Monthly Operating Repts for Jul 1993 for Jm Farley Nuclear Plant,Units 1 & 2
ML20056D723
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 07/31/1993
From: Hill R, Dennis Morey
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9308170374
Download: ML20056D723 (10)


Text

Southern Nudear operatmg Company

. Post office Box 1295  !

o- , Birmingham, Alabama 35201 Telephone (205) 868-5131 L

o.v. uor , Southern Nudear Operating ' Company -

  • Vee President Farley Project the Sou hern electnC System AUGUST 11, 1993 Docket Nos. 50-348 50-364 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Joseph M. Farley Nuclear Plant Monthly Operatino Data Reoort Gentlemen:

Attached are the July 1993 Monthly Operating Reports for Joseph M. Farley Nuclear Plant Units 1 and 2, as required by Section 6.9.1.10 of the Technical Specifications.

If you have any questions, please advise.

Respectfully submitted, r

[l{  ??tru Dave Morey RWC:scj(mor.let)

Attachments i

cc: Mr. S. D. Ebneter Mr. T.A. Reed J Mr. G. F. Maxwell l

m 1 1 O 3 9300170374 930731 PDR ADOCK 05000348 n.

- (j /hd j I

R PDR g 1

l I

bc: Mr. J. D. Woodard Mr. R. D. Hill (G9.03 & A4.05)  !

Mr. J. R. Derieux '

Mr. J. M. Elliott Mr. D. J. Shelton l' Mr. R. G. Cocherell Mr. O. Batum Mr. C. L Whatley -;

Mr. D. W. Glass Mr. R. E. Huffman Mr. Clem Eicheldinger Mr. M. G. McCorkle  !

Mr. John Hoffman l Mr. Russ Dedrickson -  !

Mr. Fred Yost l Mr. F. M. Jessup, til .

Mr. R. W. Clouse  !

INPO Records Center ANI Library Commitment Tracking System (2 copies)

File: A2.1 Document Control (1 copy) .

'f i

P W

i

, .- OPERATING DATA REPORT l

DOCKET NO. 50-348

+

DATE Aucust 6.1993 COMPLETED BY R. D. Hill TELEPIIONE (205) 899-5156  ;

1 DPERATING STATUS l

l 1. Unit Name: Joseph M. Farley - Unit 1 Notes

2. Reporting Period: iuly 1993 1) Cumulative data since M.652 12-01-77, date of
3. Licensed Thermal Power (MWI)-
4. Nameplate Rating (Gross MWe): 860 commercial operation
5. Design Electrical Rating (Net MWe): 829
6. Maximum Dependable Capacity (Gross MWe): 855.7
7. Maximum Dependable Capacity (Net MWe): 812.0
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: N/A
9. Power Level To Which Restricted, If Any (Net MWe): N/A
10. Reasons For Restrictions, if Any: N/A This Month Yr-to-Date Cumulative i

i

11. Hours In Reporting Period 744.0 5.087.0 137.327.0
12. Number Of Hours Reactor Was Critical 744.0 4.869.6 107.990.9 i
13. Reactor Reserve Shutdown Hours 0.0 0.0 3650.0
14. Hours Generator On-Line 744.0 4.849.9 106.233.6
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0 ;

16 Gross Thermal Energy Generated (MWH) 1.972.236.7 12.754.758.5 272.755.834.3 j

17. Gross Electrical Energy Generated (MWH) 627.302.Q 4.111.172.0 87.877.974.0 1
18. Net Electrical eEnergy Generated (MWH) 595.046.0 3.895.340.0 82.961.590.0 - )
19. Unit Service Factor 100.0 95.3 77.4 1
20. Unit Availability Factor 100.0- 95.3 77.4
21. Unit Capacity Factor (using MDC Net) 98.5 94.3 74.1
22. Unit Capacity Factor (Using DER Net) 96.5 92.4 72.9 1
23. Unit Forced Outage Rate 0.0 4.7 '6.6
24. Shutsowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Refuelinc/ Maintenance Outace September 24.1993. Annroximatelv 60 days.

25. If Shut Sown At End Of Report Period, Estimated Date of Srartup: N/A
26. Units In Test Status (Prior to Commerdial Operation): Forecast Achieved INITIAL CRITICALITY 08/06/77 08/09/77 INITIAL ELECTRICITY 08/20/77 08/18/77 COMMERCIAL OPERATION 12/01/77 12/01/77-I

DOCKET NO. 50-348 UNIT 1 i DATE Aucust 6.1993 COMPLETED BY R. D. Hill TELEPIIONE 0 05) 899-5156 MONTH Julv DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL

( MWe-Net) (MWe-Net) l 1 800 17 799 l

2 802 18 798 3 794 19 798 t

4 794 20 799 5 800 _ 21 799 6 798 22 801 -l l

l 7 799 23 800 8 804 24 799 9 802 25 799 10' 802 26 798 11 804 27 796 12 802 28 798 13 803 29 795 14 804 30 798 15 805 31 803 16 801 INSTRUCTIONS -

l On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

l

UNIT SHUTDOWNS AND POWER REDUCTIONS' ,

DOCKET NO. 50-348 UNIT NAME J. M. Farley - Unit 1 DATE Aurust 6.1993 COMPLETED BY R. D. Ifill REPORT MONTil: Julv TELEPilONE (2051 899-5156 A-_ LICENSEE CAUSE AND CORRrC'11VE METHOD OF DURA 110N 511U1 TING EVENT SYSTEM COMIUNpNT AC110N TU NO DATE TYIT I (HOURS) RFASON 2 powN RFACTnu l' prpnRT s cond rode PulVENT RFritRRFVCE f

There were no shutdowns or power reductions during the month of July.

l. .

F 1: 2: 3: 4: . 5:

F: Forced - Reemm: . Method Exhibit G-tretructions for Exhibit I . $mme Source

~ 5: Sdelukd A - Equipment Failure (Explain) 1 - Manuel . Preparatens for Data Entry B . Maintmarre or Test - 2. Manuel Scrurn. Sheets for beermee Event C . Refueling .. 3 Autornetic Scrern Report (LER) File (NUREG-0161)

D Regulatory Restriction 4 Other(Explain)

E - Opermiar Trair,ing & lienning Examination F- Adrninistrutive -

G - Operational Error (Explain)

H Other(Exrlain)

__.1_._._...__.,___.

_ _ _ . _ _ _ . _ _ _ _ _ _ - _ _m_.____._ .__ . _ . . _ _ , _ . -_ : . - . . _ . . . . . , . .. _ _ , ., , . , _ . . .

i i

J Joseph M. Farley Nuclear Plant Unit I Narrative Summary Of Operations July 1993 ,

There were no unit shutdowns or major power reductions during the month of July.

The following major safety ralated maintenance was performed during the month:

1. Performed miscellaneous corrective and preventive maintenance on the diesel ,

generators.

i r

I

OPERATING DATA' REPORT DOCKET NO. 50-364 DATE Auuust 6.1993  :

COMPLETED BY R. D. Hill TELEPIIONE C05) 899-5156 OPERATING STATUS

1. Unit Name: Joseph M. Farlev - Unit 2 Notes
2. Reporting Period: July 1993 1) Cumulative data since ,

2.652 7-30-81, date of

3. Licensed Thermal Power (MWt): ,
4. Nameplate Rating (Gross MWe): 860 commercial operation
5. Design Electrical Rating (Net MWe): 829
6. Maximum Dependable Capacity (Gross MWe): 863.6
7. Maximum Dependable Capacity (Net MWe): 822.0
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: N/A
9. Power Level To Which Restricted, If Any (Net MWe): N/A
10. Reasons For Restrictions, if Any: N/A f

This Month Yr-to-Date Cumulative l

~

l

11. Hours In Reporting Period 744.0 5.087.0 105.240.0
12. Number Of Hours Reactor Was Critical 744.0 5.028.0 91.049.9
13. Reactor Reserve Shutdown Hours 0.0 0.0 138.0
14. Hours Generator On-Line 744.0 4.833.0 89.749.7  !

l 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0 L 16. Gross Thermal Energy Generated (MWH) 1.906.712.7' 12.514.362.1 229.045.309.9 l 17. Gross Electrical Energy Generated (MWH) 612.646.0 4.087.697.0 75.099.875.0

18. Net Electrical eEnergy Generated (MWH) 582.414.0 3.883.165.0 71.222.363.0
19. Unit Service Factor 100.0 95.0 85.3
20. Unit Availability Factor 100.0 95.0 85.3 >
21. Unit Capacity Factor (using MDC Net) . 95.2 92.9 82.5 .,
22. Unit Capacity Factor (Using DER Net) . 94.4 92.1 81.6
23. Unit Forced Outage Rate 0.0 5.0 3.8 24.' Shutsowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): .

N/A 1

i 2.5. If Shut Sown At End Of Repon Period, Estimated Date of Srartup: N/A 26 Units in Test Status (Prior to Commerdial Operation): Forecast Achieved l

INITI AL CRITICALITY 05/06/81 05/08/81 INITIAL ELECTRICITY 05/24/81 05/25181

- COMMERCI AL OPERATION 08/01/81 07/30/81

i-

^

f DOCKET NO. 50-364 UNIT 2  :

. DATE Aucust 6.1993 CO51PLETED BY R. D. Hill  ;

TELEPIlONE (205) 899-5156 4

' MONTH Julv l

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL .-

( MWe-Net) (MWe-Net) l 1 716 17 803 ,

2 571 18 804 3 635 19 804 4 638 20 804 5 763 21 804 8

6 805 22 806 7 805 23 806 8 810 24 803 ,

i 9 806 25 803 10 807 26 803  ;

4 11 809 27 802 1 12 809 28 804-  !

13 808 29 802 ]

14- 808 30 805

15. 809 31 811 H

16 805 l

INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole_ megawatt.

l.

4

=

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKLT NO. So-3M UNIT NAME J. M. Farley - Unit 2

.DATE Aucust 6.1993 COMPLETED BY R. D. Ifill REPORT MONTil: Julv TELEPIIONE (205) 899-5156 METHOD OF tJCENSEE CAUSE AND CORRFCTIVE

- DURATION SHUTTING EVENT SYSTEM COMPONjhT ACTION TO 4

NO DATE TYPE I POUR 9 RTMON 2 DOWN REACTOR I REinRT # CODF CODE l'RrVENT RFCt?RRENCE At 1622 on 07-01-93, reactor power was reduced to 004 07/01/93 F 88.5 A N/A N/A N/A N/A 53 percent power due to the loss of the 2B H circulating water pump motor due to a lightning strike.

The pump motor was replaced and the unit was returned to 99 percent power on 07-05-93 at 0852 hours0.00986 days <br />0.237 hours <br />0.00141 weeks <br />3.24186e-4 months <br />.

I: . 2: 3: 4: 5:

F: Forced ~ Renann:- Aethod Exhibit 0-Instructens for Exhibit I- Some Source 5: Scheduled . A - Equipment Failure (Explain) 1 - Manuel Prererstions for Data Entsy B Maintenance er Test 2 - Manual scrum. Sheets for Lacensee Event C Refueling 3 - Auenmatic Scram Report (IER) File (NUREG-0161)

D - Regulatory Restriction 4 - Other (Explain)

E- Opersior Training & IJcensing Examination

' F 6 Administrative G . Operstwnst Ener (Explain)

H + Other (Expimin)'

._.2 . . . ~ . . ....--; . , . . _ . - . ._. .- - . - - _ . - . . . - . .- - . _. 4 _. _ , _ _ . . . . _ _ _ . _ _ . _ _ _

i i

\

Joseph M. Farley Nuclear Plant Unit II Narrative Summary Of Operations j July 1993 There were no unit shutdowns during the month of July.

At 1622 on 07-01-93, reactor power was reduced to 53 percent power due to the loss of the 2B circulating water pump motor due to a lightning strike. The pump motor was replaced and the  ;

unit was returned to 99 percent power on 07-05-93 at 0852.

l The following major safety ralated maintenance was performed during the month:

I

1. Performed miscellaneous corrective and preventive maintenance on the diesel l generators.

e i

t t

l 5