ML20056D604
| ML20056D604 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 07/31/1993 |
| From: | Darling J, Marsh W SOUTHERN CALIFORNIA EDISON CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9308170151 | |
| Download: ML20056D604 (7) | |
Text
[.
,f"f?
-l Southem Califomia Edison Company 23 PARKER STREf,T l
IHVfNE., CALIFORN'A 92718
'l WAL1ER C. MARSH TB1 PHONE anAsvAm Mtw wonTam nEc.utAT<my ar r Aems (71m) 4s4 440a 1
I U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C.
20555 Gentlemen:
l
Subject:
Docket No. 50-206 Monthly Operating Report for July 1993 San Onofre Nuclear Generating Station, Unit 1 Technical Specification 6.9.1.10 of Possession Only License DPR-13 for the San Onofre Nuclear Generating Station, Unit 1,. rr. quires SCE to provide a Monthly Operating Report which includes routine operating statistics, shutdown experience, and all challenges to pressurizer safety and relief valves.
i This letter transmits the July 1993 Monthly Operating Report t w Unit 1.
There were no challenges to pressurizer safety or relief valves during this 1
reporting period.
If you require any additional information, please let me know.
Sincerely, I
il j
Enclosure 1
cc:
R. H. Faulkenberry, Regional Administrator, NRC Region V
'l S. W. Brown, NRC Project Manager, San Onofre Unit 1 R. F. Dudley, Section Chief, Non-Power, Decommissioning, and-i Environmental Project, Directorate of Reactor Project 3, 4 &-5 C. W. Caldwell, NRC. Senior Resident Inspector, Units 1, 2 & 3
~
i r
)
/
I 9308170151 930731 I
M 8
PDR ADOCK 05000206 g
R PDR lL a
a
1 g
Document Control Desk
~
NRC MONTHLY OPERATING REPORT DOCKET NO: 50-206 UNIT NAME: SONGS - 1
)
DATE:
COMPLETED BY:
J. L. Darlina i
TELEPHONE:
(714) 368-6223 OPERATING STATUS 1.
Unit Name: San Onofre Nuclear Generatina Station Unit 1 2.
Reporting Period:
July 1993 3.
Licensed Thermal Power (MWt):
None Authorized 4.
Nameplate Rating (Gross MWe):
456 e
5.
Design Electrical Rating (Net MWe):
436 6.
Maximum Dependable Capacity (Gross MWe):
Not Apolicable 7.
Maximum Dependable Capacity (Net MWe):
Not Applicable 8.
If Changes Occur In Capacity Ratings (Items Number 3 Through 7)
Since Last Report, Give Reasons:
NA NA 9.
Power Level To Which Restricted, If Any (Net MWe):
See Item 10 10.
Reasons For Restrictions, If Any: A Postession Only License was issued on
.i October 23. 1992 and became effective on March 9. 1993.
This Month Yr.-to-Date Cumulative 11.
Hours In Reporting Period 744.00 5,087.00 224,252.00 12.
Number Of Hours Reactor Was Critical 0.00 0.00 129.980.09 13.
Reactor Reserve Shutdown Hours 0.00 0.00 0.00 14.
Hours Generator On-Line 0.00 0.00 126,040.52 15.
Unit Reserve Shutdown Hours 0.00 0.00 0.00 16.
Gross Thermal Energy Generated (MWH) 0.00 0.00 158.041.722.52 17.
Gross Electrical Energy Generated (MWH) 0.00 0.00 52,949,635.00 18.
Nr.t Electrical Energy Generated (MWH)
(653.00)
(9,310.00) 49,932.472.00 19.
Unit Service Factor
- NA NA 57.14%~
20.
Unit Availability Factor *-
NA NA 57.14%
21.
Unit Capacity Factor (Using MDC Net)
- NA NA 51.94%
22.
Unit Capacity Factor (Using DER Net)
- NA NA 51.94%
23.
Unit Forced Outage Rate
- NA NA 17.90%
- Final Lifetime Factors.
24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
On November 30, 1992 SONGS l was permanently shutdown.
i 25.
' ' Shutdown At End Of Report. Period, Estimated Date of Startup:
NA' 26.
3ts In Test Status- (Prior, To Commercial Operation):
Forecast Achieved INITIAL CRITICALITY NA NA INITIAL ELECTRICITY NA NA l
COMMERCIAL OPERATION NA NA i
mor.Jul/2
Docu, ment Control Desk AVERAGE DAILY UNIT POWER LEVEL DOCKET NO:
50-206 UNIT NAME:
SONGS - 1 DATE:
CCMPLETED BY:
J. L. Darlina TELEPHONE:
(714) 368-6223 MONTH: July 1993 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 0.00 16 0.00 2
0.00 17 0.00 3
0.00 18 0.00 4
0.00 19 0.00 5
0.00 20 0.00 6
0.00 21 0.00 7
0.00 22 0.00 8
0.00 23 0.00 9
0.00 24' O.00 10 0.00 25 0.00 11 0.00 26 0.00 12 0.00 27-0.00 13 0.00 28 0.00 14 0.00 29 0.00 15-0.00 30 0.00 31 0.00 mor.jul/3
D:cument Control Desk-s.
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO:
50-206 UNIT NAME:
SONGS - 1 REPORT MONTH: July 1993 DATE:
COMPLETED BY:
J. L. Darlina -
TELEPHONE:
(714) 368-6223 Method of
' Shutting Cause & Corrective Duration Down LER System Component Action to No.
Date-Type (Hours)- Reason Reactor No.
Code' Code' Prevent Recurrence 2
157 921128 S
744 H
1 NA NA NA See note below Note:
Unit was shut down following completion of cycle 11.
The shutdown commenced at 1900 on 11/28/92 and was completed at 0501 on 11/30/92. The Unit will.not resume operation.
rReason:
' Method:
"IEEE Std 805-1984 S-Scheduled.
A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Scram.
S C-Refueling 3-Automatic Scram.
IEEE Std 803A-1983 D-Regulatory Restriction 4-Continuation from
.E-Operator Training &. License Examination Previous Month' F-Administrative 5-Reduction in the Average G-Operational' Error (Explain)
Daily Power Level of more H-Other -(Expl ain) than 20% from the previous day 6-Other (Explain) mor.jul/4;
. ~.
t
.c Document Control Desk l
l
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO: 50-206 UNIT NAME: SONGS - 1 DATE:
COMPLETED BY:
J. L. Darlina TELEPHONE:
(714) 368-6223 Date Time Event 07/01/93 0001 Unit is defueled, systems being aligned l
for SAFSTOR.
07/31/93 2400 Unit is defueled, systems being aligned for SAFSTOR.
I i
i i
e mor.jul/5
O Document Control Desk REFUELING INFORKATION DOCKET NO:
50-206 UNIT NAME:
SONGS - 1 DATE:
COMPLETED BY:
J. L. Darlina TELEPHONE:
(714) 368-6223 MONTH:
July 1993
- 1. Scheduled date for next refueling shutdown.
Unit permanently shutdown on November 30, 1992 3
- 2. Scheduled date for restart following refueling.
None.
- 3. Will refueling or resumption of operation thereafter require a Technical i
Specification change or other license amendment?
Operation will not be resumed. A Possession Only License was issued on r
October 23, 1992, which became effective on March 9, 1993 when the NRC was notified that all fuel had been offloaded from the core.
- 4. Scheduled date for submitting proposed licensing action and supporting information.
Proposed Permanently Defueled Technical Specifications (PDTS) were submitted for NRC approval on May 12, 1993.
- 5. Important licensing considerations associated with refueling, e.g.'new or different fuel design _ or supplier, unreviewed design _ or performance analysis methods, significant changes in fuel design, new operating procedures.
Not applicable.
mor.jul/6
p Document Control Desk REFUELING INFORMATION DOCKET N0:
50-206 UNIT NAME:
SONGS - 1 DATE:
COMPLETED BY:
J. L. Darlina TELEPHONE:
(714) 368-6223 MONTil:
July 1993
- 6. The number of fuel assemblies.
a)
In the core.
O b)
In the spent fuel storage pool.
207
- 7. Licensed spent fuel storage capacity.
216 Intended change in spent fuel storage capacity.
None
- 8. Projected date of last refueling that can be discharged to spent fr.el storage pool assuming present capacity.
During March the final Unit I core, of 157 fuel assemblies, was discharged into the spent fuel pool.
+
i mor.jul/7