Monthly Operating Rept for Jul 1993 for Callaway Plant,Unit 1
ML20056D697
Person / Time
Site: Callaway 
Issue date: 07/31/1993
From: Blosser J, Mcinvale J
UNION ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
ULNRC-2839, NUDOCS 9308170337
Download: ML20056D697 (6)


Text

_

Ca%cy PNnt

^ '

' Pcu ffce Box E20 Tuttor.1/:non 5'.2p i

August 9,1993 UNION Euicnuc 33 l

Nuclear Regulatory Commission Document Control Desk WarNngton, DC 20555 ULNRC.2839 A

Dear Sir:

DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 MONTHLY OPERATING REPORT JULY.1993 The enclosed Monthly Operating Report for July,1993 is submitted pursuant to section 6.9.1.8 of the Callaway Unit 1 Technical Specifications.

f f

.W' A.D.Blosser t

4

/^

Manager, Callaway Plant I

A bi 6/

y e

JDB/DEY/J AM/

crc

/

Enclosure cc: Distribution attached f

f r

i i /

I

/

9308170337 930731 0

PDR ADOCK'05000483 fj

/

{

-R PDR g

G r.

I l

cc distribution for ULNRC-2839 i

-q with enclosures

.f Mr. I. N. Jackiw, Chief Reactor Projects Section 3C U.S. Nuclear Regulatory Commission RegionIII 799 Roosevelt Road Glen Ellyn,IL 60137 Mr. L._R. Wharton (2 copies) l Office of Nuclear Reactor Regulation l

U.S. Nucicar Regulatory Commission i White Flint, North, Mail Stop 13E21 i

1155 Rockville, MD 20852

~

NRC Resident Inspector i

Manager, Electric Department

[

Missouri Public Senice Commission P.O. Box 360 Jefferson City, MO 65102 t

b

i s

N'.

4 DOCKET NO.

50-483 UNIT NAME CALLAWAY UhTT I DATE 8-09-93 COMPLETED BY J. B. Mcimale TELEPHONE 314/676-8247 PART A OPERATIONS

SUMMARY

The plant operated at approximately 100% power for the entire month with the following exception:

On 7-18-93 load was reduced to 91% to perform repairs on low pressure feedwater heaters. Full power operation resumed on 7-19-93.

PART B PORV AND SAFETY VALVE SUhBIARY None Page.1of4

1 i

I PART C AVERAGE DAILY UNIT POWER LEVEL DOCKET NO $0-483 5

UhTT Callaway Unit 1 DATE 8-09-93 COMPLETED BY J. 8. McImale TELEPHONE 314/676-8247 MONTH: JULY 1993

.i AVERAGE DAILY PGWER LEVEL AVERAGE DAILY POWER LEVEL l

'I l

DAY (MWe-Neo Dfy (MWe-Neo I

1 1132 17 1100 2

1132 18 M48 t

3 112s 19 1072 4

1127 20 1131 i

l 5

1130 21 1137 6

1141 22 1132 7

1140 23 1118 j

8.

1118 24 1105 9

1123 25 1106 l

10 1125 26 1126 11 1129 27 1111 l

12 1135 28 1131 1

13 1133 29 1133 j

14 1137 30 1133 i

15 1134 31 1112 t

16 1122 j

i J

]

i Page 2 of 4

q 4

j PARTD OPERATING DATA REPORT DOCKET NO. 50-483 j

UNIT NAME CALLAWAY UNn'I

_}

DATE ' 849-93

)

COMPLETED BY J. B. McIm ale i

{

TELEPHONE 314/676-8247 f

OPERATING STATUS (Y1D) - (CUM) 1.

REPORTING PERIOD: JULY 1993 GROSS IIOURS IN REPORTING PERIOD:

744 5087 75,492.5 l'!

2 CURRENTLY AtTrilORIZED POWER LEVEL (MWt): 3565 MAX. DEPEND. CAPACITY (MWe-Net): I120 t

DESIGN FLECTRICAL RATINO (MWe-Net): 1171 h

3.

POWER EVEL TO WIIIC11 RESTRICTED (IF ANY)(MWeNet):

I 4.

REASONS FOR RESTRICTION (IF ANT)-

i TIIIS MONTH YR TO DATE CUMULATIVE 5.

NUMBER OF 110URS REACTOR WAS CRITICAL 744 0 5,087.0 66,464.7 6.

REACIDR RESERVE SIItRDOWN llOURS 0

0 0

t 7.

IIOURS GENERA 1DR ON llNE 744.0 5,087.0 65,142.7

[

8.

UNIT RESERVE SlitTIDOWN1IOURS. -

0 0

0 9.

GROSS TIIERMAL ENERGY GENERATED (MWII).

2,612,147 17,742,593 218,822,543 10.

GROSS ELECTRICAL ENERGY OENERATED (MWil).

875,696 6,083,725 74,645,621

[

II.

NET ELECTRICAL ENERGY GENERATED (MWH) 835,626 5,807,284 70,981,382 12.

REACTOR SERVICE FAClVR.

100.0 -

100.0 88.0 13.

REACTOR AVAILABIIJTY FAC1DR 100.0 -

100.0 88.0

[

14.

UNIT SERVICE FACTOR 100.0 100.0 86.3' 15.

UNIT AVAILABillTY FACTOR 100.0 100.0

- 86.3 t

16.

UNIT CAPACITY l /w' TOR (Using MDC).-

100.3-101.9.

. 84.0 -

i 17.

UNIT CAPACITY FACTOR (Usmg Design MWe).

95.9 97.5 80.3 [

1 18 UNITICRCED OLTIAGE RATE 0.0 0.0 2.63 19.

SIRTTDOWNS SCIIEDULED OVER NEAT 6 MONTHS (TYPE, DATE, AND DURATION OF EACII): Refueling; Date: 10SI/93 -

.l f

Durstum: 56 days 20.

IF SIIUT DOWN AT END OF REPORTING PERIOD, ESTIMATE DATE OF STARTUP:

l 1

6 i

1

.l i

Page 3 of 4 J

s P

PART E UNrr SIIUTDOWNS AND POWER REDUCTIONS DOCKET NO.30-423 UNIT NAME CAllAWAY LSTr i DATE 8 4 93 COMPLETED BY J. B. McInvale TELEPIIONE 314/676-8247 REPORT MONTIL JULY 1993 METilOD OF TYPE S!!UITING DOWN F: FORCED DURATION TIIE REACTOR OR En DATE

$; SCIIEDULED (IIOURS)

REASON REDUCING POWER CORRICTIVF/ACDONSU)MMENTS

SUMMARY

REASON METilOD A IQUIPMENTFAILURE(EXPLAIN) 1: MANUAL

. D MAINT.OR TEST

' 2: MANUALSCRAM C: REFUELING '

. 3: AUTOMATIC SCRAM D-REGULATORY RESTRICTION -

4: OTilER(EXPLMN)

E: OPERATORTRAINING AND LICENSE EXAMINATION F: ADMINISTRATION 0: OPERATIONALERROR(EXPLAIN)

II: OTiiER(EXTLAIN)