Charlotte, North Carolina 28242-0001 Raleigh, North Carolina 27611 J. Michael McGarry, III, Esquire Senior Resident Inspector Winsten and Strawn Route 2, Box 179 N 1400 L Street, NW York, South Carolina 29745 Washington, DC 20005 Regional Administrator, Region II North Carolina Municipal Power U. S. Nuclear Regulatory Commission Agency Number 1 101 Marietta Street,-NW. Suite 2900 1427 Headowwood Boulevard Atlanta, Georgia 30323 P. O. Box 29513 Raleigh, North Ca-olina 27626-0513 Mr. Heyward G. Shealy, Chief Bureau of Radiological Health Mr. T. Richard Puryear South Carolina Department of Nuclear Technical Services Manager Health and Environmental Control Carolinas District 2600 Bull Street Westinghouse Electric Corporation Columbia, South Carolina 27602 P. O. Box 32817 I

Charlotte, North Carolina 28232 Mr. G. A. Copp Licensing EC050 County Manager of York County Duke Pow.

'ompany York County Courthouse P. O. Boy. '16 York, South Carolina 29745 Charlotte, furth Carolina 28201-Richard P. Wilson, Esquite Assistant Attorney General Saluda River Electric South Carolina Attorney General's P. O. Box 929 Office Laurens, South Carolina 29360 P. O. Box 11549 Columbia, South Carolina 29211 Ms. Karen E. Long Assistant Attorney General i

s Piedmont Municipal Power Agency North Carolina Department of Justice-121 Village Drive P. O. Box 629 Greer, South Carolina 29651 Raleigh, North Carlina 27602

)

i j

l 1

1 s

.